Flood prevention plan
In order to ensure that things or work are carried out at a high starting point, high quality, and at a high level, it is often necessary to formulate a plan in advance. The content and form of the plan must be developed around the theme, and ultimately achieve the expected effect and significance. So how should a plan be formulated? The following are examples of flood and flood control plans that I have carefully compiled (generally 6 articles). Welcome to read and collect them. Flood Control Plan 1
1. Purpose
Through simulation drills of flood control emergency plans, improve employees’ ability to respond to floods and test the branch’s rescue organization after floods. ability. Through drills, we can assess the actual effects of each functional rescue team, improve the professional level of each functional team member, and verify the feasibility and shortcomings of the plan through drills.
2. Simulation question
Assume that an early warning is received and the rainfall has been excessive recently, which may easily cause flood disasters. The project department immediately launched a flood control emergency plan to carry out flood fighting and rescue operations.
3. Drill time
A preparatory meeting is scheduled to be held at 1:30 pm on June 6, 20xx to explain the drill requirements, and the drill will begin immediately at 2:00 pm.
4. Drill location
The construction site of the 15th section of Shenyang Metro Line 2.
5. Participants
Flood prevention and rescue team and medical rescue team of the Metro Project Department.
6. Drill procedures
1. Alarm
Flood prevention alarms are very important. Early alarms can enable flood prevention and rescue work to start at the initial stage of flood conditions and control flood conditions in a timely manner. spread and expand. The flood control duty personnel called the police immediately and reported it to the project manager, deputy safety manager, and safety and quality department.
⑴The content of the alarm should include: the time and place (location) of the flood, and the flood prevention measures being taken.
⑵Every person at the scene has the obligation to call the police, and the content of the alarm must be accurate and clear.
2. Receive the report
⑴ Whether it is the project manager, deputy safety manager, or safety and quality department receiving the report, the rescue team must be notified as soon as possible to prepare for the rescue and arrive in time Flood control site.
⑵Understand the time, location, extent of injury, etc.
⑶Make records
⑷Notify the rescue team
⑸ Report to the relevant departments and leaders at the higher level
3. Emergency rescue operations
(1) After receiving the alarm, the flood control emergency command team of the project department should immediately follow the category of the flood and the flood accident and disaster procedures and For situations involving a wide range of situations, we will coordinate and command in a unified manner, urgently mobilize various rescue teams to participate in rescue and rescue operations, and invite relevant external forces to the scene for support when necessary.
⑵ Each person in charge of the command team must urgently mobilize corresponding materials, equipment, and personnel to implement emergency rescue or rescue in accordance with the requirements of on-site command.
⑶ If there is power at the accident site, it should be cut off immediately, and damaged roads, water, electricity and other facilities should be quickly restored to ensure the smooth implementation of emergency rescue work. Prevent the occurrence of secondary accidents and disasters.
⑷ Within 5 minutes after the security team enters the flood scene, they must do a good job in on-site traffic maintenance, guidance and evacuation of personnel, prevent and prevent various sabotage activities, and maintain public order.
⑸After receiving a report of a flood accident, the medical rescue team must rush to the scene quickly, mobilize medical staff and vehicles, and be responsible for sending the injured to the designated hospital for rescue.
⑹The material and equipment support team should ensure the timely transportation of emergency rescue materials according to the orders of the on-site command.
⑺Other relevant personnel should also actively cooperate with the rescue work according to the orders of the on-site command.
⑻During the process of emergency rescue and disaster relief, emergency call-out of equipment, materials, personnel and occupied sites shall not be blocked or refused for any reason. After the rescue and disaster relief work is completed, reasonable compensation should be provided.
7. Exercise summary
⑴Main problems discovered through the exercise
⑵Evaluation of the main situation of the exercise
⑶Evaluation of the plan Opinions on improving the content of drill procedures
⑷ Whether emergency equipment and facilities meet emergency requirements
⑸ Summarizing experience through drills
⑹ How to solve problems during the drill.
