Joke Collection Website - News headlines - Summary report on surveying and mapping personal work
Summary report on surveying and mapping personal work
Surveying and mapping work report 1
Time flies, time flies, and in a blink of an eye, 20 _ _ _ is coming to an end. Looking back at 20____ _, my mind is full of thoughts. I still remember the first time I went to the construction site in Inner Mongolia. Although the traffic is inconvenient, the living conditions are difficult and the communication signal is poor, it is meaningful and valuable.
On July 2nd, I set out from Yichang to Xichang site to do geological sketch of _ _ _ railway tunnel and some preparatory work for the Three Gorges Project (including laying holes, checking the distance between deep holes, and communicating and coordinating with technicians and workers). Over the past six months, with the patient help and encouragement of leaders and colleagues, through their own continuous efforts, personal quality has been significantly improved, and some achievements have been made in work, but there are still many shortcomings. The situation in the past two years is briefly as follows:
First, there are shortcomings.
Through on-site work experience, I deeply realize my own shortcomings, lack of professional knowledge, lack of social experience, poor working ability and many other problems. At work, I will also encounter many technical terms and construction procedures about tunnel engineering, which I don't understand. Because my major in school involves little geotechnical engineering, it is difficult to express it in geological terms when it is necessary to record some geological conditions in tunnel face excavation in time, so I feel that I have little knowledge and lack confidence. These shortcomings have become the source of motivation for me to study hard, strengthen my professional knowledge and accumulate work experience, and strive to devote myself to next year's work with strong working ability, rich social experience and more full enthusiasm!
Second, the ideological and moral aspects.
In my daily work, I strictly abide by the rules and regulations of the company, improve my ideological understanding, carry forward the spirit of hard work in combination with the actual needs of my work, and correctly understand and implement the company's principles and policies. Can also actively communicate with colleagues, foster strengths and avoid weaknesses, maintain good relations, supervise each other and make progress together! Through the words and deeds of the predecessors, I deeply understand the importance and necessity of thrift!
Third, life.
I have just arrived at the construction site, and I am a stranger. Despite the enthusiastic care of my colleagues, I still don't have much confidence. I am a stranger to me. In the face of a new and unfamiliar environment, I am walking on thin ice. What I can do is to think more, listen more, see more, ask more questions, try to adjust my mentality, always be ready to face the challenges of new people and new things, dare to accept, dare to face and not shrink back! I tried to adapt myself to this brand-new living environment in the shortest time, and I did it. I am also familiar with the workflow, shoulder my due responsibilities, and constantly supplement, encourage and improve myself. When I first arrived at the construction site, I had only theory but no practical experience. What I can do is to consult modestly and be serious and responsible. After studying for half a year, I fully understand the whole process of tunnel excavation.
After half a year's life on the construction site, I learned how to adapt to the new environment and how to communicate with people better. Through this period of exercise, I believe that no matter what I do in the future, I can persevere and be consistent! Now that the construction site is shut down, I have time to reflect and summarize myself. I learned to be independent and cautious, to help each other, and to understand a lot of truth. Harvest is far better than pay. The sufferings and grievances you suffered there are nothing, they are all worth it. I am very grateful to the company for giving me this platform for exercise.
IV. Work Plan for the Next Year
1, obey the leadership arrangement, unite colleagues, be optimistic and do a good job;
2, in the new year to maintain a rigorous and serious work attitude, diligent, strengthen professional theoretical knowledge and practical business learning;
3, according to their own weaknesses, receive professional training and master more professional skills related to work;
4. Make bold innovations while summing up experience and dare to challenge new jobs!
Surveying and mapping work report II
Busy 20____ years passed quickly, and time once again pushed me to a new starting point. Standing here, I am deeply touched. The past year has been a bumpy and uncertain year for me, and it has also benefited a lot.
This year, my job changed from a field recorder to an inner page data administrator. My work mainly includes the compilation and submission of survey report, the processing of control network and leveling data, and the management of original records and reports. With the increase of field workload, the work of measuring indoor industry is also heavy. In 20 years, more than 0/000 external documents and 300 internal documents were submitted. In order to complete the measurement report faster and better, we have written the measurement calculation program while doing the data. In addition, in order to make better use of the existing survey results, we have made statistics on the existing elevation control points, plane control points and temporary turning points.
