Joke Collection Website - News headlines - Community Flood Prevention Briefing

Community Flood Prevention Briefing

The main contents of flood prevention include: long-term. mid-term. Short-term weather situation forecast, flood water regime forecast, dispatch and application of flood control projects such as embankments, reservoirs, sluices, flood storage and detention areas, rescue and relief after dangerous disasters, emergency measures in extraordinary circumstances, etc. The following is a community flood prevention briefing for reference only. Community Flood Prevention Briefing Part 1

On the afternoon of June 17, 20xx, Pioneer Community held a meeting of all staff to fully launch the flood prevention work in Pioneer Community.

Secretary He emphasized: We should take a proactive attitude, combine it with the actual work, and be based on the idea of ??early, practical and good, based on the idea of ??preventing major floods and fighting major disasters, and vigorously publicize it so that The enterprises, institutions and residents in the jurisdiction are well known to everyone.

Deputy Director Wang Tengda made specific arrangements for the work:

1. Set up a community rescue team composed of 50 people;

2. Carry out blanket investigations work; determine the key parts of flood control, determine the leader and person responsible for guarantee;

Introduce the basic situation of key flood control areas (the fourth, fifth, and sixth grids are key flood control areas)

p>

3. Determine the Pioneer Community Public Service Center and Sunshine Kindergarten as emergency refuge points for flood prevention; 4. Arrange personnel to inventory flood prevention materials to prepare for flood prevention.

5. Arrange personnel to issue "emergency evacuation notices" to residents of bungalows, informing residents to move out of dangerous houses and take emergency refuge; 6. The community establishes a 24-hour duty and night inspection system during the flood season to promptly respond in case of floods Disposal and reporting. Community Flood Control Briefing 2

Recently, due to the impact of heavy rainfall, most areas of our county have experienced heavy rainfall. In order to ensure the safety of various reservoirs and the safety of people’s lives and property in the jurisdiction, the xx Town Party Committee and Government have closely Deploy and promote new flood prevention measures to ensure safe floods.

In response to the characteristics of the new round of heavy rainfall, which include heavy rainfall, fierce rainfall, and strong intermittent rainfall, xx town has adopted the method of always paying attention to the weather forecast and strengthening SMS warning notifications of rain and water conditions. Once heavy rainfall occurs,

Early warning notices and preventive measures will be communicated to each reservoir management staff in the form of text messages and phone calls as soon as possible; secondly, attention will be paid to patrol inspections of dikes, with special attention to the possible occurrence of river basin floods.

Focus on preventing the occurrence of floods and geological disasters, and implementing reservoir and emergency rescue and disaster relief responsibilities; again, relevant personnel of various departments attach great importance to and take strict precautions.

Although the current water levels of all reservoirs in xx town are lower than the flood limit water level and the normal water level, the safety of the rivers is related to the overall situation, and the responsibility for flood control is heavier than Mount Tai. If we do not take precautions and take precautions in the bud, in the event of a major disaster Heavy rainfall and major floods may cause danger in these reservoirs, triggering disasters and secondary disasters.

At present, xx town is taking a series of more powerful new measures to ensure that the town can survive the flood safely.

On May 28, Yu Zhengyi, Party Secretary and Deputy Director of the Standing Committee of the County People’s Congress, and Wang Xianxian, member of the Standing Committee of the County Party Committee and Director of Propaganda, went to Hongxiang, Kunshan, and Niubu to inspect and guide flood prevention and drought relief work.

Yu Zhengyi and Wang Xianxian, accompanied by the main responsible persons of each township, inspected the Liantangwei plugging and dike restoration project, the Xinhua Reservoir reinforcement project, and the Qingshanwei deconstruction project, and listened to the Report from the main person in charge on the progress of flood control and drought relief work.

During the inspection, Yu Zhengyi and Wang Xianxian pointed out that the terrain of our county is complex and the rainfall is concentrated during the flood season every year. All localities must establish the idea of ??preventing major floods and resisting major disasters; they must strengthen leadership and strictly enforce disciplines in flood prevention and drought relief.

Formulate flood control and drought relief plans to ensure that flood control personnel, materials, and responsibilities are in place; we must do a good job in cleaning up and supervising flood control projects under construction and removing risks on river embankments to ensure that floods can be safely spent.

