XXX project construction site is located at the northeast corner of the intersection of Weisan Road and Jingliu Road in Zhengzhou City. This project is a basement with 23 floors above ground, with a building height of 75.35 meters, and the structural form is shear wall structure. The construction unit is XX Co., Ltd.; Design unit ×× Design and Research Institute; The supervision unit is XX Company. The project investment is 3 million yuan, the commencement date is March 1, 26, and the planned completion date is June 1, 27. At present, the main structure of the project has been carried out in three floors.
since the project started, it has received great attention, help and care from Zhengzhou key construction project quality supervision station, Party A and supervision department, and our company. The management goal of safety standardization site is determined. Leaders from all sides visited the site for many times, deployed and guided the work, and gave great support and help to the project department in terms of manpower, material resources and financial resources. The project department is determined to improve the level of safety and civilized management, repay the support and help of leaders at all levels with practical actions, meticulously organize and strive for a safe and civilized construction site, ensure the quality and progress of the project, pay special attention to safety construction, improve economic benefits, establish the style of XX company, and strive to shape the project into a fine project in Henan construction industry.
with the efforts of all project department personnel and the care and support of leaders at all levels, there has been no casualty accident since the project started, and the expected goal of "zero accident" has been maintained. The site safety management has a high starting point, high standards and strict standardized management.
during the project construction, the project department strictly implements the construction requirements of safety management for each work, each working procedure, each construction team and team, and calls on the broad masses of employees to carry forward the spirit of ownership, boldly innovate, constantly explore, constantly summarize and improve. Now, the work of the project department in safety and civilized management is reported as follows:
1. We attach great importance to it ideologically:
1. The project department keeps in mind that "today's site is tomorrow's market", establishes and improves the management organization of "safety and civilized construction", and sets up a safety leading group headed by the project manager, a safety inspection team composed of the project department's deputy manager, full-time safety officer, equipment manager, materials engineer and construction foreman. Commend and reward those who have made outstanding contributions to the safety and civilized management; Give criticism and education to illegal operations, and impose economic penalties if the circumstances are serious. Fully mobilize the enthusiasm of employees.
2. Take the method of combining education with management, so that new workers can be educated before taking up their posts, especially special operators, and trained before taking up their posts. While carrying out safety education in the construction site, carry out education regularly and irregularly during the construction process, and earnestly implement the policy of "safety first, prevention first".
3. according to the "three specifications and one standard" and the characteristics of this project, the construction organization design is compiled, and various rules and regulations are improved, so that the safety work can be planned before construction, controlled during construction and summarized after construction, and the responsibilities are fulfilled.
2. Setting targets and strengthening safety management
The safety construction targets set by our project department for this project are: strictly implement the provisions of JGJ 59-99, the Safety Standard for Building Construction, and GB/T 281-21, the occupational health and safety management system of the company, so as to ensure that the following safety targets can be achieved in the whole construction process:
1. Put an end to fire accidents in this project;
2, this project put an end to heavy casualties;
3, this project put an end to equipment accidents;
4, put an end to the occurrence of occupational diseases in this project;
5. The frequency of minor injuries in this project is controlled below 1.5‰;
6. ensure the "provincial safe and civilized construction site" on the construction site and strive for "zhongzhou uneasy cup". Therefore, the project department has taken the following steps:
⑴. Strengthen the standardized management of safety, that is, the project department has formulated the Safety Work Plan, the Labor Protection Measures Plan, the Occupational Health and Safety Management Plan and the Construction Organization Design around this goal, improved the systems and measures, and established a systematic safety guarantee system. Clear post responsibility system, the project department signed a letter of responsibility with the managers, and has established various rules and regulations, carried out a major inspection of quality, safety and civilized construction, rewarded and punished according to the rules and regulations, and corrected the existing problems in time.
(2) Conduct safety education in time. According to the safety and civilization education system, the project department will conduct safety and civilization education for each batch of laborers who enter the site, establish a safety education file for each laborer, and establish a basic safety awareness, and record the daily safety and civilization activities in the safety production diary. Organize regular classes, organize managers to learn safety norms, safety knowledge and important speeches of national leaders on safety, and improve the level of safety management.