Over the past year, the industry management has been gradually improved and orderly. However, sometimes, due to the short time of measurement report, the negligence of industry personnel, the confusion of field records, insufficient communication with the pay-off class, incorrect entrustment by the technical department, and insufficient detail of the drawing number, it is inevitable that there will be clerical errors, improper remarks and inconsistent field labeling, but with the increase of experience, this problem will gradually decrease. I will continue to pay attention to this problem in my future work, and communicate with technicians and field testers if I have any questions. Inform the technicians to ensure that the name of the entrustment sheet is accurate, the drawing number is detailed, and the data and labeling are correct and appropriate when preparing the entrustment sheet for measurement; Supervise the on-site recording personnel to ensure that the records are clear, perfect and orderly. Strive to minimize the problems in the measurement report within 20 years. In addition, in the process of data submission, because each measurement report can only be sent with the signatures of five people, quality inspectors and observers often go in and out of the on-site office to punch in, especially on weekends, the signatures are blocked, which makes the submission of measurement reports lag behind. In this regard, I have informed the quality inspector in advance of each measurement report before going to work, and this problem has been greatly improved.
My job is very simple, and the boring work repeated every day has made me impatient and hesitant. However, after working for one year, I found that it is these simple and boring jobs that make me feel that it is very easy to complete a simple job, but it is not easy to do a simple job well, and it is even harder to persevere. Speaking of this, it reminds me of a sentence by Dr. Lu Jun of Renmin University, "There is no ordinary job, only a mediocre attitude". Perhaps the most important thing for us who just entered the business is not our ability, but to develop a habit and an attitude, that is, to strive for perfection in everything, to pay 65,438+000% efforts and never to pay 90% efforts. A person's potential is unlimited, but few people can stimulate this potential at work. Unfortunately, I don't have such an attitude yet. I need to put away my personality, settle down and study hard, and do every little thing in a down-to-earth manner. In order to have greater gains and more affirmation in the new year, standing at the starting point of 20____, I put forward the following requirements for myself:
(1) Based on the principle of serving the Yangtze River nuclear power project, he devoted himself to his work.
(2) Study harder, consult with survey predecessors with an open mind, learn from survey colleagues, and constantly improve business level.
(3) Develop good work habits and take every little thing seriously.
(4) Strengthen cooperation with others to ensure the quality and speed of work. The above is my personal summary, please criticize and supervise the leadership!
Surveying and mapping work report 3
Time flies, in a blink of an eye, 20 years have passed. Measurement is the eye of engineering. As a surveyor, I am engaged in surveying based on the principle of seeking truth from facts and speaking with data. I meditated on my work and life this year, and I felt a lot and gained a lot. I will summarize my work and study in the past year as follows:
As the saying goes, "Without rules, there would be no Fiona Fang". Measurement is the foundation of building engineering, and it is the yardstick of various types of work in engineering. Without it, our work will have no goal, that is, we will work blindly, and we will become blind people riding blind horses, and there will be mistakes that should not occur. At first, I thought measuring and setting out was a very simple job. Later, I slowly found out at work that it was not. In fact, it also has a lot to learn. In this year's work, I have always been strict with myself, constantly strengthening my working ability, communicating with the technical personnel of the project department, learning from each other's strengths and avoiding weaknesses, strictly controlling the measurement work, and working hard with my colleagues to complete each measurement task.
Before the construction survey, carefully review the drawings, and ask the leaders and predecessors for advice, consultation and study on the mistakes or doubts on the drawings in time. Learn from colleagues and cooperate with each other in measuring and setting out. From unfamiliar to familiar, constantly sum up experience and strive to improve work efficiency. After measuring the pay-off, carefully position the composite line to ensure the accuracy. In measuring and setting out, all kinds of instruments can be used accurately and quickly. In the process of measuring and setting out, I sometimes face the problem of changing and mending the line. This is also the process of finding and solving problems, which makes me understand and master the doubts more thoroughly and cultivate a rigorous work attitude. The society is progressing and the times are developing. Only by continuous learning can we keep pace with the times. With the help of books and colleagues, I learned more construction techniques and methods, and understood various specifications.
In today's high-speed development society, not self-improvement means backwardness and cannot meet the development requirements of current construction work. Therefore, in the future work, we should be strict with ourselves and do our own job well on the premise of minimizing and eliminating mistakes, so as to provide the most favorable guarantee for the smooth construction of this project. In normal work, actively urge the labor service team to cooperate with our pay-off work, so as to solve and correct problems in time when they are found, and eliminate mistakes in the bud without becoming a stumbling block to the progress of the project.
