Joke Collection Website - News headlines - Job responsibilities of the driller

Job responsibilities of the driller

Driller 1 1 Job responsibilities. Strict "three-press" production, confirm that the benchmark provided by marking is correct before processing.

Second, adhere to the "three self-control" to ensure product quality.

Three, carefully clean up the flash, burr and iron filings.

Four, the rational use of labor insurance supplies, are not allowed to wear gloves when processing.

5. Clean up the work site in time, place the workpieces reasonably, and achieve "five don't go".

Six, responsible for the daily maintenance and primary maintenance of the equipment, cooperate with the equipment maintenance to do the secondary maintenance of the equipment, and fill in the maintenance records according to the regulations to ensure that the equipment is in good condition and does not run in spite of illness.

Seven, responsible for maintenance, maintenance, correct use, according to the designated area reasonable placement.

Duties of Driller Part 2 Main functions:

1, according to the production plan, complete or exceed the production tasks with high quality, high efficiency and low consumption.

2, in strict accordance with the procedures and requirements of equipment operation procedures to complete the drilling task, master the technical content and requirements of this position.

(a) Don't leak holes when drilling. No matter whether you use a marking template or a jig to drill holes, everyone should mark their own lines.

(2) When drilling, don't slant the hole. When drilling with cross template, the drilling position should be located accurately to ensure that the hole position deviation is ≤1mm when drilling; When drilling with drilling template, always check whether the inner diameter of drilling sleeve is enlarged and the shape is elongated. In case of out-of-tolerance (expanded elongation ≥0.5mm), contact the mold repairman for replacement immediately.

(3) After the hole is processed, the burr must be smoothed with a grinding wheel.

(4) After drilling with cross formwork, all iron filings and residues must be removed.

(five) timely and accurately make all kinds of records in production.

3. According to the inspection results of the quality inspector, adjust the corresponding process parameters in time to make the product quality meet the process requirements.

4. Actively participate in rationalization proposals.

5. Do a good job in the first-level maintenance and daily maintenance of the drilling rig, and fill in the notice in time.

(a) the machine tool is often wiped, and the appearance is clean without rust and yellow robe.

(two) the oil circuit is smooth, the oil window is bright, the oil cup is complete, the oil quality is good, and the oil level is correct.

(3) the electric box is clean, the limit device is reliable, and the guide column is clean.

(4) Clean up the site before coming off work, maintain the machine tools, and put the drilling rigs in place.

6, adhere to civilized production, not barbaric construction, can't use rough drill or die handle as a hammer.

Job responsibilities of driller 3. 1. Operating procedures for driving safety.

1. Only the designated person can drive the car after training;

2. Before starting the engine, check whether diesel oil, engine oil and water are sufficient, and turn on the main power switch; Then check the hydraulic oil level and the oil level indicated by the diesel oil meter;

3. Do not start the internal combustion engine unless the gear switch is in the middle position;

4. After starting, check whether the indicator light goes out (the light 1# goes out only after releasing the brake);

5. Before driving, make sure there is no one beside the car, and then check whether the arm is put away, so as not to affect the line of sight;

6. Confirm whether the jack is fully retracted and whether there is anyone in front of the driving direction;

7, depending on the road conditions should be slow, up and down the hill are not allowed to hang gap;

8. Pay attention to the front and indicator lights when driving;

9. After the operator gets off the bus, the trolley should be supported by the hand brake and jack.

10, flameout should be turned off by the handle. Do not try to turn the ignition switch to flameout, and turn off the main power switch after flameout.

Second, the driller's job responsibilities

1. During trolley operation, the driller should concentrate on it, closely cooperate with the ground commander, and strictly control over-excavation and under-excavation.

2. The personnel on duty must make a record of trolley operation "Report of trolley operation cycle shift" and hand it over to the maintenance shift.

3. Make a record of quantity signing and recognition.

4. The driller of drilling rig is specialized and more refined.

5. There is a center and five basic points on the constraint surface.

6. In the aspect of beam positioning, strengthen a parallel line and two basic points.

The driller's duty is 4 1. Be responsible for drilling construction and maintenance of drilling equipment under the guidance of the vice squad leader.

