Highway maintenance is constantly handed over to construction, how to ensure construction safety?
1, construction sign setting:
Clear construction signs, such as warning signs and warning lights, are set in front of and behind the construction area to remind drivers to pay attention to safety. At the same time, safety isolation facilities such as guardrails and isolation belts should be set up in the construction area according to regulations to prevent vehicles from entering the construction area and causing danger.
2, personnel safety:
All personnel involved in the construction must wear protective equipment such as safety helmet and work clothes to ensure personal safety. In addition, construction personnel should receive safety training and understand the safety regulations and operating procedures in the construction process.
3. Vehicle management:
In the construction area, all vehicles should follow the prescribed driving route, and it is forbidden to insert and turn around at will. At the same time, for large vehicles, special personnel should be arranged to direct traffic to ensure the safe passage of vehicles through the construction area.
4. Emergency plan:
Make an emergency plan. In case of traffic accident, equipment failure, etc. , should immediately start the emergency plan, quickly deal with the problem, to ensure that road traffic is not affected.
Methods to improve the continuous construction efficiency of highway maintenance;
1, make detailed construction plan and schedule plan.
Make a detailed construction plan and timetable before construction, and define the tasks and time nodes of each stage to ensure the construction progress as planned.
2, reasonable arrangement of construction resources and manpower
According to the construction plan, reasonably arrange construction resources and manpower, including equipment, materials and personnel. To ensure the smooth progress of all links.
3, improve the construction technology and technology level.
Adopt advanced construction technology and technology to improve construction efficiency and quality and reduce rework and maintenance times.
4. Strengthen on-site management and coordination.
Strengthen on-site management and coordination, ensure that all links are closely linked, and reduce intermediate links and time waste.
5, the implementation of information management
Adopt information management means to monitor and record the construction progress and quality in real time, find problems in time and take measures to solve them.
6. Optimize traffic organization
Arrange traffic organization reasonably, reduce traffic congestion and delay, and improve vehicle traffic efficiency.
7. Strengthen communication and cooperation with relevant departments and units.
Strengthen communication and cooperation with relevant departments and units, coordinate and deal with problems in time to ensure the smooth progress of construction.
8, training and motivating construction personnel
Train and encourage construction workers and managers to improve their skills and work enthusiasm, and promote the improvement of construction efficiency.
- Previous article:Basic operation of practical skills-atomization inhalation
- Next article:What horn does an electric car have? It's noisy and nice.
- Related articles
- Is it too late to switch to basketball?
- Positive slogans for joining the army
- Holiday safety slogans
- Forest ranger work summary
- The latest situation of the new coronavirus pneumonia epidemic in Leshan City from 0:00 to 24:00 on November 17
- How to go to Shanghai Disneyland Shanghai Disneyland Travel Guide 2018
- Occupational disease prevention and control slogans
- How many kilometers is it from Lianyungang to Huai 'an?
- How to complete several points that should be paid attention to in background design?
- Why does the slogan of "a cup of negative energy every day" in "Funeral Tea" shop attract many young people?