Joke Collection Website - News headlines - What are the standard requirements for floor tile paving construction?

What are the standard requirements for floor tile paving construction?

As we all know, people basically choose to install the floor or lay tiles on the ground when decorating, which is not only beautiful and fashionable, but also easy to clean. Floor tile paving requires a certain construction technology, otherwise it will affect the overall effect. So what are the standard requirements for floor tile paving construction? Next, Bian Xiao will introduce the relevant contents to you. Let's have a look.

What are the standard requirements for floor tile paving construction?

1, clean the floor first, and then according to the size of the floor tile and floor, pay attention to the same space, horizontal brick and vertical brick can't be more than one row, set the horizontal line according to the typesetting, and block it. The ground should be kept wet enough so that there will be no hollowing. Apply 1: 3 mortar to the back of the floor tile, with the thickness not less than 1 cm. When paving, the angles should be aligned and the interfaces should be aligned.

2. Before construction, the floor tile should be soaked in water for a period of time, so that the holes in the floor tile can absorb enough water, and there will be no problem of hollowing or falling off after construction. If the floor tile is pasted without soaking, it may absorb the moisture in the cement, and cracks will appear when it reaches a certain limit, which will affect the appearance and use.

3. The choice of auxiliary materials is also very important. Only good quality sand and cement can make the joint between the floor tile and the ground closer. When choosing cement, we should first observe whether it has passed QS certification and see if it has expired. River sand is the best choice for sand, because it has enough moisture to increase the bonding effect.

Some people always cut it flat enough, which has a lot to do with the place besides shaking hands. It is best to put it in the corner and finally seal it with sealant, so as not to affect the decoration effect.

5. The position of the first paving determines the position of the whole construction, so the position of the first paving should be carefully selected. If the position is wrong, all the floor tiles will be skewed. In addition, it is necessary to clarify the order of floor tile laying, which can be from living room to room or from room to living room.

Summary of the article: The above is the relevant content required by the construction standard of floor tile paving introduced by Bian Xiao, hoping to help some friends in need.