Joke Collection Website - News headlines - Civilized construction inspection score?
Civilized construction inspection score?
1. Field fence
(1) The enclosure height shall be divided according to the local administrative area, and the enclosure height set around the construction site of the main road sections of the city shall not be less than 2.5m;; The height of enclosure around the construction site of general road section shall not be less than1.8m.
(2) The enclosure materials should be hard materials such as masonry and metal plate, and it is forbidden to use easily deformable materials such as striped cloth, bamboo basketry and safety net, so as to be firm, stable, neat and beautiful.
(3) The enclosure shall be continuously set around the construction site, and there shall be no gaps or weak points.
2. Closed management
(1) In order to strengthen site management, the construction site should have fixed entrances and exits. Doors should be set at entrances and exits to facilitate management.
(2) The entrance and exit should have full-time guard personnel and guard management system to effectively play the role of guard.
(3) In order to strengthen the management of personnel entering and leaving the site, it is stipulated that all personnel entering the construction site should wear work cards as proof, and the work cards should be neatly worn.
(4) In the form of entry threshold, enterprises and regions can design according to their own characteristics.
3. Construction site
(1) Concrete can be used for the ground on the construction site if conditions permit, and other ground hardening measures can be used unconditionally to make the ground smooth and solid. But in places where water is easy to accumulate, such as mixer shed, cement floor should be made and good drainage measures should be taken.
(2) The construction site shall be provided with a circulating trunk road, which shall be kept unblocked, and components and materials shall not be piled up. The road should be smooth and solid, and there should be no large area of water.
(3) The construction site should have good drainage facilities to ensure smooth drainage.
(4) The waste water and mud generated by the project construction should flow to the on-site water collection tank through running water trough or pipeline for unified precipitation treatment, and shall not be discharged at will, polluting rivers and roads outside the construction area.
(5) The pipeline on the construction site shall not run, run, drip, leak or accumulate water in a large area.
(6) Smoking is prohibited on the construction site to prevent danger. Fixed smoking rooms or smoking places should be set up according to the engineering situation. Smoking rooms should be far away from dangerous areas and equipped with necessary fire fighting equipment.
(7) The site should be as green as possible, especially in the main sections of urban areas.
4. Material stacking
(1) Tools, components and materials on the construction site must be stacked at the location specified in the general plan.
(2) All kinds of materials and components must be stacked according to varieties and specifications, and clearly marked.
(3) All materials must be neatly stacked, with bricks in cubes and sand, stone and other materials in squares. Large tools should be known at a glance. Steel bars, components and steel templates should be neatly stacked and padded with long wooden squares.
(4) The operation area and building floor should be cleaned up after work. In addition to the cast-in-place masonry concrete construction layer, the upper formwork with strength should be cleaned up and transported away in time, and those that cannot be transported away immediately must be packed neatly.
(5) The garbage cleaned on each floor shall not be piled up in the floor for a long time and transported away in time. Garbage on the construction site should also be classified and piled up in a centralized way.
(6) Flammable and explosive articles cannot be mixed. In addition to the centralized storage place on site, all kinds of scattered inflammable and explosive articles used by the team must be stored in accordance with relevant regulations.
5. On-site accommodation
(1) The construction area of the construction site must be strictly separated from the living area and cannot be mixed. The project under construction shall not be used as a dormitory, because staying in the construction area will bring various dangers, such as falling objects, electric shock or accidents caused by lax protection of the edge of the inner hole. For example, when there are two shifts, construction noise will affect workers' rest.
(2) The construction work area should be clearly separated from the office area and living area, and isolation and safety protection measures should be taken to prevent accidents.
(3) Winter accommodation in cold areas should have warm-keeping measures and measures to prevent gas poisoning. The fire site should be set up in a unified way, managed by special personnel and in charge of the post.
(4) In the hot season, the dormitory should have measures to cool off the heat and prevent mosquito bites to ensure that the construction personnel have enough sleep.
(5) Beds and all kinds of daily necessities in the dormitory should be placed neatly, the number of people should be limited indoors, there should be a safe passage, the dormitory door should be opened to the outside, the bedding should be stacked neatly and cleanly, and there should be no peculiar smell indoors.
(6) The surrounding environment outside the dormitory is sanitary, and no littering is allowed. Sewage buckets and sewage pools should be set up, and the roads around the house should be clear. When the indoor lighting is lower than 2.4m, use 36V safe voltage, and clothes are not allowed to be hung on wires and cables.
6. Fire prevention on site
(1) The construction site shall establish a fire control system or fire control measures according to the construction operation conditions, and record the implementation effect.
(2) According to different operating conditions, fire-fighting equipment shall be reasonably equipped. For example, dry powder non-conductive fire extinguishing equipment should be set near electrical equipment; Foam extinguisher should have the date of dressing change and sun protection measures. The location and quantity of fire fighting equipment shall comply with relevant fire control regulations.