At the same time, all towns and villages must strengthen drought-resistant preparations, promptly repair irrigation facilities, and support and maintain drought-resistant machinery and equipment. They must increase efforts to repair channels, improve drought-resistant benefits, and effectively achieve Flood control, drought relief, and ensuring a good agricultural harvest. Community flood control briefing part 3

On the afternoon of June 28, the heavy rain continued for about 2 hours. In order to ensure the safety of the lives and property of the residents in the area, our neighborhood committee attaches great importance to After the rain, we immediately organized staff from the two committees and grid members to conduct flood inspections in key areas under their jurisdiction. After several hours of inspections, no disaster was found that day.

At 8:30 in the morning on the 29th, during the investigation, the flood prevention investigation team of our neighborhood committee found that the railway wall opposite the relocation building of the water and coal line in the jurisdiction collapsed. The staff immediately launched a detailed investigation. According to the investigation, there were no casualties. Accidents and property damage to residents.

According to reports from nearby residents, the fence collapsed around 6 a.m. this morning due to a landslide caused by heavy rain yesterday afternoon. My neighborhood committee secretary reported the situation to the Hongyan Community Service Center truthfully.

In less than 20 minutes, the leader of Hongyan Community Service Center, Director Xu Daqing, and his party came to the scene to check and understand the disaster situation, and made a request to our neighborhood committee: There have been continuous heavy rains recently, and inspections and inspections must be stepped up. Early detection and early elimination can avoid accidents and disasters. Community Flood Control Briefing Part 4

We learned from the Municipal Flood Control Office that since the beginning of the flood season, heavy rainfall has occurred frequently in our city, and the flood control situation is severe. According to the notices issued by the National Defense Headquarters, the Autonomous Region Flood Control and Drought Relief Headquarters Office, and the requirements of the Municipal Party Committee and Municipal Government, our city has further arranged and deployed the current flood prevention and drought relief work.

The Municipal Flood Control Office requires those responsible for flood control at all levels to conduct a flood control inspection at the reservoir and hydropower station where the administrative responsible person is responsible in accordance with the deployment of the autonomous region flood control and drought relief headquarters and the deployment arrangements of the administrative head responsibility system for flood control and drought relief work. Persons in charge of reservoirs and ponds in cities, counties, townships and villages must fulfill their responsibilities, duties, inspections and reports. Persons responsible for flood prevention at all levels must keep their mobile phones open 24 hours a day to ensure that they are constantly on duty and never missing their posts.

At the same time, the flood control and drought relief headquarters of each county (development zone) and relevant units must strictly implement the 24-hour duty and leadership system according to their responsibilities and division of labor, and strengthen the collection and reporting of rain, water conditions, and disaster conditions. Send work. On the basis of pre-flood safety inspections, the city's dangerous reservoirs and hydropower stations, flood control projects under construction, flood-prone and waterlogging-prone areas, flash flood hazard areas, geological disaster hazard points, urban flood control and drainage, emergency pumping and drainage facilities and other flood control Conduct a comprehensive inspection of hidden risk points and weak links, and provide written rectification suggestions for problems discovered during the inspection, and rectify them within a time limit.

Our city’s flood control department will further improve the emergency plan and make emergency preparations to ensure that personnel, disaster relief materials and coordination are in place. Once danger or disaster occurs, emergency rescue and evacuation and transfer of people must be carried out quickly to ensure the safety of people's lives and property and minimize losses. Community Flood Control Briefing Part 5

All the staff of the Zhengnan Huai Embankment Flood Control Command Brigade carefully studied Secretary Li Jinbin’s important speech

On the morning of July 29, the Zhengnan Flood Control Command Brigade of Zhengyangguan Town held a meeting At the meeting, we focused on studying the speech delivered by Comrade Li Jinbin, secretary of the Provincial Party Committee, at the flood prevention and relief work dispatching report meeting, and conducted collective discussions on the current key flood control tasks, existing problems and solutions on the Zhengnan Huai Embankment in our town. The meeting was personally arranged and deployed by Deng Zuyang, secretary of the town party committee and captain of the Zhenzheng Nanhuai Embankment Flood Control Brigade, and deputy captain Cao Shijun presided over the study discussion. Through careful study, the participants further improved their understanding of the importance of current flood prevention work, further strengthened their belief that people are first and life is first, and are determined to follow Secretary Li's requirements and pay close attention to all flood prevention and relief work. Under the unified command of the work, we will do a solid job in the current flood prevention work to ensure that the Zhengyang Pass prevention section is foolproof.

