Joke Collection Website - News headlines - Pre-flood safety self-inspection report
Pre-flood safety self-inspection report
Pre-flood safety self-inspection report (selected 9 articles)
Time passes by inadvertently, and a period of work has ended. Looking back on the hard work during this period, there are Defects, let us write a self-examination report seriously together. So, have you mastered the format of the self-examination report? Below is a pre-flood safety self-inspection report that I collected and compiled. I hope it can help everyone.
Pre-flood Safety Self-Inspection Report Part 1
In order to further improve flood prevention work, ensure safe passage through the flood season, protect the lives and property safety of the people in our town, and maintain normal production order , maintain social stability. According to the spirit of the meeting and document requirements of the Municipal Flood Control and Drought Relief Headquarters, our town mainly focuses on four aspects. The self-examination report is now reported as follows:
1. Firmly establish ideas
Floods in recent years have caused considerable economic losses to our town. Therefore, we have established the idea of ??putting people first, building a harmonious society, ensuring the safety of one party, and do a solid job in this year's flood prevention work.
2. Strengthen organizational leadership
In accordance with the requirements of the document, our town has established a leading group for flood control and drought relief. The mayor is the leader, and the deputy mayor and the deputy secretary in charge of agriculture are. The deputy team leader and relevant personnel from the Agricultural Office and Agricultural Service Center are members. They are responsible for flood prevention and control of important reservoirs, mountain ponds, stone river weirs, and dangerous sections of rivers in the jurisdiction. They are responsible for supervising and urging the implementation of relevant units to formulate flood control plans for water conservancy projects. Establish a flood control duty system, form a flood control and rescue team and reserve flood control materials, and be responsible for emergency and disaster relief work within the jurisdiction.
3. Implementation of duty duties
During the flood season, our town implemented flood control and drought relief duty personnel, and clarified the responsibilities of the duty personnel. They insisted on being on duty 24 hours a day and were responsible for collecting information. Report flood and drought conditions.
4. Carry out preliminary safety inspections
After inspection, it was found that firstly, there were pear trees on the reservoir during the anti-reconstruction project in x town; secondly, the culvert in xdang reservoir was blocked due to the construction of the Chongqing-Sui Expressway; Third, the x river weir was blocked due to the construction of the Chongqing-Sui Expressway. No other safety hazards were found.
We are actively dealing with the trees on the reservoirs that are against construction. For the culvert blockage and river blockage caused by the construction of expressways in xdang Reservoir and Shidao Manaozui Shiheyan, it is recommended that the superior departments coordinate and resolve them. . Pre-flood Safety Self-Inspection Report Part 2
According to the requirements of the "XXX River Management Bureau's 20XX Flood Prevention Work Arrangement Opinions" and the "20XX Flood Prevention Target Management Responsibility Letter", fully implement the "Safety first, prevention first" The safety production work policy of "mainly, comprehensive management" has been established, and the awareness of "preventing early floods, preventing major floods, rushing for major risks, and resisting major disasters" has been established. Our company has made various flood prevention preparations in advance and carried out the flood prevention work in 20XX. Comprehensive planning will be carried out to incorporate flood prevention work into key production safety tasks throughout the year. The self-examination and rectification situation is now reported as follows:
1. Comprehensively implement flood prevention work
1. Clarify the goals and responsibilities of flood prevention work and strengthen the sense of responsibility.
Based on the personnel adjustment, the flood control organization structure was adjusted, flood control responsibilities were clarified, personnel responsibilities were implemented, and responsibilities for key flood control areas, important equipment, and important operations were assigned to people. We must earnestly implement the flood prevention policy of "safety first, always be prepared, focus on prevention and make every effort to rescue", and firmly establish the idea of ??"preventing major floods and rescuing major dangers" to attach great importance to flood prevention work, raise awareness and strengthen management. The flood control and flood relief responsibility system has been implemented step by step in accordance with the principle of "leveled responsibility, who is in charge, who is responsible". A flood control and flood relief work system has been formulated in accordance with relevant laws and regulations, and various flood control and flood relief tasks have been divided into positions and individuals, and the system has been compiled and improved in a timely manner. "XX Hydropower Station Flood Control Emergency Plan".
2. Construction of flood control team.
(1) After the flood prevention leading group was established, we quickly studied and deployed and established a flood prevention team. The entire station is an emergency rescue team and is responsible for the safety of the entire station during the flood. Under the unified leadership of the company, we mainly conducted tests on flood control facilities, hydraulic structures, gate opening and closing systems, backup power supplies, etc., and immediately took measures when problems were discovered to solve them before floods occur, so as to nip them in the bud. .