2, strictly implement the construction measures, abide by the operating procedures, according to the rules, to ensure safety in production.

3, keep the drill floor clean, all kinds of tools and materials stored neatly, do a good job in civilized production.

4, abide by labor discipline and rules and regulations, and strive to complete the tasks assigned by the leadership.

5. Report the potential safety hazards found in time.

The driller's duty is 5 1. Obey the production command, observe the labor discipline and stick to the post. Strictly implement safety regulations, safety technical operation regulations and pneumatic driller management system.

2. Complete the blasting production task with good quality and quantity. On the basis of completing the drilling task, actively cooperate with other types of work to do a good job.

3. Find out the engineering intention, obey the command of on-site technicians and safety management personnel, and carry out the construction in strict accordance with the design.

4. Maintain equipment, keep tools, save raw materials and accessories, and continuously reduce consumption costs.

5. Adhere to safety production day activities, do a good job in safety production and industrial hygiene in the workplace, adhere to the system of succession, and fill in the original records of this type of work.

6. Study hard on technical and business knowledge to reach the standard of knowing and reaching the corresponding level of this type of work.

The duties of a driller. Hold a pre-shift meeting, make work arrangements according to the production tasks, let everyone in the class know the tasks and safety precautions of the class, and ensure orderly production and safety without accidents.

2. Check the working conditions of the main brake and the auxiliary brake system.

3, check the dead rope, live rope head fixed and rope with or without broken wires.

4. Check all steel cables, feeds, winches and slings.

5, check the hydraulic system, good performance, sensitive and reliable instrument.

6. Check the lifting system and power tongs.

7, anti-collision crown device must be sensitive and reliable.

8, command post personnel to clean the drill floor, easy to operate.

Job responsibilities of driller 7 1. All parts of the drilling pump are complete, the protective cover is complete and the bolts are fastened.

2, check the safety valve shear pin and positioning, pump pressure gauge.

3. The cooling water (oil) flow channel is smooth and the lubricating oil is sufficient.

4. The pre-inflation pressure of the airbag meets the requirements.

5, clear the high pressure manifold gate switch state.

6. Before starting the pump in winter, low-pressure test run should be carried out, and the safety valve and pump pressure gauge should be preheated with steam.

The duties of a driller. Be responsible for the installation, inspection, maintenance, repair and sanitation of wellhead BOP, gates and valves on both sides of four-way and gate valves on both sides of casing head.

2, actively participate in emergency activities, in accordance with the requirements of the emergency plan to carry out the actions of this position.

3. Be responsible for observing downhole conditions, and report to the driller as soon as possible if any danger is found.

4. Before entering the target formation, start to be on duty at100m until completion. At any time, the duty officer is inseparable from people and needs continuous observation. Fill in the duty record every 10- 15 minutes. The recorded data must be true and reliable, and reflect the actual situation in time.

Job responsibilities of driller 9 1. Drilling tools in the well site should be arranged neatly according to the internal thread end face, the ground and interlayer should be crushed, and the two ends should not be suspended for more than 2m. Stack no more than three layers at most to prevent both ends of the pipe rack from falling, and no other foreign objects shall be placed below.

2. The internal and external threads of downhole drilling tools are clean and intact, the water hole is clear and clean, and the body meets the standards.

3. On-site drilling tools should be placed neatly.

4. When lifting a single pipe onto the drill floor, pry the drill pipe onto the gate ramp, tighten the lifting thread protector and wear the external thread protector, and contact the drill floor for lifting after the personnel stand in a safe position.

5. When drilling, clean the cuttings before the vibrating screen, observe the circulation of drilling fluid, and prevent the drilling fluid from leaking. If the drilling fluid returned from the wellhead is abnormal, report it in time.

6. Check the operation of the vibrating screen and the fixing of various parts. It is not allowed to shovel sand and cleaning water on the screen with a shovel.

7. When replacing the locksmith, operate in strict accordance with the locksmith's post operation procedures.

8. Other special procedures shall be implemented according to the procedures.