8. The resident supervisor is required to participate in this drill and provide guidance, and submit the drill summary to the Supervision Department. Flood Control Plan 2
It is crucial to do a good job in flood control to ensure the safety of property at construction sites and the lives of construction workers. This work plan is specially formulated based on the actual situation of our town.
1. Work Objectives
Adhere to the flood prevention work policy of "safety first, always be prepared and make every effort to prevent the first, and go all out to rescue", strengthen the organization and leadership of safety production work during the flood season at construction sites, Strengthen supervision and preventive measures, formulate preventive measures and deploy various tasks as early as possible, resolutely curb the occurrence of safety production accidents, and ensure a safe flood season.
2. Organizational Leadership
Establish a production safety leadership group for construction sites during the flood season:
Team leader:
Deputy team leader:
Members:
3. Flood prevention measures
Practical measures must be taken during construction at each construction site to reduce losses caused by floods. Flood control work should adopt active control, early research, early deployment, early start and early implementation to prevent problems in the bud.
(1) Strengthen organizational guarantees and clarify responsibilities
Each construction site under construction must establish a flood prevention and flood relief leading group to formulate practical flood prevention and flood relief and emergency rescue work plans based on its own actual conditions, and formulate Responsibility system and detailed implementation of responsibilities to individuals.
(2) Prepare materials and materials and build an emergency rescue team
Each construction site under construction should prepare raincoats, rain boots, flashlights, ambulance stretchers, commonly used rescue supplies, shovels and woven bags based on the specific conditions of the project. The purchase and storage of river sand, gravel, vehicles and other materials must be carried out. At the same time, strong personnel must be organized to set up an emergency rescue team and ensure that they can be involved in emergency rescue work as soon as possible when an accident occurs.
(3) Strengthen the publicity of flood prevention and flood relief and carry out emergency rescue drills
Each construction site under construction must make full use of slogans, radio and television staff meetings and other effective channels to carry out publicity and education on flood prevention and flood relief knowledge. , enhance workers’ awareness of disaster prevention, and organize a practical emergency rescue drill before the flood.
(4) Carry out safety production inspections during the flood season
Each construction site under construction must carry out self-inspections on production safety during the flood season. First, check the implementation of the main responsibilities of the project’s flood prevention and safety production, and various flood season safety inspections. Production measures and responsibilities are assigned to specific positions and responsible persons; second, check the safety protection of temporary offices, dormitories, work sheds, warehouses and other facilities at the construction site, and try to avoid areas that may be affected by disasters such as landslides, collapses, mudslides, etc.; third, strengthen Inspection of various key parts and links at the construction site, focusing on the construction site drainage, transportation road, slope, foundation pit support, scaffolding project, construction electricity, tall formwork project and support system, lifting, installation and disassembly project, underground excavation and underwater Supervision of some projects with higher risks such as operating projects; fourth, strengthen the monitoring of meteorology and construction during construction, provide timely warnings, and effectively carry out preventive measures.
(5) Implement the duty system to ensure smooth flow of information
Each construction site under construction must prepare a flood season duty schedule to ensure that communication equipment is open 24 hours a day, and proactively communicate with the meteorological department supervision unit Contact the emergency department to promptly grasp the rain and water conditions, carry out prevention and evacuation work before danger occurs, reduce property losses and avoid casualties. Once a danger occurs, promptly report it to the town's construction site safety leading group during the flood season, and organize an emergency rescue team to engage in rescue and disaster relief to ensure the safety of construction workers and people in the disaster-stricken area and minimize property losses. After the emergency rescue team from the superior unit arrives, all actions must follow the command.
4. Principles of construction during the flood season
(1) Strengthen contact with the meteorological and hydrological departments to understand the local natural climate and geological conditions and the specific construction tasks of the project, and carry out targeted construction tasks Prepare the construction organization design and technical measures during the flood season, make reasonable arrangements for the construction during the flood season, and prepare sufficient suitable construction materials and protective equipment to avoid affecting the progress of the project due to difficulties in material preparation.
