Joke Collection Website - News headlines - In the construction project: "Three guarantees, four mouths, five cards, ten sides, seven cards, two drawings and ten prohibitions." What is this?
In the construction project: "Three guarantees, four mouths, five cards, ten sides, seven cards, two drawings and ten prohibitions." What is this?
Ten measures for safe production
1. Use "Three Treasures" as required.
2, mechanical equipment protection device should be complete and effective.
3, machinery is not allowed to run in spite of illness, no overload operation or maintenance in operation.
4, the erection of wires must conform to the requirements, all electrical equipment to zero grounding.
5. Electric machinery and hand-held electric tools have leakage and tripping devices.
6, scaffolding materials and put, must conform to the requirements of the specification.
7, all kinds of cables and their devices must conform to the requirements of the regulations.
8. It is forbidden to wear high heels, slippers, hard-soled shoes and shoes with nails that are easy to slip when working high above the ground.
9. The "four ports" on the construction site must be protected by cover plates, and red lights should be set at night to warn them.
10, the roads on the construction site are clear and the materials and components are neatly stacked.
Fourth, the fire control system card: fire control key points and daily safety production fire control work. Fill in according to Article 10 and Article 18 of the fire control management method in the "Six in One" management system document.
For example:
1, when compiling the construction organization design, there should be fire safety requirements.
2, the construction site barrack construction, between areas to comply with fire regulations.
3, all overhead wires, fixed with porcelain insulator, the wall line must pass through the tube.
4, the construction site fire operation, must be approved by the relevant departments before hot.
5. Fire prevention signs should be posted in warehouses, wooden sheds and places where inflammable and explosive articles are piled up on the construction site.
6, the construction site must be equipped with a sufficient number of fire prevention and fire fighting facilities and equipment.
7. Establish a fire safety responsibility system and define the fire safety responsibility area.
8, the construction site should have someone on duty, found that theft report in time.
9, the construction personnel are not allowed to enter the site, must wear a helmet when entering.
10, take things out and release them after inspection.
Verb (abbreviation of verb) environmental protection system board: according to the special requirements of environmental protection where the project is located, formulate practical systems that meet the requirements of national laws and local environmental protection regulations.
For example:
1, no spitting, littering, scraps of paper, cigarette butts.
Don't run the red light and walk freely.
3, no parking, the road is crowded.
4, no stalls, affecting traffic and health.
5, don't build indiscriminately, it will damage the city.
6. Don't litter or waste.
7. Don't scribble and paste, and don't set advertising slogans.
8, do not damage the green space, do not occupy the green space.
Four understandings:
1. Know the danger of post fire;
2. Know how to prevent fire;
3. Know how to put out the fire;
4. Know how to escape and evacuate.
Sihui:
1. Can use fire fighting equipment;
2. Will report the fire alarm;
3. Will put out the initial fire;
4. Will organize evacuation and escape.
Four abilities:
1. Improve the ability of social units to check and eliminate fire hazards;
2. Improve the ability of social units to put out initial fires;
3. Improve the ability of social units to organize personnel to evacuate and escape;
4. Improve the ability of social units in fire prevention publicity, education and training.
Five firsts:
1. Find the fire at the first time;
2. Call the police at the first time;
3. Put out the initial fire at the first time;
4. Start the fire fighting equipment at the first time;
5. Organize personnel evacuation at the first time;
"Three treasures" refer to safety helmets, safety belts and safety nets;
"Four ports" refers to stairs, elevator wellheads, reserved holes and access ports.
"Five temporary" refers to the balcony periphery without railings, the horizontal periphery without external frame protection, the periphery of the frame project floor, the upper and lower runways and both sides of the ramp, and the side of the unloading platform.
The names of different places are different, and the general meaning is the same!
- Previous article:How to manage and maintain kitchen equipment and tools
- Next article:How can I use Alipay without a bank card?
- Related articles
- Workshop energy saving, consumption reduction and efficiency improvement speech
- What should I do if the bid evaluation expert does not respond?
- How to design fruit trademark pictures
- Summary of community workers' personal work for half a year
- Environmentally friendly ceramsite manufacturer
- What is the sales hotline for properties on the left bank of Luhu Lake in Xinda, Chengdu?
- What can I write about the contents of the table manners handwritten newspaper?
- Which is a good public security booth?
- My campus composition
- Inspirational slogans in school corridors