Summary of power supply safety production month activities

Summary of Power Supply Safety Production Month (5 selected articles)

Inadvertently, an unforgettable activity ended. There must be many experiences worth sharing in this activity, so it is necessary to write the activity summary carefully. Then how to write a beautiful activity summary? The following is a summary of the monthly activities of power supply safety production (selected 5 articles) collected by me, which is for reference only and I hope to help you.

summary of the activities of power supply safety production month 1

according to the spirit of the notice of the county company to carry out the "power supply service publicity month" in 2xx, according to the requirements, my place carried out the seventh "power supply service publicity month" in X. Through the development of this activity, the service level of our power supply was further improved, the quality of service was improved, the service concept of employees was improved, and a good image of customers for power enterprises was established, which laid a good foundation for enterprises to realize the goal of "two types and two types". The activities are summarized as follows:

1. Carefully understand the theme and guiding ideology of the activities, and carefully organize and arrange

According to the spirit of the superior documents, our office organized the staff to study and convey them at the first time, and set up an activity leading group with the director as the team leader, the deputy director as the deputy team leader, and the managers and electricians in the responsible area as members, and organized the staff of the whole office to study the documents carefully, understand the spirit, guiding ideology, theme and requirements of the activities, and make a thorough study of the whole activity content. After learning, everyone unified their thinking and made clear their work direction and tasks. At the same time, the tasks of each stage are divided into people, their respective responsibilities and tasks are clearly defined, work standards and time limit requirements are formulated, and assessment methods are unified.

2. "Serve with your heart, let actions be more exciting than slogans"

1. Before October 1th, I used three nights (from 19: to 22: ), which were divided into three groups, with the director, the technical safety officer and the 1KV specialist responsible for cooperating with the special personnel of each station. First, I measured the three-phase power load of 42 comprehensive transformers during the peak hours. Second, taking advantage of the dark at night, the pile heads, wire fittings, equipment connectors and distribution cabinet contacts of distribution transformers were inspected and registered; Third, the measured data and inspection results have been carefully and in detail registered, which has laid a good foundation for the next step of three-phase load balance adjustment and spring safety elimination. Fourthly, the Lvjiaqiao comprehensive substation in Yangcun, which urgently needs to increase the distribution transformer capacity, and the Beicun comprehensive substation in Beizhaizi County have been set up to increase the capacity and add new distribution transformers. Fifth, the layout, investigation and positioning of the overloaded distribution transformers Koucun and Liujiahe were carried out; At the same time, for the three-phase load imbalance greater than 15%, it is planned to gradually adjust in place from April to June.

2. Comrade Zhang Zhezhong, the technical safety officer, was in charge, and together with Yang Jiping, the 1KV special person, and the responsible persons of each substation conducted a comprehensive inspection of the high-voltage and low-voltage fuses of the distribution transformers in the jurisdiction of the whole substation, and replaced them in time if they did not match or other substitutes did not meet the requirements, and * * * replaced the high-voltage fuses 15A7, 1A13 and 7. Article 5A3; 6 low-voltage RTO4A6 and 2A8.

on March 8th and 9th, X, organized by Zhang Xinwei, the director, and assisted by Yang Jiping, Li Huanqi and Ji Jianbin, a comprehensive "physical examination" was conducted in five aspects, namely, safety management, equipment operation, power supply lines, metering devices and power supply contracts, for seven enterprises including Zhougongmiao Management Committee, key customer units, rubber hose factory and water supply company. The hidden dangers and defects found in the inspection were registered one by one, and the customers were instructed to eliminate the defects and rectify and repair in time. For enterprises without technical strength, the institute dispatched professionals to assist in handling and eliminate the hidden dangers, which laid a solid foundation for the safe production of enterprises.

3. Intensify publicity and enthusiastic service, and visit customers

1. According to the requirements of the document, we hung a banner of "Serve with your heart, make actions more exciting than slogans" in front of the firm to publicize the theme of the event and show the good looks of the company's grassroots window units.

2. Since March, only one telephone number "96789" has been used, and all employees are required to announce only one telephone number to guide customers to call 96789, so that customers can supervise our work at any time. Through publicity, the customer awareness rate has increased significantly.

3. From 19th to 23rd, X, we conducted a thorough investigation and registration with the local government, deputies to the people's congresses of village groups, CPPCC members, etc., and selected individual customers from the reception households of Saozi noodles, and randomly selected some customers from all residents' electricity customers. Comrade Li Huanqi led the responsible person to visit: First, actively listened to the opinions and suggestions of all sectors of society on our work and service; The second is to publicize our company's power supply policy and new service measures, so as to shorten the distance between us and our customers, grasp the shortcomings in our work in time, and at the same time, conduct a "look back" on the complaints of "96789" customers in 2xx to test their satisfaction with our work. This activity * * * visited 15 customers from all walks of life and 5 customers complained by "96789" customers in 2xx. Summary of power supply safety production month activities 2

In the coming April, under the correct leadership of superior leaders, with the concerted efforts of relevant departments and with the concerted efforts of all employees, we have achieved gratifying results:

1. Safety management:

1. Organize all employees to learn the activities of "learning lessons, troubleshooting hidden dangers and strictly controlling risks". On-site control has been strengthened to ensure safe production.