(2) Production facilities such as residential warehouses, vehicles, machinery and equipment should be parked above the flood level and away from the alluvial piles of debris flow trenches. Temporary drainage facilities should be built to ensure that the working site is not flooded and can Remove surface water promptly.
(3) According to the weather forecast and the actual situation of the project, move the mechanical equipment out of the dangerous area in batches before the flood arrives and park it in a safe location, build drainage facilities to discharge accumulated water in a timely manner, and prevent the collapse of gullies during heavy rains , ensure safety.
5. Work Requirements
(1) Raise awareness and strengthen organizational leadership
Relevant units at construction sites must attach great importance to safety production during the flood season and conduct in-depth analysis This department carefully formulates flood relief plans and emergency rescue plans based on the safety production situation, strengthens supervision and inspection of the implementation of responsibilities, and establishes a safety risk assessment system, a hidden danger investigation and rectification system, and an accident liability investigation system. Carry out comprehensive flood season inspections in a timely manner to eliminate various accident hazards and ensure the safety of people's lives and property.
(2) Implement measures and strictly supervise and enforce law
Each unit must conduct self-examination and self-correction on its own production safety responsibilities, staffing, emergency plans, rectification of hidden dangers, and other safety production situations. For problems and hidden dangers discovered during inspections, we must urge them to rectify and eliminate them, and "look back" in a timely manner. Major hidden dangers discovered must be resolutely listed for supervision, and projects or units that fail to rectify or refuse to rectify shall be resolutely and severely punished.
(3) Strengthen duty and report timely information
It is necessary to strengthen duty during the flood season and strictly implement the 24-hour duty system. Personnel on duty must stick to their posts, ensure smooth communication, and do a good job After analysis and judgment of relevant information, in the event of an emergency or major emergency or major disaster, we must immediately request instructions and report, take effective measures to deal with it, and organize and carry out early emergency rescue work in a timely manner. Companies and individuals who make false reports or conceal accidents will be severely punished in accordance with the law. Flood Control Plan 3
In order to effectively carry out flood prevention and relief work in the county's transportation system in 20xx, ensure safe and smooth flow, effectively control and eliminate dangers, and avoid and reduce casualties and property losses to the greatest extent, according to the county Based on the spirit of the government's flood prevention work conference and the municipal bureau's flood prevention work guidance, combined with the actual situation of our county's transportation system, a flood prevention work plan for 20xx was formulated.
1. Overall requirements
Flood prevention work is related to the safety of people’s lives and property, as well as to economic construction and social stability. It is necessary to fully understand the seriousness of floods, resolutely overcome the weak awareness of floods, numb thoughts and luck, and enhance the sense of responsibility and urgency. In the event of excessive floods, all efforts must be made to protect and ensure the safety of major transportation facilities, and emergency response measures must be in place to minimize flood losses. In the event of flood threats and damage, emergency repair tasks will be completed to ensure normal traffic on the highway. Adhere to equal emphasis on flood prevention and waterlogging prevention, and focus on both flood prevention and drought relief to ensure that the transportation department's flood prevention and drought relief tasks are completed.
2. Work Responsibilities
According to the definition of the responsibilities of the member units of the County Flood Control Headquarters, the flood control responsibilities of each unit of the transportation system are as follows:
Highway Bureau: Responsible for the county area For the flood control safety of trunk highway traffic such as national highways and provincial highways, manpower and material resources are promptly organized to repair flood-damaged highways, bridges and culverts to ensure smooth roads.
Rural Highway Management Office: Responsible for the flood control safety of rural highway traffic within the county, and promptly organizes manpower and material resources to repair rural roads damaged by water, bridges and culverts, and ensure smooth roads.
Transportation Authority: Responsible for organizing and coordinating the transportation of flood rescue and relief materials and evacuees.
Law Enforcement Office: Responsible for maintaining order at the scene of a major flood; assisting the public security department to ensure smooth roads in dangerous sections.
