Now integrated wall has become the mainstream product of wall decoration, and it is also very popular with owners. But for people who decorate for the first time, they still don't know much about these materials and don't know its installation. Next, what are the main points of integrated wall installation? And what are the precautions for integrated wall installation? If you want to know, let's take a look.

First, what are the main points of integrated wall installation?

1. Preparation materials: art knife, table cutter (high-speed serrated saw blade), grinder (serrated saw blade), ruler, tape measure, triangular file, curve saw, 3P air pump, cement nail gun, wood square: structural parts mainly used for top light return. Wood board: mainly used for background wall. Corner line: Some corners are closed.

2. Installation calculation: the estimated wall area of home improvement is 3 times of the floor area, basically including the wall and the top. The basic installation area is in this area. Accounting method for measuring the actual area by household: according to the measured area, the height from the top to the ground is basically guaranteed to be no less than 2.75M after the light strip is completed, and the unnecessary losses of consumers during the installation process are guaranteed as much as possible after accounting.

3. Material preparation calculation: two pieces of material preparation are guaranteed to be in the same wall. The background wall needs to be spliced, and a large number of places should be prepared to be more than 0.5 square meters.

4. Construction steps: Wood structure of top reflective belt and background wall: make wood structure according to design requirements, and pay attention to the operation. There are enough points to fix the integrated wall; Ensure the straightness of the wood square edge; Try to make the dimensions on both sides of the right angle equal; The structure is relatively firm; After the wood structure is completed, the actual wiring is carried out and the electrical connection ports are reserved. Water pipe layout and floor installation. Top-mounted integrated wall, generally integrated wall is installed from the top during the installation process. In the process of cutting the plate, it is necessary to make the cross section of the material straight and burr-free. The higher the speed of the cutting saw, the less burrs there are. The measurement error must be within 2MM, otherwise the flat-fell seam will be extremely untidy. Wall and background wall installation, in this installation process, such as the use of internal corner line, foot line, waist line, door cover line, window cover line, etc. , the line is installed, and the integrated wall is installed.

5. Installation details: right-angle bending. In the process of bending, the wall thickness must be included in the bending line (for example, the column is bent at a right angle, the first piece of material is 5CM away from the right angle, the bending line is in the protruding part, the bending line should be at 5.8CM, and so on). ) Pay attention to the bending process, draw the bending line first, then take polyurethane material, about 8 mm, and bend as straight as possible. 45-degree splicing of concave-convex plates: After the plates are cut at 45 degrees, the burrs are ground flat and then spliced. Pay attention to the right angle when splicing, as shown in the figure: right angle splicing of concave and convex plates: the inner side of the splicing plate is polished to a 45-degree angle for splicing, and the splicing plate is directly inserted into the notch of another plate. Pay attention to angle control when grinding. Inner corner splicing of concave-convex plate: the outer side of splicing plate is polished to a 45-degree angle for splicing, and the splicing plate is directly inserted into the notch of another plate. Pay attention to angle control when grinding, and its principle is the same as right-angle splicing.

6. Acceptance criteria: the seams of flat materials are neat; The closed position does not affect the appearance at all; The material is firmly fixed, and there is no hole in the attached wall material; Reasonable color; The internal insulation layer has no external leakage; Corrugated plate butt joint is complete without burr; Whether the folds are at right angles, smooth and beautiful.

Second, the main points of integrated wall installation-what are the precautions for integrated wall installation?

1, the problem of integrated wall protection film, in order to protect the clean and beautiful integrated wall, integrated wall manufacturers will cover the surface of integrated wall with a film without being scratched. This film needs to be torn off before installation, and the slogan "Please tear it off before installation" is also marked on this film, but considering the dust problem during installation of integrated wall, many people still tear it off after installation.

If the integrated wall is torn off after installation, it will be difficult to tear off the protective film inside the gusset plate, which will affect the appearance. The integrated wall is installed with node plates. Tear off the protective film during installation, which will be more compact and leave no gaps. If it is torn after installation, it may leave a gap.

2. The wall is too uneven. Integrated wall installation has low requirements for wall surface, and blank wall can be installed directly, but the wall surface is too uneven. Due to the irregular size of the blank house, when there is deviation between the left and right sides of the wall, avoiding the protruding part of the wall as the junction of the two boards will lead to the widening of the gap and affect the appearance. A single plate can be simply slotted.

You can fill the leveled wall with gypsum or cement, and then test whether the wall is flat or not through a horizontal line. If you don't keep a certain elevation, you can also use the method of installing wood squares to level the wall.

The above contents are the introduction of the main points of integrated wall installation and the matters needing attention in integrated wall installation.