2. Strengthen centralized training and on-site education, organize all working leaders to learn the Guiding Opinions on Site Standardization Operation of Hengshui Rural Power System, and actively carry out on-site "two pushes and one integration" for the purpose of improving work efficiency and safety, which has laid a solid foundation for future on-site standardization operation.

2. Production operation

At present, it is the peak period of bird's nest construction, and our high-voltage power distribution class has stepped up inspection density to clear the bird's nest in time.

At present, it is the period of vigorous growth of trees, and the high-voltage distribution team constantly patrols the line corridors to find and stop the offline tree planting behavior in time, ensuring the safe and smooth flow of power line corridors within the jurisdiction, laying a solid foundation for the safe and stable operation of the power grid.

3. Marketing management

1. Continue to carry out the special work of high-loss area management, rotate and calibrate the meters in high-loss areas such as Daduan and Li Feng, replace worn-out meter boxes in some areas, and sort out the series lines of some meter boxes, thus reducing the leakage phenomenon and reducing the loss significantly.

2. Strengthen the patrol management of metering devices, discover the meter abnormality and start the transformer without permission in time, reduce the occurrence of abnormal electricity and avoid the fluctuation of 1KV line loss.

3. Complete the electricity fee recovery work this month on schedule, with the electricity fee recovery rate of 1% and the delivery rate of 1%

4. Excellent service

1. Visit the major customers in our jurisdiction, and solicit customers' opinions on power quality and power supply reliability, electricity fee collection after implementing the electricity price policy, troubleshooting, time limit for business expansion and installation, staff's service attitude, service quality and fulfillment of service commitments.

2. Provide door-to-door service to special customers, and help them check the indoor wiring and electrical equipment, which is well received by customers.

3. Strengthen the training of window staff, and strengthen the management from the aspects of personnel dress, environmental sanitation and code of conduct, so as to provide customers with a quality service environment. Summary of power supply safety production month activities 3

1. Safe power supply objectives

1. Further optimize and improve the power supply system to ensure that the power supply system is safe and reliable and the power supply capacity meets the requirements.

2. Continue to carry out energy-saving work and achieve the annual energy-saving target of 2xx.

second, the main measures taken

(1) actively carry out energy-saving projects and use advanced equipment and facilities to effectively control power consumption. In order to meet the needs of long-distance tunneling power supply, local reactive power compensation equipment with 114V power supply voltage is provided to reduce the loss of reactive power.

(2) Popularize the use of heavy-duty belts in the working face, and the conveying distance can reach more than 2, meters, which can reduce the number of belt conveyors, simplify links and reduce consumption.

(3) Promote the use of monorail cranes in the auxiliary dynamic conveying system, and gradually phase out the large-scale transportation mode of electric locomotives and the small and medium-sized transportation mode of winches.

(4) The main underground substations realize centralized power monitoring, so as to achieve the purpose of unattended operation.

(5) complete the frequency conversion reconstruction project of the main shaft strong belt.

(6) complete the frequency conversion transformation of 32 and 42 belt electric control systems.

2, scientific accounting, reasonable setting of power switch protection setting value, through regular testing, calibration and other means to ensure that the protection action is sensitive and reliable.

(1) Carry out electrical tests regularly by scientific detection means. For example, relay protection tester, infrared thermometer, digital grounding resistance tester and digital stray current tester are introduced.

(2) Introduce advanced power supply design software, scientifically calculate the power supply capacity, rationally select cables and equipment, simplify the calculation process, effectively reduce the labor intensity of technicians, establish a digital power supply system network, and strengthen the macro-control of the power supply system.

(3) train full-time electrical maintenance personnel, set up an electrical test team, conduct a comprehensive test on the equipment entering the well, and then enter the well after passing the test, and establish an electrical test file to realize the archival management of electrical equipment.

(4) Insist on popularizing and applying the "two-prevention lock" for power supply, strengthen the safety and reliability of power supply operation, and prevent misoperation.

(5) Establish three accounts, namely, Large Equipment Maintenance Account, Equipment Management Account and Explosion-proof Electrical Equipment Inspection Account, at each working face, and further consolidate the electromechanical management of grass-roots teams and groups by persistently refining the working process.