County Truck Transportation Company and Municipal Passenger Transport Company: Responsible for organizing material transportation for flood prevention and rescue, disaster relief and key flood relief projects.
Bureau: Responsible for communication among team members during flood prevention and internal flood prevention management and coordination within the transportation system.
3. Organizational leadership and division of labor
In order to clarify responsibilities, strengthen inspection and supervision, and compare the responsibilities of each unit, the division of labor among the members of the bureau's flood control headquarters is as follows:
xxx : Responsible for the overall flood prevention work and provide unified command for the overall flood prevention work.
xxx: In charge of the flood prevention work of the bureau, responsible for the daily work of the bureau's flood prevention headquarters, and assisting the director in coordinating the flood prevention work of the entire system.
xxx: Responsible for the flood prevention work of the Highway Bureau.
xxx: Responsible for the flood prevention work of the Transportation Development Company.
xxx: In charge of the flood prevention work of the Transportation Management Bureau, County Truck Transportation Corporation, and Municipal Yunguang Mountain Company.
xxx: In charge of the flood prevention work of the rural highway management office.
xxx: In charge of the flood prevention work of the law enforcement station.
The administrative leader of each unit is the first person responsible for flood prevention work in the unit.
4. Arrangement of rescue personnel and vehicles
The entire system has prepared 120 flood prevention and rescue personnel and 40 vehicles. Among them: 30 people in the Highway Bureau, 10 vehicles; 20 people in the Transportation Management Bureau, 10 social vehicles; 30 people in the law enforcement office; 30 people in the County Automobile Transportation Corporation, 10 vehicles; 30 people in the Municipal Passenger Transport Company, 10 buses . In the event of a severe flood or danger, the personnel of each unit will be led by the unit's first responsible person, and the vehicles will be led by the unit's leader in charge to participate in the rescue mission (the list of rescue personnel from each unit shall be reported to the bureau's flood control office, which is located in the bureau's business unit).
5. Work requirements
1. Strengthen flood prevention awareness. All units must effectively strengthen the leadership of flood prevention work, organize carefully, actively prepare, fully perform the responsibilities and obligations of the Flood Control Law, enhance flood awareness, firmly establish the idea of ????being prepared for danger in times of peace, and be constantly prepared, and proactively carry out flood prevention work.
2. Strictly implement the flood prevention responsibility system. Comprehensively implement the administrative top leader responsibility system to ensure that the thoughts, work, command and investment are in place. Team members and relevant personnel must have clear responsibilities, clear tasks, perform their duties and responsibilities, and cooperate closely.
3. Strict flood prevention work disciplines. Flood prevention work has a heavy responsibility. All units must consider the overall situation and the safety of people's lives and property, fully understand the importance of flood prevention work, strictly abide by relevant regulations, obey orders, and obey instructions. Anyone who delays work due to dereliction of duty, negativity, prevarication, etc. and causes losses must resolutely hold the relevant leaders and parties accountable.
4. Before the flood season, each unit must conduct a comprehensive inspection of its infrastructure, roads, bridges, production workshops, yards, stations, construction sites, and vehicle safety conditions, and promptly rectify hidden dangers if they are discovered. Eliminate potential accidents in the bud, closely integrate flood prevention with the "Safety Production Month", "Safety Production Year" and special production safety rectification activities to ensure that flood prevention and safety production are both correct, and ensure a safe passage through the flood.
5. During the flood prevention period, the top leaders of each unit must ask for leave from the main leaders of the bureau if they go out for business or private reasons. Otherwise, they will be treated as a disciplinary violation. All units must adhere to a 24-hour duty system. In case of danger, rescue personnel and vehicles must be on call to ensure nothing goes wrong. Flood Control Plan 4
Our town is located in a mountainous area with complex terrain and many mountain ponds and reservoirs. In addition, the mountain forest coverage has declined in recent years, which has affected the balance of forest ecology, causing serious water and soil erosion, and even Frequent floods endanger the normal life of the people and the safety of life and property. In order to do a good job in prevention and reduce losses, a militia flood prevention and rescue plan has been formulated.