(3) When the building construction height exceeds 30m, in order to solve the problem that the fire extinguishing effect is not enough by relying solely on fire fighting equipment, it is required to equip with sufficient fire fighting water source and self-help water consumption. The diameter of the riser is more than 2 inches, and there is a high-pressure pump with sufficient lift to ensure the water pressure. Each floor is equipped with a fire water source interface.
(4) The examination and approval system for hot work shall be established on the construction site. Any operation with naked flame must be approved by the competent department (when approved, the requirements and precautions shall be stated), and the guardianship personnel shall be set up according to the regulations during the operation; After the operation, you must make sure that there is no fire danger before you leave.
7. Comprehensive management of social security
(1) At the construction site, workers' spare-time study and entertainment places should be properly set up in the living quarters, so that workers can have a reasonable way to rest after work.
(2) The public security system and the division of responsibilities should be established on the construction site, and a special person should be responsible for checking the implementation.
(3) Public security work is not only an important work that directly affects the safety of the construction site, but also necessary for social stability. Measures should be taken to benefit and the effect is obvious.
8. Construction site signs
(1) The entrance to the construction site shall be neatly and clearly marked with "five signs and one map".
Five cards: project profile card;
Manage the network and supervise the telephone office;
Fire card;
Safety production card;
Civilized construction card.
If some areas think that content should be added, they can add it according to regional requirements. The content of the five certificates is not specified, but it can be required according to the characteristics of regions, enterprises and projects.
(2) Signs are important signs of the construction site, and not only the contents should be targeted, but also the sign production and standard signs should be standardized and neat, and the fonts should be neat.
(3) In order to further promote the safety of employees, it is required that the construction site should have necessary safety slogans in obvious places.
(4) the construction site should be set up to read newspaper columns, blackboard newspapers and other publicity gardens to enrich the learning content and praise good deeds.
9. Living facilities
(1) The construction site should be provided with toilets that meet the hygiene requirements, and flush toilets should be provided if conditions permit, and managed by special personnel.
(2) Keep the building and the construction site clean, and do not urinate anywhere. During the construction of high-rise buildings, a portable simple toilet can be set up every few floors to solve the practical problems of construction workers.
(3) The canteen building and canteen hygiene must meet the relevant hygiene requirements. For example, the chef must have a medical certificate issued by the health and epidemic prevention department, and raw and cooked food should be stored separately. The kitchen staff in the canteen should wear white work clothes, and the canteen should be inspected regularly.
(4) The canteen should post the health responsibility system in an obvious place and implement it to people.
(5) Workers on the construction site should be able to drink boiled water that meets the hygiene requirements. There are fixed water containers, which are managed by special personnel.
(6) The construction site shall be equipped with adequate shower facilities according to the number of workers. In cold season, the shower room should have heating and hot water, and the shower room should have a management system and special personnel management.
(7) The domestic garbage should be cleaned up in time, transported in containers, and not mixed with construction garbage, and managed by designated personnel.
10. Medical first aid
(1) The larger construction site should be equipped with the infirmary with full-time doctors on duty. General construction site unconditionally set up the infirmary, there should be health care medicine boxes and commonly used drugs, and there should be doctors visiting for medical treatment.
(2) In order to adapt to temporary accidental injuries, there should be first-aid equipment (such as stretchers, etc.) on site. ) timely rescue, not to expand the injury.
(3) The construction site should have trained and qualified first-aid personnel who know the general first-aid treatment knowledge.
(4) In order to ensure the health of workers, publicity and education on health and disease prevention should be carried out frequently in popular seasons and peacetime.
1 1. probation work
(1) The construction site is not a nuisance. Dust-proof and noise-proof facilities shall be set up according to the construction technology, which shall not exceed the standard (the noise on the construction site is not more than 85dB).
(2) According to local regulations, if the construction must be carried out outside the permitted construction time, it shall be approved by the competent department and the surrounding work shall be done well.
(3) Toxic and harmful substances shall not be burned at the site and shall be disposed of according to relevant regulations.
(4) The site shall formulate measures that will not disturb the people. Responsible for management and inspection, or contact the community regularly to listen to opinions, reasonable opinions should be handled in time, and make a good record of work.
The above information was collected and sorted by Zhong Da Consulting Company. For more information about "civilized construction inspection score", please pay attention to the column of Zhong Da Consulting Industry. "It is easy to win the bid with a little construction." For information about construction enterprises, please visit Zhong Da Consulting, Building Link or follow the official account of Zhong Da Consulting WeChat for information.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Related articles
- What is the purpose of Bank of Beijing?
- What are the majors of Liaoning Modern Service Vocational and Technical College?
- On November 16th, Gaoling District, Xi 'an urgently searched for people (Notice of Emergency Searching for People in Gaoling District, Xi 'an on November 16th)
- Ask for a report on college students' summer practice, about 3 words, about going to an accounting major such as a cable factory.
- Ask for the newsletter of the sports meeting
- Slogans in the sunset
- 12-word safety slogan
- How to write an evaluation of Confucius Center?
- The slogan of ABA Huanglong Scenic Area?
- Excellent slogan for campus travel