Summary of personal internship for construction workers
A busy and fulfilling internship life has come to an end. We must have learned a lot. Let’s record these hard-won results in the internship summary. What should the internship summary you have seen look like? The following is a summary of the personal internship of construction workers that I compiled for everyone. It is for reference only. You are welcome to read it.
As an on-site staff member of the engineering department’s outsourced project department, my work goals and tasks are: to provide quality services to Party A and the project department wholeheartedly, to supervise safe and civilized production, project quality, and project progress, and to prevent risks. , contact the company in a timely manner to minimize corporate risks.
At the beginning of the year, I was sent to work in the project department. This project is a strip park with a total length of about xx kilometers from xx in the west to xx in the east. Since the project is located on XX Road, close to XX Park to the west, and there are many tourists and pedestrians on the road, the focus of the project is safe and civilized production. After I went to the project department, I carried out work in the following aspects in accordance with the company's policies and requirements and the goals and tasks assigned by the engineering department, combined with the specific conditions of the project department:
1. Safe and civilized production
1. In terms of project image: When I went to the project department, I brought the work clothes customized by the company, and urged the project department managers to promptly customize and hang publicity slogans according to the company's requirements.
2. According to the requirements of the company's safety department, the project department was urged to produce warning slogans and publicity slogans.
3. Strengthen the safety of on-site tree planting: Because there are many pedestrians and tourists at the construction site, pedestrians often gather around when planting big trees. Therefore, construction workers must be assisted to maintain site safety every time and pedestrians are advised to stay away from the site. , It is strictly forbidden to stand under the crane's boom arm, and the pit to be planted should be fenced to prevent pedestrians from falling.
4. Strengthen on-site electricity safety management: convey the requirements of the company's safety department to the project department, and instruct construction personnel to hold certificates when working, and wires must use leather cables, and the use of flower wires is strictly prohibited.
5. Convey the company’s documents requiring on-site safety inspections and strict management during holidays, drought relief, and flood control, and instruct on-site managers to implement them as required.
2. Project quality
Since most of the on-site construction workers are planting seedlings for the first time, they often communicate and learn from each other during the construction, and try their best to complete the planting work with high quality and quantity.
1. Quality acceptance of seedlings: After the seedlings arrive at the site, we will provide reasonable suggestions to the construction workers on the diameter at breast height, crown width, branch points, soil ball size, etc. of the seedlings according to the owner's requirements for seedling specifications.
2. Seedling planting: When planting seedlings, provide rational suggestions on the cutting of seedlings, bundling and lifting of trees, filling of planting soil, and irrigation of root water.
3. Prevention and control of plant diseases and insect pests: When plant diseases and insect pests occur, provide suggestions to the construction workers after consulting professionals.
3. Project progress
1. Report weekly work content, next week’s plan, weekly project progress and overall project progress to the company’s engineering department in a timely manner every week.
2. Go to the site every day to understand the construction content of the day and the amount of work completed that day.
4. Communication services
1. Return to the company to assist the project department in signing and sealing the required information.
2. Participated in some regular supervisory meetings, and understood the requirements of Party A and the supervisor for the project, the problems that need to be solved during the construction raised by the project department, and the agreement reached between the two parties to solve the problems. *knowledge.
3. Convey and implement the management documents and requirements of the company’s engineering department to the project department.
4. Help the project department obtain industrial and commercial and tax certification documents from the company’s finance department: assist the administration department and the person in charge of the project department in appraising the labor contract.
5. Use your own camera to take photos of the scene and provide picture materials for the company’s promotional materials.
5. Enterprise risk prevention
1. In terms of labor wages: I often ask migrant workers on site to find out that their wages are paid in time, and there is basically no arrears. I learned from the construction team that they have recently been paid part of their wages, and there is a small amount in arrears, which I still need to follow up on.
2. Material payment: Since the material style project is a key payment, I made a detailed understanding of the main material suppliers and learned that none of them signed supply contracts with project stamps.
The following is the payment situation of the project department to several major material suppliers:
(1) Seedling supplier, the supply of seedlings is more than xx million yuan, and the debt is more than xx million yuan.
(2) The paving supplier supplied more than xx million yuan of bricks and owed more than xx million yuan.
(3) The commercial concrete supplier shall settle the debt without any debt.
(4) The cement supplier has a small amount of debt.
(5) After understanding the remaining material suppliers, record the contact information for timely tracking.
3. Since the project warranty is involved, I made statistics on the death of seedlings.
5. Existing deficiencies, improvements and improvements
I was assigned to work in the project department. During this nearly one year of work and study, I successfully completed the tasks of the company and the engineering center tasks assigned. But at work, I found that my professional skills are not good enough and my business level needs to be improved. To this end, I will work harder, study harder, strive to improve cultural quality and various work skills, and make due contributions to the company. contribute.
- Related articles
- Is the output of non-staple food in the food basket of urban and rural residents in China the first in the world at present?
- How to deal with the collapse of the old house wall
- Selling peaches and limericks on the roadside?
- A man in Chengdu pretended to be a doctor to fight against the epidemic and ate a meal. Should this behavior be condemned?
- Introduction of Golden Gate Tourist Attractions The Golden Gate scenery in summer.
- Father's surname is Gong and mother's surname is Ma. What is a better name for a boy born at night?
- What are the excellent slogans for targeted poverty alleviation in 2018?
- Team creative banner slogan
- Shenzhen Special Economic Zone Qianhai Shenzhen-Hong Kong Modern Service Industry Cooperation Zone Regulations (2020 Revision)
- Grave feng shui determines good and bad luck