In this year's work, from curiosity to familiarity, I got in-depth exercise, further improved my professional knowledge, and became mature and steady. Although I have made some progress this year, it doesn't mean that I am a qualified surveyor, which is far from my expectation. I still have a lot to learn and improve. In the future work, we should accumulate experience and draw lessons according to the problems on the spot, strengthen the enrichment of new knowledge and new theory, strengthen personal operation technology and management awareness, and cooperate with other departments to do their own jobs.
In next year's work, we will use our spare time to exchange experiences with other project surveyors, share experiences and improve each other. I won't make mistakes when others have problems, and my own mistakes won't happen again. Do it slowly until it breaks into a butterfly.
In the future work, I will study harder, improve myself and constantly improve my professional and technical level. In the process of construction, I will complete the construction task with high standards and high requirements to ensure the smooth progress of the project. Study hard from colleagues and better complete the tasks assigned by the leaders. Broaden our thinking, deepen and refine our work, strive to create greater benefits for the company, and live up to the expectations of leaders and colleagues.
4 reports on surveying and mapping work
In recent years, all the staff of Surveying and Mapping Institute have conscientiously implemented the requirements of the Provincial Water Resources Department for water conservancy work in our city, and firmly established and implemented Scientific Outlook on Development's correct views on power, status, interests and achievements. Adhering to the people-oriented principle and following the five overall plans, the Institute of Surveying and Mapping has promoted the coordinated development of water conservancy engineering surveying and mapping, public welfare surveying and mapping and geographic information industry, created a good atmosphere for all staff to participate in the construction of surveying and mapping culture, and emphasized the importance of unit environment, image and spirit in development.
First, the main surveying and mapping work completed in the past two years
1, this system also has mandatory surveying and mapping tasks.
With the joint efforts of the staff of the whole hospital, our institute has completed a lot of surveying and mapping work with good quality and quantity: topographic mapping of the east and west grit chambers, dredging of the east basin canal in Weishan irrigation area, topographic survey and engineering construction of the lining of the first and second main canals, and topographic and cross-sectional survey of the diversion ditch in the third east basin; The longitudinal and cross sections of the east main canal, the west main canal, the first and second main canals and buildings were investigated and measured in Weishan irrigation area. _ _ _ _ _ _ _ _ Dredging construction and completion survey of No.5 and No.6 ponds of water diversion project, topographic survey of joint planning and design of east and west grit chambers, topographic survey, construction lofting and completion survey of the third main canal lining of _ _ _ _ _ _ _ _ water diversion project, third-class leveling survey of the construction of Wangpu sluice in the third main canal to GaoZhuang Qiao drainage sluice, dredging lofting and leveling survey of the third main canal, and completion survey of dredging in the west main canal.
Second, obscurity and selfless dedication
The hardship of field work makes surveying and mapping workers particularly able to fight, endure hardships, endure, contribute and unite. Surveying and mapping work requires staff to have a strong ability of unity and cooperation, and any negligence in any link may lead to mistakes. Bo _ _ _ _ topographic survey has a large workload, short time and heavy task. It's freezing in December, and the boundary markers are buried in the wild. The frozen soil is too deep for the shovel to use. Comrades take turns digging and burying with pickaxes. Everyone is sweating in the winter when dripping water turns into ice and snowflakes fly. The director of Bo _ _ _ _ Construction Bureau, accompanied by the vice president of Surveying and Mapping Institute, went to the gps observation site to inspect and guide the work. They listened carefully to the introduction of surveying and mapping engineers and technicians, and asked some technical problems of gps observation in detail. They spoke highly of our vigorous work style, strict organization and management, and excellent surveying and mapping technology. At the beginning, our hospital won the unanimous praise of the owners, and all the staff were full of confidence. In my residence, there is no heating equipment, so I cover my clothes when I rest. The bureau leader _ _ _ _ led the relevant section chief to the site to express condolences on behalf of the Municipal Water Conservancy Bureau, and sent condolences, televisions, electric heaters and daily necessities. This is really timely help for the field staff. In summer, sometimes the hot sun is like a fire; Sometimes the wind blows hard and the rain pours down. Despite the harsh environment, there were no injuries and equipment damage due to effective measures. Despite high blood pressure and physical discomfort, several veteran comrades worked conscientiously and actively, which reflected the glorious tradition of hard work and selfless dedication of old surveyors and flashed a brand-new look of contemporary surveyors attaching importance to science and bravely climbing the peak. With advanced surveying and mapping science and technology, high cultural level, exuberant energy, enterprising spirit, scientific attitude of seeking truth from facts, preciseness and refinement, young people use modern scientific and technological means to complete all kinds of field observation and indoor surveying and mapping work. Through this project, young people have been trained to a great extent, and their professional ability and work coordination ability have been greatly improved, especially in the application ability of practical surveying and mapping technology, which has laid a solid foundation for future surveying and mapping work and business competition in the foreign surveying and mapping market.