(2) Seriously organize flood control drills to improve the flood control and emergency response capabilities. In order to further improve the flood control awareness and flood response emergency response capabilities of all station employees, test the operability and practicality of our station’s flood control plan, and early Identify problems, solve them, and improve the overall flood prevention and emergency response capabilities of the entire station. From May to June 20XX, a second flood prevention drill was held. The exercise content includes rehearsals for major accidents such as emergency response teams, emergency response to communication failures, emergency response to flood control facility failures, and prevention of flooding of factory buildings. After the on-site exercise, a summary and analysis will be conducted to achieve the expected results.
3. Material implementation.
We strictly follow the requirements of the flood prevention plan and ensure good material reserves. After the notice was issued, we quickly conducted a comprehensive inventory of the flood prevention materials in the entire station, made up for the deficient parts in a timely manner, and replaced the damaged ones.
4. Strengthen inspections of hydraulic structures.
According to the actual situation of this power station, the diversion canal is a high-level channel, and there is a lot of debris in the water in the channel during the flood season. We have formulated a strict project inspection system and inspect each building every two hours during the non-flood season. Once, every hour during the flood season. Clean the sewage rack at the head of the diversion canal and the sewage rack in the front pond from time to time to ensure the safe flow of water in the channel. In order to prevent accidents in which the sewage barrier is seriously silted up and the channel is washed away, our company added an overflow weir in front of the canal head control gate, and in an emergency, the flood will be discharged into the original north main canal through the diversion canal.
2. Main existing problems
1. There are no flood control embankments in the main and auxiliary factory buildings, and there are hidden dangers.
2. The flood prevention and emergency response capabilities of operating personnel need to be improved. In particular, new recruits are limited to being able to operate equipment proficiently, but have poor flood prevention awareness and emergency incident handling abilities. Some operators have weak safety awareness and have a fluke mentality.
3. Main points of the next step
1. Carry out regular inspections of hidden flood hazards.
Strengthen the investigation of hidden dangers and sources of danger, make the investigation of hidden dangers deep and detailed, leave no blind spots, no dead ends, consolidate the effect of rectification, and form a "find the point, trace the connection, and cover the whole area" "Hidden hazard investigation and management mechanism, and continue to promote safe production and flood safety.
2. Strengthen duty management during the flood season to ensure safety and stability during the flood season.
According to the "operation duty" staffing, the duty responsibility during the flood season is assigned to each person. The stationmaster will track the water conditions, adjust the duty mode in a timely manner as required, and reasonably arrange the personnel on duty. During the duty period, the water conditions will be captured, flood dispatched, and External flood reporting and other work should be institutionalized, refined and standardized, equipment and hydraulic structures should be strictly inspected according to conditions, equipment deficiencies should be eliminated in a timely manner, and hidden dangers should be investigated and treated as a means to prevent production risks and natural disasters , to ensure safety during floods.
3. Conduct long-term drills and improve flood prevention plans.
Based on the weather characteristics of the flood season in recent years and the 20XX annual emergency plan drill plan, frequent drills are planned and organized for flooding of factory buildings, factory power outages, dangers in the water diversion system, etc., to further improve employees' ability to respond to emergencies. The response speed and accident handling capabilities of the company should be improved to ensure the efficient operation of the emergency mechanism in extreme situations, effective organizational measures, and the formation of an emergency linkage mechanism with the competent authorities.
4. Further negotiate with the Administration to build flood control embankments for the main and auxiliary power plant buildings. Pre-flood Safety Self-Inspection Report Part 3
According to the Municipal Flood Control and Drought Relief Headquarters’ “Notice on Preparations for Flood Control in 20xx”, our bureau attaches great importance to flood control preparations and divides labor according to the XX County Flood Control and Drought Relief Emergency Plan , Strictly implement the flood prevention work responsibility system, carry out key inspections based on actual conditions, eliminate potential disaster hazards in a timely manner, and ensure that livestock production can survive the flood safely. The flood prevention inspections are summarized as follows.
1. Strengthen leadership and strengthen responsibilities
Bureau leaders attach great importance to the flood prevention and drought relief work in the animal husbandry industry and organized a meeting on the flood prevention and drought relief work in the animal husbandry industry (report on the selection and appointment of county cadres). A flood prevention organization was established with the director as the commander, the deputy director in charge as the deputy commander, and the heads of relevant departments and prevention and control stations as members. The 20xx flood prevention duty implementation list was arranged from June 1 to September 20xx. On the 30th, flood prevention duty was implemented every day. According to the division of responsibilities, preventive and response measures should be refined, and disaster prevention and responsibility implementation should be done well.