1. Improve the organization and strengthen leadership.
A flood prevention and rescue command post was established in the town, with the town mayor xxx as the commander and the town armed department officer xxx.
Served as deputy commander, and established the Boyang Town Flood Control Headquarters leading group composed of heads of the town’s water conservancy station, radio station, post office, telecommunications branch, town supply and marketing cooperative, etc., mainly responsible for flood prevention and rescue operations timely command and normal flood prevention work.
2. Raise awareness and take precautions.
All units must put flood prevention and emergency rescue work on their agenda and rely on the masses to do a good job in flood prevention and rescue work. The first is to understand the topography of the region and the changes in flood disasters over the years, formulate flood prevention and rescue plans and action plans based on actual conditions, and make emergency preparations to reduce losses caused by floods; the second is to strengthen the management of affiliated mountain reservoirs and determine Dedicated personnel are responsible for strictly abiding by reservoir management regulations, implementing the reservoir safety inspection system, and promptly reporting and handling any problems found.
3. Measures for flood prevention and emergency rescue.
1. Use town wired communication as the main communication tool, and use mobile phones as auxiliary communication tools when necessary. During the flood season, the Telecommunications Branch will open a dedicated telephone line and ensure that a dedicated person is on duty to promptly grasp and report the flood situation;
2. As a sharp force for emergency rescue and disaster relief, the town militia emergency team must obey the dispatch of the town flood control command post at any time. The militia emergency teams of the four villages of xx, xx, xx, and xx, after receiving orders from the town command post, must quickly arrive at the designated assembly area to receive rescue tasks. It is necessary to confirm the transportation vehicles. Once traffic is blocked, they will rush to the assembly area on foot. Other village soldiers are mainly responsible for flood prevention and rescue tasks within their own village groups.
3. Strengthen flood prevention and rescue work for important targets. In addition to being responsible for disaster relief tasks in their own villages, xx and xx village soldiers (including emergency teams) should also be responsible for emergency and disaster relief tasks for town-affiliated units.
4. Rescue procedures in the event of a disaster. Town leaders organized personnel transfers and then rescued important targets and warehouses.
5. Be vigilant and prevent criminals from taking the opportunity to cause damage.
6. Prepare the living arrangements for the victims after the disaster, actively organize post-disaster production and self-rescue, and rebuild their homes.
2. Obey orders and obey commands;
3. Each village, especially those with emergency response teams, must have designated personnel on duty during the flood season, and the village battalion commander should be on duty. Flood Control Plan 5
In order to ensure the normal development of flood control work in the jurisdiction, create a safe social environment, maintain stability, development, and serve the overall situation, the annual flood control work plan (arrangement) is as follows:
1. Raise awareness, overcome paralyzing thoughts, and make serious preparations for flood prevention
In accordance with the unified deployment of the district flood control office, we should make early preparations based on preventing and fighting major floods. We must attach equal importance to flood control and waterlogging control, and proactively focus on prevention and control. The 618 drainage channel all flows through our jurisdiction, and the water level has been relatively high during flood seasons over the years, posing a greater threat to our jurisdiction. In addition, the drainage pipes in the jurisdiction are not smooth, the rivers are seriously silted, and the flood control projects are incomplete. Therefore, the street flood control work is under great pressure and arduous tasks. Villages, communities, resident enterprises, institutions, and government departments must overcome paralysis and fluke mentality, and must Be fully prepared ideologically, organizationally, and in terms of measures to be constantly prepared and prepared.
2. Clarify tasks, implement measures, and ensure safe floods
This year’s flood prevention work in streets resolutely implements the policy of “safety first, constant preparation, prevention first, and full rescue efforts” The guidelines, specific tasks and measures are:
1. All villages, communities, resident enterprises and institutions, and street departments must conscientiously follow the requirements of the "Flood Control Law" and fully implement the leadership flood control responsibility system. The main leaders shall be responsible for their own units. Responsible for flood control work.
