What should I do if I don’t know how to get approval until I have already done the door opening?

If you realize that approval is needed after the door head has been built, you can follow the steps below:

1. Stop the continued construction of the door head immediately and retain the status quo to avoid causing greater damage. changes and losses.

2. Prepare the materials required for door approval as soon as possible. Different regions and cities may have different requirements for door approval. Specific required materials may include but are not limited to: a copy of the store business license or industrial and commercial name approval, a copy of the lease contract, and outdoor billboard renderings (color required). , when shooting, you should take photos of about 80cm above and below the door), application report (including setting location, release time, content, form, specifications, quantity, etc., need to be submitted in duplicate), copy of property ownership certificate and store location Figure etc.

3. After preparing the materials, submit the application to the relevant department as soon as possible, and make modifications and adjustments based on the review results to meet the approval requirements.

4. If the approval is not passed, corresponding modifications and adjustments need to be made according to the opinions of the approval department to meet the requirements of regulations and standards.

It should be noted that door approval is a necessary procedure. If you carry out door construction without approval, you may face the risk of fines or other legal consequences. Therefore, before starting door construction, you should understand the relevant local regulations and standards to ensure that the construction meets the requirements.