Third, acquire equipment, improve conditions, improve technology, reduce costs and increase benefits.
The office conditions of Surveying and Mapping Institute have been greatly improved. All the offices have updated tables and chairs, equipped with sofas and air conditioners, and everyone has a computer with a higher configuration. New surveying and mapping equipment, such as global positioning system RTK equipment, high-precision electronic total station and level, were purchased to ensure field production. Some drawing softwares have been added to the computer drawing room, such as cass series in South China, sv300 and Ryder series in macro map, abdrs, mapgis, profile cad and so on. It has realized advanced field measuring instruments, high speed of indoor drawing computer, high precision of surveying and mapping results, low labor intensity, relaxed field personnel, fast production speed and improved economic benefits.
Fourth, explore external markets and achieve economic leapfrogging.
After completing the indoor survey task, we actively explored the development road of surveying and mapping market, and contracted many large projects such as cadastral survey, Huaiyuan River topographic survey, Binzhou topographic survey and Boxing topographic map survey. In recent years, the market business has reached _ _ _ _ ten thousand yuan, and it has exceeded _ _ _ yuan in the past 20 years, which truly reflects the new situation of the Institute of Surveying and Mapping in exploring external markets and realizing economic leap. Participated in the land use status update survey in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ In the process of bidding for many times, I have accumulated rich experience, trained talents and learned about the external surveying and mapping market, which laid a good foundation for the Institute of Surveying and Mapping to go to the external surveying and mapping market in the future.
Five, the external image, internal management, clear objectives, to ensure product quality.
With the joint efforts of the staff of the whole hospital, many surveying and mapping projects have been well received by the superior leaders and Party A. In the quality inspection of surveying and mapping products in the whole province in 20 years, the supporting and water-saving reconstruction project of Weishan irrigation area was well received by the expert group, and the quality of the results reached an excellent level. During the revision of iso 2000, many surveying and mapping projects and related work were affirmed and praised by china association for quality. In 20____ _, the Institute of Surveying and Mapping was rated as an advanced unit in the province's surveying and mapping industry by the Surveying and Mapping Industry Association, and its president was also awarded the title of advanced individual in the province's surveying and mapping industry.
In recent years, the Institute of Surveying and Mapping has always adhered to the people-oriented principle and prospered the Institute through science and technology. Pioneering and innovative, dedicated purpose, adhere to the quality first, reputation first business policy, achieve a project, make friends; Do a project, expand a market, and win the unanimous praise of relevant units with first-class management, first-class quality and first-class reputation. All surveying and mapping work is carried out in strict accordance with the requirements of surveying and mapping specifications, drawings and iso900 1 quality standards, and the requirements of quality manual and quality system program documents of Surveying and Mapping Institute are resolutely implemented. According to the characteristics of the project, the quality manual of the project is specially formulated, and the management measures of the quality system are detailed and implemented to people, so as to ensure the whole process of project measurement and everything related to quality. Actively implement total quality management, enhance the quality awareness of all staff, establish and improve the quality assurance system, and gradually realize the standardization, standardization and proceduralization of quality management.
Six, strengthen safety education to ensure safety in production.
In the early stage of surveying and mapping project or remote surveying and mapping production, the Institute of Surveying and Mapping strengthens the education of safe and civilized production for employees, and the responsibility for safety lies with people. Working in the field, the conditions are complex, the environment is diverse and the weather is changeable. In hilly areas and along the Yellow River, ravines are criss-crossed, weeds are spreading in some places, underground wells are densely covered, and transmission lines are interwoven into a network; Local customs are different, and language exchange in some areas is a great obstacle; The staff overcame all kinds of difficulties, took the initiative to contact the localities, coordinated the relations between all parties, and carried out surveying and mapping production in an orderly manner. All production is carried out in accordance with the safety production operation procedures. In the survey of water conservancy projects and other local engineering surveying and mapping, the staff of the whole hospital firmly established safety awareness, nip in the bud, no personal and equipment safety accidents occurred, and achieved a comprehensive victory in safety production.