In response to the current flood control work hours being gradually extended and the water level of the Huaihe River falling slightly, in order to prevent the flood control migrant workers from relaxing and war-weary, the town flood control command brigade requested to further increase the ideological education of cadres on the embankment and civilian work, so as to Do not relax in your thinking, carry forward the spirit of continuous fighting without fear of hard work, never relax in patrolling dikes to inspect dangers, and report problems immediately if they find any. It is necessary to step up inspection and supervision. The Zhenzhengnan Huaidi Command Brigade is divided into three squads, each led by three deputy captains. They inspect the flood prevention situation of each squadron, carefully record the inspection situation, point it out in person, and make immediate rectifications. and promptly report inspection results. Community Flood Prevention Briefing Part 6

On the afternoon of January 28, Lin Xiaoti, director of the Municipal Flood Control and Disaster Reduction Office and director of the Municipal Water Conservancy Bureau, listened to a report on the construction of the west drainage project and asked all relevant units to increase their sense of urgency and make up their minds. , in accordance with the target requirement that the westward flood-discharging river should have water conditions before July 15, 20xx, seize the time node, reverse the construction period, and pay close attention to implementation.

It is reported that by the end of 20xx, the West Row Project had completed a total investment of 560.15 million yuan, accounting for 74.7% of the total investment. At present, the main difficulties and problems existing are: first, there is a serious shortage of waste soil transportation vehicles; second, the processing of some houses, tombs, and forest land that have not yet been demolished is still difficult; third, the preliminary preparations for the construction of resettlement houses are progressing slowly. Director Lin Xiaoti emphasized that as long as we are determined, the above problems can be solved. It is hoped that the municipal and district headquarters will, in accordance with the requirements for water supply before the main flood season, use their brains, find ways, come up with ideas, pinpoint the crux of problems and difficulties, and actively seek solutions; scientifically formulate work plans, carefully organize and implement; be good at organizing and implementing them; Report and ask for instructions to win greater support from the local party committee and government; act quickly, prioritize and implement various tasks one by one.

Wang Aixiang, deputy director of the Municipal Flood Control and Disaster Reduction Office and deputy director of the Municipal Water Conservancy Bureau, Shen Linjie, member of the party group and director of the Municipal Water Conservancy Bureau Office, the Municipal Westward Flood Drainage Project Construction Headquarters, the Lucheng Section Headquarters and the Ouhai Section Commander Relevant persons in charge of the department attended the report meeting. Community Flood Control Briefing Part 7

On May 3, the city’s flood control and drought relief work meeting was held. The meeting reported on this year's weather situation and last year's flood control and drought relief work, arranged and deployed this year's flood control and drought relief work, and signed a letter of responsibility for flood control work. Li Fujun, deputy mayor and commander-in-chief of the Municipal Drought and Flood Control Headquarters, attended the meeting.

Li Fujun pointed out that since the main flood season last year, party committees, governments at all levels and member units of the Drought and Flood Control Headquarters have strengthened work measures, timely forecasts and warnings, and properly handled and responded to minimize disaster losses. This year, the flood control and drought relief situation in our city is still severe. All units at all levels must proceed from an overall perspective and effectively enhance their sense of responsibility and urgency in doing a good job in flood control and drought relief.

Li Fujun emphasized that units at all levels must strengthen their understanding and put prevention first. It is necessary to strengthen the implementation of responsibilities and the investigation of hidden dangers, pay close attention to key areas, key parts and key links, and carry out hidden danger investigation of Kongtong Reservoir and Dongxia Reservoir as well as various reservoirs, hydropower stations, check dams and tailings ponds under construction, so as to achieve Full coverage without missing a beat.

It is necessary to strengthen early warning and monitoring, make full use of the established monitoring and early warning system, comprehensively monitor rain and water regimes, and carry out timely forecasts and early warnings. It is necessary to strengthen discipline and strictly implement the leadership and 24-hour duty system. It is necessary to adhere to the two-pronged approach of flood prevention and drought relief, and formulate practical countermeasures in advance around the safety of drinking water for the masses and drought-resistant agricultural production to ensure that flood prevention and drought relief work achieves effective results. Community Flood Prevention Briefing Part 8

On the afternoon of April 22, XX City Mayor Zhang Yong hosted a video and telephone conference on the city’s flood prevention work to deploy flood prevention and relief work. The main leaders of each county (district), flood control commanders, and main persons in charge of municipal units attended the meeting.