2. According to the unified deployment of the district and combined with the situation of our sub-district, each village (community) is responsible for the specific responsibility within the village (community) area, and each unit in the area is responsible for its own affairs. Flood control in the area. The sub-district flood control office is responsible for organizing the preparation of flood control materials for emergency rescue.
The Street Justice Office cooperates with the Tanjia Police Station to maintain flood control order, organize the evacuation and transfer of people, and crack down on criminals who steal flood control materials and destroy flood control projects and communication circuits.
3. It is necessary to establish the policy of “prevention is the priority, and prevention is more important than robbery” to carry out pre-flood inspections: (1) Each village, community, and resident enterprises and institutions must conduct inspections of flood prevention facilities, school classrooms, A careful pre-flood inspection will be carried out on material warehouses, employees and people's housing. (2) The leaders of each village (community) in the subdistrict are responsible for the overall responsibility of the village (community). (3) All departments of the agency shall conduct comprehensive inspections of the villages (communities) included in the project, and any problems found must be rectified within a time limit. All units are required to clean and dredge drainage facilities in a timely manner to ensure smooth drainage. For low-lying land prone to waterlogging, it is necessary to strengthen the management of drainage facilities, assign dedicated personnel to take charge, and give full play to their drainage capabilities. Leaders and units with separate responsibilities must not only do pre-flood inspections and preventive measures, but also be responsible for the entire flood prevention process. in the end.
3. Organize a rescue team and reserve materials
The street organizes a militia flood control and emergency response team with a total of 40 people in the militia emergency battalion. During the flood season, it is directly unified by the street armed department. Organize and command, and be responsible for emergency rescue work; each village and community is also dominated by public security joint defense members, and a rescue commando team of no less than 10 people is formed according to the size of the village (community), which is uniformly deployed and commanded by the sub-district flood control office. Each unit stationed in the street must set up a flood prevention office and rescue commando team according to the size of the unit and the severity of the task. The street prevention and protection office is responsible for organizing a 10-person rescue team to be responsible for medical rescue work and organization of health and epidemic prevention work during flood fighting and rescue operations.
Before the flood, all units must carry out necessary technical training to ensure that they can pull out, grab and hold when danger occurs, and be prepared for flood fighting and rescue operations.
The flood control materials and emergency equipment required by each village, community, and resident unit are based on the principle of self-reliance and local materials, and a combination of collective reserve and mass reserve is adopted. Reserve early and have dedicated personnel to keep it; Use it as you go, so you don’t miss the chance to rescue someone.
4. Establish a duty system and strengthen the information communication and request system
From now on, all villages, communities, and resident enterprises and institutions will be led by leaders to implement day and night duty, and the duty arrangements will be reported Street Flood Control Office. Heavy rain is an order. If heavy rain lasts for more than half an hour during the flood season, rescue team members from all units will be on duty. If they encounter danger, they will promptly ask for instructions and report in time.
5. Strengthen organizational leadership and establish and improve flood control institutions
Flood prevention and fighting are related to the overall situation and the responsibility is heavier than Mount Tai. All villages, communities, and resident units must proceed from the overall situation of stability, development, and service, effectively strengthen the leadership of flood prevention work, and conscientiously implement various flood prevention responsibility systems with responsibility systems as the core. The street established a flood prevention leading group and office to carry out flood prevention work in the street. Each village, community and resident unit should also establish a flood prevention leading group, with the main leader as the leader.
