Work Summary of Dispatching Institute in 2006

And the prospect of work in 2007.

In 2006, with the correct leadership and strong support of the bureau team and the cooperation of the brother units, we adhered to the goal of "one strong and three excellent" enterprise development strategy, "three new" rural power development strategy, based on ensuring the safe operation of the power grid, centered on economic dispatch, and through the joint efforts of all employees, we not only successfully completed various power grid operation indicators, but also achieved gratifying results.

Strengthen dispatching management to ensure safety and no accidents.

The first is to implement the safety responsibility system. Ensuring the safe and stable operation of power grid is the main responsibility of power grid dispatching. In terms of safety system, ideology and work norms, the safety responsibility system is implemented layer by layer, and the safety production management objectives are formulated, so that everyone in our hospital has made clear their full responsibilities. In order to prevent safety accidents, the dispatcher is very careful during the handover, detailing the operation mode and equipment defects of the handover system. Accident handling. Strictly implement the safety work rules, schedule the work according to the operation and maintenance workflow norms, check and approve the maintenance application ticket, carefully consider the safety measures and power transmission measures, strictly implement the "three votes and three systems", and resolutely put an end to the phenomenon of construction without working tickets. As of today, our county power grid has been running safely for 9366 days.

Second, actively cooperate with the annual spring inspection and pre-inspection and autumn cleaning. We prepared in advance, carefully organized and formulated a detailed plan, which avoided repeated power outages and ensured the safe and orderly maintenance of system equipment. The maintenance work was successfully completed, and the dispatcher carefully analyzed the accident prediction and dangerous points in each maintenance work, which improved the dispatching management level and laid a solid foundation for load growth. All the work went smoothly as planned, ensuring the safe operation of the power grid.

Third, the task of power grid operation is heavy. Due to the need of creating first-class and standardized construction, the renovation project of outdoor isolating circuit breakers of six 35KV substations, the secondary renovation project of Chengdong substation, the capacity expansion project of main transformer of wharf substation, the capacity expansion project of Dabai substation, Xiakou substation and Wanghai substation, the anticorrosion and RTV spraying treatment of six 35KV substations, 465,438+0 65,438+00 kV lines and 665,438+09 distribution substations have been completed. With more projects and more work tickets, frequent power outages and maintenance work greatly increase the workload of dispatchers. This year, * * * handled 352 work tickets, the highest in the past years. In the face of strong work pressure, we always aim at safe production to ensure the safety of the power grid. Reasonable arrangement of power grid operation mode, careful arrangement. Sometimes dispatchers work from early morning till late at night without a moment's rest. A dispatching command is a dangerous point, and there is no room for carelessness. They strictly issue dispatching orders, adhere to the system of double numbering and monitoring repetition, and ensure the safe and stable operation of the power grid.

Fourth, improve the rules and regulations and do a good job in the implementation of various plans. In 2006, all the staff in our hospital worked overtime, and some comrades gave up holidays for family reunion and stuck to their posts seven days a week. They have successively established and improved various rules and regulations and post responsibilities, and improved various archives records. They have worked out plans to avoid peaks and stagger peaks, emergency plans for college entrance examination and senior high school entrance examination, emergency measures for major festivals, and emergency plans for large-scale power outages. In 2006, the power grid accident prediction scheme was further improved, successfully passed the acceptance of provincial first-class power supply enterprises, made its own contribution, and was highly praised by superiors in safety assessment.

This summer, the power load suddenly increased, and the contradiction between power supply and demand was extremely prominent. We started the emergency plan in time, so that the county's power supply was orderly, the power grid operated safely and stably, and the power demand of residents and important users was met to the maximum extent. The work of meeting the peak and spending the summer achieved remarkable results, and this year's power supply task was successfully completed.

Through our efforts, there were no large-scale power outage accidents and "three mistakes" throughout the year, that is, the wrong batch of work tickets, the wrong dispatch orders and the wrong setting of protection settings. In the whole year, * * * handled 352 application tickets for planned work, 27 county dispatchers correctly executed city dispatching orders, and issued operation tickets 1278. Conscientiously implement the "three votes and three systems", and the pass rate of three votes reached 65438.

Second, reasonable and scientific scheduling, more supply and less loss to increase efficiency.

Economic benefit is the life of every enterprise. While ensuring safe production, we should pay attention to economic dispatch and create greater benefits for our bureau.

First, reduce losses and save energy. Our dispatcher reasonably arranges the operation mode around the indicators such as power supply, line loss rate, load rate and voltage qualification rate, so as to reduce the overload of power grid equipment and avoid instantaneous power loss. Select the operation mode of main transformer strictly according to its economic operation curve; Monitor the voltage and reactive power of the power grid at all times, switch the capacitor bank and adjust the tap of the main transformer in time according to the load change of the main transformer, so as to make the power grid run in an economic state to the maximum extent. The 35KV line loss rate will reach 1.94% this year.