Zhang Yong requested that all localities and departments must be more vigilant, attach great importance to flood prevention work, further enhance the sense of responsibility and urgency, make solid preparations for preventing major floods and rescuing major dangers, and strive to achieve the "five "Ensure" the overall goal of flood prevention.

Zhang Yong emphasized that it is necessary to further implement the flood prevention responsibility system, and those responsible for flood prevention should go deep into the responsible areas and do a good job in supervision and implementation; it is necessary to strictly enforce the discipline of flood prevention work, strictly implement the accountability system, and punish those responsible for poor leadership and work If failure to do so or neglect of duty results in consequences, the relevant responsible persons must be seriously held accountable; safety inspections of reservoirs must be strengthened, various flood prevention measures must be implemented, and dispatch and operation plans must be strictly implemented to ensure that the project can survive the flood safely; sufficient flood prevention materials must be prepared , implement rescue and emergency teams; it is necessary to further strengthen weather forecasting and strive for the initiative in flood control; it is necessary to strengthen monitoring and inspection of areas prone to flash floods and geological disasters. Once an abnormal situation occurs, timely warning and immediate transfer of the threatened people are required to ensure that personnel Life safety; it is necessary to strengthen flood prevention duty, collect and submit all kinds of flood prevention information in a timely manner, and upload and distribute it well to ensure the smooth flow of flood prevention information; in the event of an emergency, the person responsible for flood prevention, the leader at the station, and the leader in charge must rush to the scene as soon as possible , go deep into the front line, command from the front, and handle decisively. Community Flood Control Briefing Part 9

On June 6, our city held a video conference on flood control and drought relief in 2017 to analyze the new situation faced by flood control and drought relief in 2017 and deploy the flood control and drought relief work in 2017.

The meeting pointed out that since the flood season in 2017, the city’s rainfall and water inflows from various rivers have been 10% to 50% less than the same period in previous years. There has been no obvious flooding process in major rivers. It is expected that the main flood season in 2017 (6 From November to September) major rivers such as the Zuojiang River, the main stream of the Mingjiang River, and the Ping'er River are more likely to experience major floods. All departments at all levels must firmly establish risk awareness, calmly face the new situation of flood prevention and drought relief, and effectively improve their emergency response capabilities for flood prevention and disaster relief.

The meeting required that departments at all levels should fully affirm their achievements and enhance their confidence and determination to do a good job in flood control and drought relief; they should firmly establish a sense of coordination and effectively improve their comprehensive coordination capabilities; they should clarify goals, strengthen implementation, and highlight We must do a good job in reservoir safety prevention and control to ensure that the 2017 flood prevention and drought relief tasks are fully completed; we must strengthen publicity and training drills, strengthen publicity and education about mountain torrent geological disasters, and improve people's awareness of disaster prevention and avoidance.

At the meeting, the Municipal Meteorological Bureau and the Municipal Hydrology and Water Resources Bureau made report speeches respectively. Vice Mayor Huang Qinmei attended the meeting. Community Flood Prevention Briefing Part 10

In order to further enhance the flood prevention awareness of residents in low-lying areas and master the escape methods when floods come, on May 4, Xinfeng Street in Wuyishan City carried out a flood control evacuation drill in the low-lying area of ??Shaguzhou Activity.

Shaguzhou is located in a low-lying area next to the Chongyang River. It has 340 households with 1,020 residents. It is of great significance to carry out flood control and evacuation drills, do a good job in flood control, and ensure the safety of the people. At 3 o'clock in the afternoon, as the hand-cranked siren sounded, the street flood control team, Yuqingqiao Community, and Wuli Village cadres quickly entered Shaguzhou to mobilize and organize residents to evacuate the village.

At this time, residents who were washing clothes by the river, playing poker in the village for entertainment, and residents resting at home immediately put down their work and ran out quickly after hearing the sirens; flood control teams and community cadres went from house to house. House-to-house mobilization, some organized residents to evacuate, some helped the elderly, and evacuated residents to designated locations within the specified time.

