How to formulate targeted safety technical measures in construction organization design?

In the construction organization design, the methods to formulate targeted safety technical measures are as follows:

1. Carry out the policy of "safety first, prevention first", adhere to the principle that safety must be managed in production, and fundamentally put an end to the phenomenon of "three violations" and all kinds of accidents.

2. Set up a safety leading group, carry out safety inspection once a week, and deal with hidden dangers even if they are found.

3. According to the safety inspection standards for building construction issued by the Ministry, prepare the safety technical measures and safety technical disclosure for step-by-step and sub-item projects, and do a good job in the main protection facilities such as "four ports" and "five borders".

4. When entering the construction site, you must dress in accordance with the regulations, wear a safety helmet, use personal protective equipment correctly, and fasten your seat belt when working at heights.

5. The external protection of the main body adopts a single row of landing scaffolding, and two floors in the scaffolding are covered with springboard. A horizontal safety net is set every 1m above, and the scaffolding is externally protected by a dense mesh safety net.

6. One 8T/M tower crane and two 7M-high gantry cranes are used for vertical transportation. The tower crane shall be commanded by the holder of the operation certificate of special operators, and the gantry shall designate a special person to command the lifting with walkie-talkie.

7, tower crane, gantry and scaffolding, should be in accordance with the provisions, the declaration formalities, the relevant departments to organize on-site monitoring, the erection of qualified before use.

8. Set 1 ~ 2 construction passages as appropriate, and set up protective shed with steel pipe scaffold and steel springboard. Elevator shafts, unloading platforms, pipeline shafts and stairs are welded with steel bars to form guardrails or doors, and 1.1M high guardrails are set at the edge.

9. The gantry and tower crane shall not be overloaded. If the tower crane is used to hoist loose objects such as steel bars and wood squares, it must be firmly bound and lifted more.

1. Temporary power consumption must conform to the requirements of specifications, and three-way five-wire overhead laying shall be adopted. All electrical equipment shall be protected by one machine, one box, one brake and one switch, and safe voltage below 36v shall be used for operation in wet places.

11. For the 1kv high-voltage external power line near the building, set up a 16M-high scaffold with wooden feet and lay a board with a thickness of 3cm, so as to prevent falling objects from falling on the high-voltage line and causing electrical accidents.

12, electrical equipment, repeated grounding and leakage protector should be regularly tested, found that the problem handled in time, it is forbidden to run in spite of illness.

13, tower crane red, gantry and electrical equipment metal shell, lightning protection or zero, grounding measures should be taken in accordance with the provisions.

14. In case of suspension or resumption of work due to seasonal climate or other factors, reliable safety measures must be taken for tower crane, gantry, scaffolding, construction electricity, and "four ports" and "five borders".

15. In case of severe weather such as gale or rain and snow, construction should be suspended, and anti-skid measures should be drawn up for construction after snow.