(3) Focus on key points, find key points, and carry out key prevention. The construction site is complex and changeable. The project department determines the key prevention contents of this project according to the specific conditions of the project. The project department has formulated strict measures and organized their implementation in time: first, carry out safety technical education and disclosure step by step, and implement safety prevention measures and personal protective equipment. Special operators must be certified after passing the training and examination, and can only be put into use after the installation or construction is completed, and safety signs are hung according to regulations.
(4), targeted control of construction key points and difficulties. Before the start of the construction, a special construction plan shall be prepared and submitted for approval, and then the disclosure shall be carried out. Including temporary electricity construction organization design, outrigger construction scheme, unloading platform erection scheme, safety construction organization design and other special schemes, and report to the supervision department and the company's engineering department for approval as required, and then organize disclosure implementation, inspection and rectification to continuously improve the safety management level.
Formulate various safety technical guarantee measures and organize disclosure and implementation:
A. Conduct three-level safety education for all the people who enter the site, and cultivate the safety awareness of construction operators from falling from high altitude, hitting objects, machine injuries and electric shock injuries.
B, at the same time, the technical disclosure of each sub-item construction must have the contents of safety precautions. Before going to work, the operation team should make safety production disclosure on a team-by-team basis and keep it on file.
C, establish the self-protection consciousness of "Three No Hurts" (I don't hurt myself, I don't hurt others, I am hurt by others) in the construction process. Full-time security officer shall conduct education and supervision at any time.
D, do a good job in the protection of four ports and five borders, and the safety protection facilities must meet the safety requirements. In the stairs, elevators, access points, reserved holes and adjacent areas, protection should be done.
E, rope net is used for horizontal protection during the project construction, and dense mesh safety net is used to close the facade of the project. The safety net used must be firmly bound with lead wire. By the security officer with the builder, technician * * * with inspection and acceptance, signature confirmation rear can put into use.
F, all equipment (except tower crane) should be built with fixed or movable protective shed. The primary and secondary power connectors should have protective devices, and the machinery should be used in strict accordance with the operating procedures. It is strictly forbidden to operate illegally, and the operators should hold posts after passing professional training.
G, all on-site distribution boxes should use standard metal distribution boxes or power distribution, with danger signs and special personnel for management. The circuit adopts three-phase five-wire system, and sensitive and effective leakage protectors should be set for each primary and secondary wiring. Professional electricians are responsible for daily inspection, maintenance and protection.
H, tower crane strictly implement the safety application and acceptance examination and approval system. The ultra-high amplitude limiter and torque limiter are sensitive and reliable, and the hook and hoist safety device are reliable. Insulating plates should be laid in the driver's cab, and the operators should hold relevant certificates. It is forbidden to work with fatigue, and it is forbidden to rotate over migrant workers' houses and dangerous areas in the overweight state.
I, set fire pool, fire bucket and other fire-fighting equipment on site, and assign special personnel to manage them.
J, ensure the effective operation of the safety management system and management system, and give heavy rewards to the safety construction, and impose heavy penalties on the illegal operation.
K, design the safety protection scheme. After the project starts, timely carry out safety protection for the construction working face, the construction passage and the places where people move. This project adopts a horizontal and vertical cross-cooperation protection system. The plane protection includes the safety passage, the safety protection shed, the cantilever flat net protection, the hole protection, the workbench protection and so on. The facade protection includes the vertical net protection and the border protection.
[5], increase investment, to prevent it before it happens. In order to ensure the safe and civilized construction of this project, based on the principle of "safety first, prevention first", the project department has invested a lot of financial and material resources to strengthen safety protection facilities and put an end to safety accidents. In terms of temporary electricity consumption, TN-S neutral protection system is adopted, and "three-level distribution and two-level protection" is implemented. More than 3 meters of various cables have been replaced successively, and five-core cables meeting the new standards are adopted. 2 standard distribution boxes and 65 leakage protectors were added, so that one machine has one brake and one box leaks. The distribution boxes were locked, painted and numbered, the equipment name and circuit diagram were marked, and the control system was clear: for fire protection, 36 dry powder fire extinguishers and 24 fire buckets were equipped, and 42 meters of various water pipes were added; To prevent falling from high altitude, 8, square meters of safety protection dense mesh net, 3 square meters of safety net, 1,5 square meters of protective shed, 1,6 square meters of standard protective railings on the edge, and standard box dense mesh steel mesh protective doors are used at the elevator entrance. The combination of plane protection and vertical net protection was established, and good results were achieved. Safety slogans and warning signs were hung, and the vertical main scaffold was cantilever scaffold, and a special scheme was compiled. In terms of protective equipment, more than 2 safety helmets, 8 safety belts, 24 pairs of non-slip shoes, more than 15 pairs of insulating gloves and 24 pairs of rubber boots were purchased.