3. Strictly implement the "two votes" management system in power supply, insist on the team's attendance at the site

and implement the power supply measures, strengthen the management of power supply from various aspects and levels to ensure the safety of power supply. Summary of power supply safety production month activities 4

According to the requirements of the Notice of the State Electricity Regulatory Commission on Launching Safety Production Month Activities in the Electric Power Industry (Office Safety [xx] No.26), in June of XX, the electric power industry in our province widely launched the "Safety Production Month" activities with the theme of "Safe Development, Prosperity and People's Security". The activities are summarized as follows:

1. Strengthen the organization and leadership of the "Safety Month" activities

According to the notification requirements of the State Electricity Regulatory Commission, our office timely organized the electric power industry in the whole province to carry out the "Safety Month" activities, and issued the Notice on Carrying out the Activities of Electric Power Safety Production Month in the Electric Power Industry of xx Province (No.35 of Fujian Electricity Regulatory Bureau [XX]), and carefully organized a series of "Safety Months" in light of the actual situation.

the second is to carry out the theme activity of "xx trip for power safety in xx" to create a good atmosphere of "caring for employees' lives and paying attention to power safety" in the whole society;

the third is to carry out safety inspection activities before the peak summer to ensure the safe and orderly use of electricity;

the fourth is to carry out the network-related safety evaluation activities of xxx power plant to ensure the safe operation of newly-built units;

Fifth, carry out special seminars on safety production management to create a good safety awareness and atmosphere;

Sixth, strengthen the duty of flood control, do everything possible to play the role of power stations and reservoirs in promoting benefits and reducing disasters, and ensure dam safety. Through the development of various activities, the safety awareness of electric power employees has been further improved. All units attach great importance to the "Safety Month" activities, strengthen leadership, carefully formulate the "Safety Month" activity plan and plan according to the requirements of our activities, effectively organize the "Safety Month" activities, take the "Safety Month" activities as an important part of the work of safety production, and promote the implementation of all work of safety production.

II. Intensify publicity and carry out various forms of safety publicity activities

During the "Safety Month", our office organized the electric power industry in the whole province to carry out extensive and in-depth safety publicity activities. According to the arrangement of "Safety Month" activities, our office issued the Notice on Launching the Publicity Activities on the theme of "Eight Fujian Lines of Electric Power Safety in xx" (xxx Letter No.5), organized relevant units to carry out 11 activities with the theme of "xx Lines of Electric Power Safety", and reported the series of safety activities on the special news column of "China Work Safety News". It has been reported continuously that xx Electric Power Bureau's symposium was unique, xxx Electric Power Company's thought around the team, xx Power Plant's multi-pronged approach to achieve practical results, xxx Thermal Power Plant's severe drug abuse to control violations, xxx Development Co., Ltd.' s promotion of workers' skills, xxx Power Plant's establishment of rules and regulations to strengthen the foundation, xxx Power Plant's keeping an eye on every sign, xxx Company's lack of expert evaluation and xxx Group's News photos of "Guotai Min 'an" banner signing activity and news photos of the youth safety production debate competition of xxx Electric Power Company. The reporter of this newspaper also conducted a follow-up interview report on the inspection work of xxx Commissioner and xxx Deputy Commissioner in xx, xx, xx and other places.

xxx electric power company has carried out various forms of safety production knowledge publicity, with "caring activities" and "safety projects" as the main line, and in accordance with the requirements of "strictness, detail, practicality and innovation", it has created a strong atmosphere for carrying out safety production month activities, making the theme of the activities "safe development, peaceful country and people's safety" deeply rooted in people's hearts. Through the "safety production publicity and consultation day" activities, the publicity of power facilities protection and safe use of electricity will improve the awareness of power facilities protection and safe use of electricity; Hold a "Youth Safety Debate Competition" to raise the safety awareness of all staff and publicize the safety culture of "strictness, delicacy, practicality and novelty" in depth; Hold the "My Opinions on Safety in Production" employee forum, which provides a platform for employees to exchange experience in safety management; Go deep into communities, rural areas and schools to popularize the knowledge of safe and economical use of electricity, and spread the spiritual content of "love activities" and "safety projects", so that employees can not only fulfill their social responsibilities, but also promote their motivation to learn safety knowledge and master safety skills. Hua

Power xx Company held a seminar on safety production management. By summarizing the accidents and abnormal or attempted events in the power plant from January to May, this paper analyzed the weak links in the current company's system safety management, and put forward the difficulties and measures of closed-loop control. Xx Power Plant posted posters on the theme of "Safety Production Month" in the production and construction sites, publicized the legal system and safety knowledge of power safety on the website, and intensified the publicity of "Safety Month" in the form of exchange seminars and centralized lectures. Xxx Electric Power Company held a safety education class on "Laws and regulations related to safety production and accident case analysis", organized employees to watch safety production education videos and safety knowledge contests, and gradually pushed the safety month activities to a climax. Power generation owned by xxx group industrial company