6. Strict discipline and flood prevention in accordance with the law
All units must establish an overall concept, strictly implement flood prevention disciplines, obey dispatch and command, work together, cooperate closely, unite to fight floods, and never allow themselves to Its matter. In emergencies during the flood season, the sub-district flood control office has the right to mobilize materials, equipment, transportation and manpower, and take other necessary emergency measures based on the needs of flood control and relief. It is necessary to further implement the "Water Law", "Flood Control Law", "River Management Regulations" and other flood control laws and regulations, and refuse to clear obstacles or set up new obstacles for those who defy crowds to cause trouble and interfere with project management and flood control order, and excavate without authorization in dangerous river sections. Those who seize soil from sand, refuse to listen to dissuasion, destroy or steal flood control projects, flood control materials and flood control facilities, embezzle or misappropriate flood control and relief materials and funds, or cause losses due to dereliction of duty or illegal operations, the direct leaders and parties involved must be held accountable in accordance with the law. Recognize units or individuals that have made contributions to flood prevention, rescue and disaster relief work. Flood Control Plan 6
1. Flood Control Guiding Thoughts
Attach great importance, strengthen leadership, closely monitor, timely forecast, and accurately attack, with the purpose of ensuring the safety of national property and people’s lives, and make every effort Emergency rescue and disaster relief to minimize losses caused by disasters.
2. The goals and main measures of this year’s flood prevention work
The goal of this year’s flood prevention work is to implement the prevention policy of “safety first, prevention first, constant preparation, and full-scale emergency rescue” , based on preventing major floods and fighting major disasters, formulating plans, countermeasures and measures from the aspects of organization, system, personnel, materials, etc. for various types of flood disasters that may occur. The main measures taken:
(1) Raise awareness and further strengthen leadership in flood prevention work.
Our bureau must fully realize that floods are an extremely destructive natural disaster. It not only destroys the results of the natural forest project and the conversion of farmland to forest project, damages the ecological environment, but also causes huge consequences. Economic losses and losses of people's lives and property, but also affecting social stability and the realization of the country's sustainable development strategy. In accordance with the requirements of the party's mass line education and practice activities and the spirit of being highly responsible to the people, and proceeding from the overall situation of reform, development and stability, flood prevention work must be included on the important agenda.
(2) Earnestly carry out flood prevention publicity and effectively improve flood prevention awareness.
Each forestry station must regularly go deep into forest areas, pastoral areas, and villages, and carry out various forms of publicity activities with rich content in conjunction with the "Flood Control Law", "Flood Control Regulations" and other laws and regulations, and adopt centralized publicity and The publicity method of decentralized combination, fixed-point publicity and mobile publicity can make flood prevention penetrate into the hearts of every person in the forest area, so that the majority of forest area cadres and the masses can increase the enthusiasm and consciousness of flood prevention.
(3) Strengthen inspections to eliminate hidden dangers in flood prevention.
Cadres and employees of each forestry station and forest rangers in each township must earnestly perform their duties and intensify the elimination of disaster-prone rivers and mountains in their jurisdictions, so as to predict and warn in advance to prevent floods. disasters and landslides.
(4) Strengthen the duty and flood prevention reporting system.
During the flood prevention period, our bureau must adhere to the 24-hour duty system. Leaders must personally lead the shift and handle relevant matters in a timely manner. They must effectively enhance their sense of mission and responsibility, stick to their posts, and ensure that the situation is clear and the data is accurate.
(5) Further improve the supply of flood-prevention and disaster-resistant timber and actively improve response capabilities.
Our bureau will do a good job in the supply of flood-prevention and disaster-resistant timber and reserve a certain amount of timber. If a flood occurs, the timber transportation location will be arranged at the County Jintang Timber Processing Plant, which can provide the required timber to the disaster area at any time.
- Previous article:Live broadcast of the closing ceremony of Beijing Winter Olympics
- Next article:How to treat the recent devaluation of virtual currency?
- Related articles
- What is the summary of the fourth National Constitution Day?
- HD pictures of landscape paintings. What are the best pictures of landscapes?
- What kind of socialist basic economic system should we build, adhere to and improve?
- Instructions for heatstroke prevention and cooling at high temperature (6 general articles)
- What about Shanghai Valeo Automotive Electrical System Co., Ltd.?
- Short essay on safe electricity use 1500 words.
- Take the wallet.
- How to make an English club poster? English poster design about promoting the painting club
- Quotations from three views on cancer
- Take the garbage slogan.