Joke Collection Website - News headlines - Shenzhen 14 subway station

Shenzhen 14 subway station

Shenzhen Metro 1 Line 41No.* *18 subway stations, namely Gangxia North, Huangmugang, Luohu North, Buji, Shiyaling, June North, Silian, Aobei, Universiade, Zhangbei, Nanyue, Baolong, Jinlong and Pingshan Wai.

Shenzhen Metro 14 Line, also known as "Shenzhen Metro East Express Line", is theNo. 13 subway line completed and put into operation in Shenzhen, Guangdong Province, China. It was put into operation on June 28, 2022, and its logo color is yellow. The first phase of Shenzhen Metro 14 Line starts from Gangxia North Station, passes through Futian District, Luohu District, Longgang District and Pingshan District, and connects Futian Central District, Buji, Henggang, Universiade New City, Pingshan Center and Kengzi in series, and ends at Shatian Station.

The first phase of Shenzhen Metro 14 Line has a total length of 50.34 kilometers, with 8 stations 18, all of which are underground stations. Eight A-type trains are adopted, and automatic driverless technology is adopted. The maximum running speed is120km/h. The whole line passes through Futian District, Luohu District, Longgang District and Pingshan District.

The development of history

The entrance and exit sections of Angre Depot of Line 202 1 1 4 and Shenzhen Metro 1 4 are connected by two lines; 65438+1On October 26th, the main structure of the operation depot of Shenzhen Metro 14 Line was capped; In July, Shenzhen Metro 14 line 14 open-cut stations were all capped; On September 3rd, Shenzhen Metro 14 line tunnel was completed. 141On October 29th, the first train pick-up ceremony was held on Shenzhen Metro14 Line. 165438+1October15th, Shenzhen metro14th line completed the first section of 35kV electrification; Shenzhen Metro 14 line runs through the whole line.

On June 65438+1October 14, 2022, the Shenzhen Metro 14 line completed the electrification of the 35 kV ring network; 65438+1October 2 1 day, Shenzhen Metro 14 line completed the first thermal sliding test; 14 On April 6, the Shenzhen Metro14 line completed the hot sliding of the whole line; On April 22nd, the station name planning of Shenzhen Rail Phase IV was approved and released, and the station name of Shenzhen Metro 14 line was confirmed. On September 23rd, Shenzhen Metro 14 Line completed the no-load trial operation; On September 25th, Shenzhen Metro 14 Line passed the acceptance; 65438+1On October 28th, Shenzhen Metro 14 Line was put into trial operation.