protection of "three treasures, four mouths and five borders". Safety helmet, according to the regulations, different personnel wear different colors, pay attention to color harmony, and work at heights must fasten the safety belt according to the regulations. The "four ports" are all protected by railings and painted with yellow and black paint. The reserved holes are protected by cover plates, and the edge protection is made of steel pipes and steel bars, which is simple and cost-saving.
Third, pay attention to civilized construction and create a beautiful environment
Civilized construction is an important indicator of the management level of the project department and a concrete manifestation of the company image. In the specific implementation process, the project department strictly follows the company's on-site civilized construction standards to make the layout beautiful, the gates and slogans eye-catching and tidy, and the construction roads clean and hygienic. Therefore, a detailed civilized construction plan has been formulated.
1. In terms of site planning, the project department has made overall arrangement and unified planning for the site, built standardized fences and gates around the site, and implemented closed management on the site. The company logo and propaganda slogans were painted above the gates and gates according to the company's requirements, and large banners were hung at the eye-catching position at the gate.
2. In terms of temporary facilities, the working area is separated from the living area, the hardened concrete pavement is more than 3 meters long, the standardized migrant workers' dormitory is more than 2,4 square meters, the staff dormitory is more than 1,2 square meters, the renovation office is more than 1,5 square meters, the hardened sand and stone yard is more than 9 square meters, and temporary facilities such as standardized cement depots, staff canteens, toilets and bathrooms have been built. Migrant workers' dormitories are cleaned, the dining hall adopts gas appliance, measures are taken to prevent rats and flies, and swill buckets are set at the door, which are cleaned every day. Designate a special person to clean the toilet, and regularly kill flies and disinfect it.
3. In terms of personnel appearance, the project invested funds to customize work clothes for employees according to the requirements of the company, and implemented dressing the and wore badges. Establish a good corporate image and enhance the collective sense of honor and pride of all employees.
4. In terms of construction site management, the working faces are required to be clean after work, and the working faces are not allowed to refuse overnight. Every afternoon, before leaving work, the working faces are inspected, and penalties are imposed on those who do not meet the requirements. Ensure that the construction site is clean. On both sides of the main road in the site, the project department arranged potted seasonal flowers to make the site in an elegant and fresh environment. The main noise pollution sources, such as carpentry workshop, are fully enclosed and sewage sedimentation tanks are set up.
5. Material stacking is an important link in civilized construction. Due to the narrow space, the project department divides the stacking areas of various finished products, semi-finished products and turnover materials according to the general layout of the construction plane. All items are required to be stacked in square piles, horizontal and vertical, and signs are hung on the classified piles.
since the project started, it has been strongly supported and helped by the quality supervision department, Party A and the supervision department, as well as the company and its brother units. The project has been working hard along the goal of "high starting point, high level, high quality, high benefit and high efficiency". We mean that although some achievements have been made in safety management now, safety management should be consistent and must not be relaxed. We are determined to make persistent efforts and be strict in future work.
XX Engineering Co., Ltd.
XX Project Department
XX, 211
- Previous article:How to write expectations and goals for the new semester?
- Next article:Nanyang Wolonggang in Zhuge Lu
- Related articles
- Not all interest classes can learn. What interest class is useless?
- What does Chairman Mao mean by "1, years is too long to seize the day"? What are the allusions?
- There are currently about 85 million disabled people in our country. What is the difficulty in barrier-free travel in cities?
- Wonderful advertising slogans and comments
- Student safety slogans
- Slogan lace
- A complete collection of incentive slogans in production workshop
- Recommended model essay on residential property manager's work plan (5 articles)
As the saying goes, plan before action, plan before communication. In order to guide our next work, we need to ma
- 20 1 1 What are the new network words? By the way, thank you!
- Theme slogan of annual meeting of women entrepreneurs' chamber of commerce