Second, make a fuss about more supply. We arrange the operation mode scientifically and reasonably, and try our best to organize the power outage maintenance of the line and the planned maintenance of the substation simultaneously, such as installing the phase sequence board on the 10KV line and anticorrosion in the station, so as to avoid repeated power outages; Make full use of the power grid trough to arrange maintenance construction, such as arranging spring pre-test before the arrival of heavy load in April, and moving some equipment to work after heavy load to avoid power loss; Using reverse mode to improve power supply reliability. For example, in the pre-trial of Fuxing 1 10KV substation, in order to ensure uninterrupted power supply in the urban area, the urban area was reorganized into a 35KV substation in the east of the city, ensuring the power supply of important loads in the urban area. By the end of 65438+February 20th, the power supply of our county power grid was 235 million kWh, a new high.

Third, strengthen equipment maintenance to escort power grid dispatching.

In terms of dispatching automation and communication system management, we should check the main station once a day and fill in the equipment operation log, patrol the substation once every two months and fill in the patrol maintenance record, adjust the air temperature and humidity in the computer room in time, and create a good operating environment for the equipment. In September this year, the telemetry data of Dalong 595 line in the terminal substation died. Through careful analysis, the real reason was found out, and the channel board was replaced in time, which did not cause power grid failure.

"Remote viewing" is a modern means of dispatching management. On June 5438+ 10 this year, the video monitoring system of Baoding Changlin Company was installed, which provided a pair of clairvoyance for the dispatcher, enabling the dispatcher on duty to know the oil level, switch position and switch operation of the main transformer at a glance, improving the safe operation coefficient and enhancing the safety awareness of employees. So far, all six 35KV substations have achieved five-remote monitoring.

Fourth, carry out skills training and improve service awareness.

Excellent business skills are the premise of safe production, so we actively carry out our own business skills training while working safely. At the beginning of the year, we organized the study of new safety regulations and new rules and regulations, and also regularly studied relevant rules and regulations and technical regulations, so as to enhance the learning atmosphere of employees, constantly improve their professional and technical quality, and enhance the ability of emergency handling of accidents.

We also organized and studied the "three ten articles" and "twelve prohibitions" and made an evaluation. Really implement the "three public" dispatching, improve service awareness, take the initiative to accept external supervision, strictly implement the "five prohibitions" of dispatching, and further improve the corresponding management and assessment system. With good work style and excellent business skills, it has won the understanding and support of the vast number of dispatched objects.

Although we made some achievements in 2006, there is still a big gap from the requirements of our superiors. In 2007, the task will be bigger and more arduous. In 2007, we will further improve the safety of dispatching according to the overall deployment. The specific working ideas are as follows:

1, do a good job in safe power supply, load forecasting and power supply scheme, and strive to achieve power supply of 285 million kwh in 2007. Actively carry out the safe and economic operation of the power grid, and strive to achieve the annual line loss rate of 1.6%.

2. Anti-accident drills, technical questions and answers, and accident prediction are interspersed in daily safety activities, so as to improve the technical quality and psychological quality of the operators on duty, enhance the accident handling ability, and ensure the safe operation of the power grid.

3. Actively cooperate with the implementation of Fuxing 1 10KV substation expansion project and Xiakou 35KV substation reconstruction project. Put in new equipment in advance, carefully calculate relay protection setting value, formulate new equipment debugging measures, debug communication and automation systems, and ensure the smooth production of various projects as planned.

4. Further strengthen the rationality, planning and coordination of monthly and daily maintenance methods, reduce recalculation power outages, further strengthen cooperation with various units and departments, and actively coordinate the relations between all parties, so that the maintenance work can be carried out on schedule with good quality and quantity, and all maintenance work can be completed in an all-round way.

5. Replace the dispatching recording program-controlled telephone exchange with aging parts and unstable operation.

6. Upgrade the dispatching automation system program and further improve its functions.

7. The protection devices of Yangmiao Station and Wharf Station are modified by optical fiber communication, which has strong toughness. Data may be interrupted when the optical fiber is subjected to vibration and accidental contact. Practice has proved that the 485 communication port is relatively stable and reliable.

In the new year, we will make overall arrangements for dispatching work according to the national first-class standards, further strengthen safety management and dispatching management, and strive to do a good job in safe, reliable and high-quality economic operation of the power grid, making greater contributions to the national economic development and the safe operation and economic benefits of our bureau.