2. Strengthen implementation and prevent problems before they occur
(1) Carry out comprehensive flood prevention inspections. In accordance with the goals of "comprehensive inspection, highlighting key points, strengthening responsibilities, and improving measures", unit self-inspections, key unit inspections and comprehensive inspections will be carried out in stages. Large-scale breeding enterprises are required to conduct self-examinations for flood prevention, so as to detect hidden dangers in production early and correct them in a timely manner. The business unit of the bureau and each prevention and control office went to key farms to conduct key inspections. Each prevention and control office organized personnel to conduct a comprehensive survey of each breeding farm to promptly discover and eliminate hidden dangers. The inspection focused on 10 large-scale breeding enterprises, 45 key farms and more than 320 breeding households. 15 unqualified designs were found, and 12 rectification notices were issued, with deadlines for rectification to be completed by the end of May.
(2) Strengthen disaster prevention and reduction guidance and services. The first is to strengthen publicity and guidance, go deep into the breeding farms to carry out propaganda and mobilization, and enhance the awareness of disaster prevention and reduction among the majority of breeding farms. The second is to provide disaster prevention guidance. Go to livestock and poultry farms to inspect livestock and poultry sheds, drainage pipes, etc., urge farmers to carry out renovations and improvements, guide farmers to comprehensively eliminate hidden dangers, and make preparations for disaster prevention. ***Issued 500 convenience service cards, printed more than x copies of promotional materials, and helped farmers eliminate more than 20 hidden dangers.
(3) Strengthen disaster emergency response. Connect with the Meteorological Bureau, strengthen communication, provide timely feedback on disastrous weather, and provide early warning for disastrous weather. Timely transmit weather information to livestock farmers through the "Nongzhengtong" information service platform to minimize the adverse impact of disaster weather on livestock production and the supply of livestock products. Strengthen emergency duties. Once a disaster occurs, quickly activate the emergency plan, promptly grasp the disaster situation, scientifically and objectively assess disaster losses, and report them in a timely manner.
(4) Strengthen the connection between the production and marketing of feed and livestock products. Actively coordinate and assist farmers to reserve forage and feed to avoid feed shortages caused by disasters. Actively coordinate relevant departments to ensure smooth channels for the transfer of forage and feed, the release of livestock and poultry, and the transportation of seedlings to ensure the normal production of farmers.
(5) Strengthen the prevention and control of animal diseases. Strengthen basic prevention and control work such as immunization and disinfection, and pay close attention to the dynamics of animal epidemics in the event of floods to ensure that major animal epidemics do not occur or spread.
(6) Establish a long-term mechanism. Through inspections of the livestock industry's flood prevention work, it was found that some livestock farms still have aging sheds, weak disaster prevention capabilities, and potential disaster safety hazards; some farmers have a weak awareness of disaster prevention, fail to truly recognize the dangers, and have a fluke mentality. Now that we are about to enter the flood season, the next step is to establish a long-term flood prevention mechanism, focus on education and supervision around the problem, urge farmers to make timely corrections, eliminate safety hazards, and ensure that the livestock industry can survive the flood safely. Pre-flood safety self-inspection report Part 4
1. Strictly implement the flood prevention responsibility system. In order to strengthen the leadership of safety work during the flood season, the school established a leadership group for safety work during the flood season. A leadership responsibility system has been established and improved. The school has signed a responsibility letter for flood season safety work goals with each class, clarifying the specific person in charge to ensure nothing goes wrong.
2. According to the requirements of the Municipal Flood Control Headquarters, our school carefully studied the notice requirements and formulated an emergency plan for safety work during the flood season to ensure the safety of students and the stability of the campus.
3. Carry out flood season safety education to teachers and students in a targeted manner to enhance prevention awareness and self-rescue and self-protection capabilities. Students are required not to play in dangerous areas such as rivers, reservoirs, and low-lying areas to prevent problems before they occur. Our school is far away from Mihe River and reservoir, but we cannot be careless.
4. The school established a school flood season flood prevention and disaster relief emergency leadership group with principal He Shujun as the leader, Ji Yanliang as the deputy leader, and all class teachers as members. The Flood Situation Command and Publicity Liaison Group, headed by He Shujun and Ji Yanliang, is responsible for and coordinating the school's flood prevention work.
Li Daogong, Wang Xishun, and Su Yanzhen formed a flood prevention and disaster relief emergency rescue team to cooperate with the class teacher in doing a good job of student work and management. The logistics support team, headed by Ji Aifang, Zhang Qinghua, and Chen Guoming, carefully carried out various sanitation, disinfection and disease prevention work.
In short, flood prevention inspection is a serious work involving the safety of life and property. Our school carefully organizes and carries out flood prevention inspection work. The relevant responsible persons must pay close attention to the management and work together to ensure that all aspects are carried out. Implementation of preventive measures Pre-flood safety self-inspection report Part 5
According to the spiritual requirements of Weishuifa (2012) No. 185 document.