Through the flood control evacuation drill, the flood control team, staff, and community residents became more familiar with the evacuation routes, improved their self-rescue capabilities, and promoted the implementation of flood control plan measures. The drill achieved the expected results. Community Flood Prevention Briefing 11

The flood season is about to enter. In order to effectively enhance the awareness of teachers and students about flood prevention work, improve the ability to deal with emergencies, cultivate the escape and self-rescue skills of teachers and students, and test the effectiveness of flood prevention plans, 4 On March 18, Shuiling Central School in Xuyong County, Luzhou City conducted a flood prevention emergency evacuation drill.

Before the drill, the school organized all teachers and students to learn the "Flood Prevention Emergency Plan" and emphasized the drill activities. During the drill, all school staff quickly arrived to lead students in an orderly evacuation to prevent crowding and trampling injuries. After arriving at the predetermined "safe zone", students were told to keep quiet and no loud noises were allowed; teachers in each class counted the number of people and the rescued people to see if all were rescued; and reported the drill status of each class to the principal.

Subsequently, the school safety director conducted safety education on flood prevention and flood prevention to all students, allowing teachers and students to have an in-depth understanding of flood escape knowledge, enhancing teachers and students' awareness of flood prevention and flood prevention, and improving the awareness of teachers and students. The ability to escape, self-rescue, and mutual rescue in floods, and the ability to withstand and respond to emergencies.

This drill not only allowed teachers and students to initially master the correct escape and self-rescue methods, but also improved the ability of teachers and students in the school to cope with the flood season, achieving the expected purpose. Community Flood Control Briefing Part 12

The Municipal Traffic Engineering Safety and Quality Supervision Station seized the favorable time before the flood, "early planning, early deployment, early start" to comprehensively strengthen the inspection of flood control safety work of water transportation projects involving rivers and seas.

Among them, the new second-line ship lock project of the Dazhi Hexi Hub recently carried out a flood prevention and typhoon emergency response drill to test the flood prevention safety and emergency response capabilities. The drill subjects are divided into temporary reinforcement and ship evacuation. The drill process is complete, emergency response personnel are in place quickly, organization and command are appropriate, operations are proficient, measures are decisive, and the emergency response tasks for typhoon and flood prevention are completed in a timely and effective manner.

The drill not only trained the team, but also promptly discovered and rectified hidden dangers and loopholes. The Municipal Traffic Engineering Safety and Quality Supervision Station once again emphasized three requirements during the drill: First, further improve the flood prevention and typhoon prevention plan, and Flood prevention materials are in place. The second is to emphasize the 24-hour duty system, the leadership duty system and the flood season information reporting system, and establish an effective working mechanism for typhoon and flood prevention. The third is to strengthen the management of processes with safety risks such as foundation pit excavation and strictly carry out construction in accordance with the approved plan to minimize safety risks. Community Flood Control Briefing 13

Today, due to heavy rainfall, most areas of our county have experienced heavy rainfall. In order to ensure the safety of various reservoirs and protect the safety of people’s lives and property in the jurisdiction, the xx Town Party Committee and Government have paid close attention to Arrangements will be made to promote new methods of flood prevention work to ensure a stable flood season.

In view of the new round of heavy rainfall, which is characterized by heavy rainfall, fierce rainfall, and strong stopping power, xx town adopts timely attention to weather forecasts and strengthens rain and water regime SMS warnings. Once heavy rainfall occurs, , early warning notices and prevention measures will be communicated to each reservoir management staff in the form of text messages and phone calls as soon as possible; secondly, pay attention to patrols and inspections of dikes, pay special attention to the possible occurrence of basin-wide floods, and pay attention to prevention The occurrence of floods and geological disasters, the implementation of reservoir and emergency rescue and disaster relief responsibilities; again, relevant personnel of all departments attach great importance to and take strict precautions. Although the water levels of various reservoirs in xx town are now lower than the flood limit water level and normal water level, the stability of the rivers has a bearing on the overall situation, and the responsibility for flood control is more important than Mount Tai. If there is no lingering rain, take precautions before they happen. , these reservoirs are likely to be in danger, causing disasters and secondary disasters.

At present, xx town is adopting a series of more powerful new measures to ensure that the town can survive the flood safely.