Joke Collection Website - News headlines - What is the standard for setting up signs on the expressway construction site?
What is the standard for setting up signs on the expressway construction site?
First, the site safety signs of special projects or major and medium-sized repair projects shall be executed in strict accordance with the warning zone, upstream transition zone, buffer zone, operation zone, downstream transition zone and termination zone.
The total length of 1, warning zone, upstream transition zone and buffer zone shall not be less than1500m, and signs such as "Construction ahead", "No overtaking", "Narrowing the lane ahead", "No traffic", "Guidance" and "Speed limit" shall be uniformly set in this area. Signs should be made according to GB 5768- 1999 standard. Roadblocks and isolation piers should be set up in the buffer zone; ?
2. The operation area is the stacking place for construction personnel's operations and construction materials. Construction materials must be neatly stacked, and shall not be too high and occupy the driving lane of passing vehicles. Construction machinery must be painted orange according to the standard, and isolation piers must be set between the working area and the driveway.
3. The length of the termination area should not be less than 50m, and a termination sign must be set at the end of the termination area.
Two, traffic control minor repairs and maintenance operations, it is really necessary to occupy motor vehicles, should be implemented in accordance with the above provisions; Otherwise, square warning signs, speed limit signs and no overtaking signs should be set up.
, "guide" signs and lane isolation piers, etc. , and the distance between the sign shall not be less than 300 m; ?
3. If construction is needed at night, a yellow support warning signal should be set in the upstream transition zone, and a lighting lamp should be set in the operation area. Construction is generally prohibited in bad weather such as night, rain and fog.
Four, the construction is all over, first clean up the work area, and then quickly remove all signs opposite to the traffic direction.
Extended data:
Matters needing attention in expressway construction:
1. Smoking is not allowed during construction.
2, materials, components and other items classification code put neatly. Collect materials, transport earthwork, sand and gravel, etc. , and timely cleaning and maintenance, and will not spill along the way.
3. The garbage generated in the construction must be classified and piled up and cleaned up in time. Finish the work and clean up the materials.
4. Unite with comrades and care about others. It is forbidden to go to work after drinking, make trouble after drinking, fight, gang up and call names, which will not contribute to the work.
5, site construction personnel must correctly use the relevant machinery and equipment. You must check whether all safety facilities are safe and reliable before taking up your post.
Baidu Encyclopedia-Architectural Signs
Baidu Encyclopedia-Technical Guide for Standardization of Expressway Construction
- Previous article:Slogans about smoking ban
- Next article:What does it mean to keep a pet without disturbing people?
- Related articles
- Xiehouyu and idioms solitaire
- Please design an advertisement or slogan to protect the earth! Thanks
- The causes of the imbalance of sex ratio and the harm caused by the imbalance of sex ratio
- Dong Gang's performance experience
- Construction site safety and fire protection slogan banner
- Set the code for the traffic lights?
- Slogan English for Sports Games Athletes
- Summary of all answers to the "Bi Li Bi Li" hardcore membership activities
- How to draw a safety escort happy growth handwritten newspaper
- Advantages of energy-saving water boiler