Five reports on surveying and mapping work
Since the beginning of this year, I have conscientiously implemented the spirit of instructions from my superiors, worked hard to learn business knowledge, and gradually rose from the lower business ranking last year to the middle level. At work, I always urge myself to obey the leadership and distribution, maintain a high degree of consistency with the unit leaders in thought and action, and persist in studying the party's principles and policies. In my life, I always maintain a modest and friendly attitude, maintain good interpersonal relationships and actively help my colleagues. There is no violation of discipline throughout the year. During the whole year's work, I surveyed _ _ sheets of drawings and participated in _ _ outdoor surveying and mapping, and the surveying and mapping once rose from the initial _ _ _% to _ _ _%.
As a basic surveying and mapping worker, I am well aware of my responsibility and mission. Even the deviation of 1 mm may lead to great disaster. In the middle of the year, I followed the leader to complete the surveying and mapping work of _ _ _ _ New District. The working environment in _ _ _ New District is very elegant, but I didn't linger on the beautiful scenery of mountains and rivers. Instead, I devoted my energy to the visit of _ _ _ New District, trying to absorb the advanced working mechanism and methods here, so that I can work better after returning home. Subsequently, I participated in the acceptance of the topographic map of _ _ _ _ _ Industrial Zone 1: 500. The acceptance of topographic maps is strict. Under great work pressure, with the care of leaders and the help of colleagues, I basically completed my work tasks. The completed acceptance chart is more accurate and precise than before, and my business level has been further improved. In the housing safety survey at the end of the year, I always worked in the front line, with the belief of learning at work, actively cooperated with my colleagues, and completed the safety inspection of dozens of buildings with my own theoretical basis and practical experience. Although it is very hard, my working ability and level have been raised to a new level.
In the usual work and study, in the face of increasingly strict requirements and changing working methods, ask if you don't understand, and humbly ask experienced old comrades for advice. Although there is still a certain gap from a high-level surveyor, I try to make this gap smaller and smaller. At the same time, in order to understand the information knowledge of surveying and mapping industry more quickly and further strengthen my theoretical level, I also signed up for this year's on-the-job postgraduate entrance examination of surveying and mapping major in Wuhan University. Although I missed the class by only a few minutes, I still mastered a lot of things that I have never touched before, so I will not give up, but will continue to take part in the study and exams, and strive to integrate what I have learned into my work as soon as possible.
It was a hard and busy year, but it brought a bumper harvest. Although my ability is limited and my professional level is still at a relatively low level, I will continue to work hard, play a good role in the stage of surveying and mapping with the spirit of unremitting research and the belief of facing difficulties, and try my best to continue to contribute to the cause of surveying and mapping.
Articles related to the summary report of surveying and mapping personal work:
★ Summary model essay on surveying and mapping personal work in 2020
★ Selected Samples of Surveying and Mapping Personal Work Summary in 2020
★ Summary of Surveying and Mapping Personal Work
★ Surveyor's annual personal work summary report
★ Five Annual Summaries of Surveying and Mapping in 2020
★ Survey personal work summary model essay 2020 latest.
★ Model essay on personal work summary of surveyor
★ Personal Summary Report of Surveying and Mapping Professional Work Technology
★ Personal Summary Report of Surveying and Mapping Technology
★ 3 essays on personal summary of surveying and mapping work
- Previous article:Write a promotional slogan for tunnel warfare
- Next article:Brief Introduction of China's Hometown of Silk Screen
- Related articles
- Composition: If you are Li Hua, I learned from the Internet that an international middle school student organization is going to hold a summer camp in Singapore. Students from all countries are welcom
- China's ancient classic inspirational quotes
- Which is better, Intel E5420 or Intel E8400?
- Shenyang cemetery, some friends can recommend it. No, I have no experience. Do you want something reliable?
- What crops are interplanted in the corn field?
- Lecture design of "Laoshan Jie"
- Write a few slogans about loving flowers, plants and animals.
- What clubs are worth joining in Changchun University of Technology?
- A female white-collar worker in Hangzhou has not eaten rice for dinner for 15 years. Why is the result so hard to believe?
- What are the specialties of food in Huan County? What are the specialties of Huanxian County?