Our station immediately held a meeting, in accordance with the policy of "safety first, prevention first", combined with reality, highlighted key points, conscientiously implemented the spirit of the document, carefully arranged the deployment, and formulated an action plan. The self-examination situation is now reported as follows: p>
1. Self-examination time
It starts on April 16 and ends on April 20.
2. Self-examination method
Each group and factory order shall conduct self-examination first, and report the self-inspection results. The management station is led by the deputy station director in charge of safety, and is composed of the management station office, engineering team, dam surface, and aqueduct directors. Conduct another comprehensive inspection of the reservoir's safety self-inspection. And report the inspection status to the station committee in a timely manner.
3. Self-inspection scope and content
The scope of self-inspection includes four parts: reservoir operation and management, water supply safety, channel transformation and daily management of management stations. Self-inspection is adopted first and then unified inspection at the station. way.
1. Reservoir operation management, an in-depth and detailed safety inspection was conducted on a reservoir under management, rat holes and ant nests were removed, dam abutments were repaired and maintained, and drainage facilities such as spillways and drainage channels were dredged and renovated. and the surrounding mountains were comprehensively inspected to eliminate hidden dangers and ensure that the reservoir operates normally and can survive the flood safely.
Make arrangements for flood prevention duties, allocate emergency supplies and form rescue teams in advance. It is necessary to ensure that the road on the embankment top within the river course is smooth, ensure smooth traffic during the flood season, and ensure that flood control materials and flood control rescue personnel can be quickly transported to designated locations during the flood season.
Reservoir management personnel adhere to the duty patrol system, pay special attention to the safety of tourists, refresh warning slogans, and require supervisors to follow them during the flood season.
2. Water supply safety. Xiangcun Water Plant conducted a comprehensive inspection, maintenance, replacement and disinfection of the pressure regulating tank safety manhole cover, gate valve well, machine room, etc., effectively strengthened water source management, and resolutely put an end to all kinds of pollution. Eliminate all unsafe factors, ensure the safety of water supply water quality, take precautions in place, and achieve safe production and safe water supply.
3. Channel renovation, actively organize dredging, and strive to complete the channel repair project during the main flood season.
4. Daily management of the management station. Each group will conduct thorough inspection and maintenance of vehicles and motorcycles. It is strictly prohibited to use sick vehicles or dangerous vehicles, and it is strictly prohibited for drivers to drive under the influence of alcohol or fatigue. When driving, the office must dispatch a vehicle and drive safely. The guard system is sound, and the work and rest system is strictly implemented, as well as the registration system for outsiders.
4. Existing problems
During the self-examination activities, each group can put safety work in an important position, whether from safety awareness or safe production operations and the implementation of measures are relatively complete. However, there are still two main problems in the following two aspects:
1. Employees’ safety awareness is not strong.
Some employees do not pay enough attention to safety, have confused thoughts, and have weak safety awareness. They ignore safety precautions, protective facilities, and equipment, and treat safety in a perfunctory manner.
2. Safety responsibilities are not implemented in place.
During the inspection process, each group was able to operate in a standardized manner in accordance with relevant regulations such as the Production Safety Law, Production Safety Management System, and Accident Emergency Response and Handling System. However, there are still unclear safety responsibilities, tasks are not quantified and broken down and implemented by people, the responsibility system is not fully developed, and there is no safety responsibility letter signed.
5. Corrective measures
The above existing problems are affected by objective factors, but the main reason is that the work responsibilities are not true, resulting in passive work. In view of existing problems:
First, strictly implement the safety responsibility system. According to the investigation results, each group has assigned people the responsibility for safety work and assigned dedicated personnel to key positions. They strictly abide by the duty system, strengthen shift handover management, and keep duty records. To ensure safety from top to bottom, everyone has a responsibility.
The second is to thoroughly study and implement the "Safety Production Law" and "Shaanxi Province Safety Production Regulations". It is necessary to integrate theory with practice, find the reasons deep in the mind, standardize the safety behavior of employees themselves, and enhance the consciousness of obeying rules and disciplines. Promote the smooth development of various water conservancy project construction and daily work.
In short, in the future work, we will strictly follow the relevant requirements of our superiors and ensure the safe operation of all tasks through everyone's joint efforts. We will carefully learn from the experience and education in previous work and summarize the rules. , improve measures, guard against arrogance and impetuosity, and continue to do a good job in water conservancy safety management.
Pre-flood safety self-inspection report Part 6
The XXX Township Party Committee and Government held a meeting and clarified the importance and division of responsibilities of flood control during the flood season, and conducted an inspection to conduct an inspection of the township's water conservancy project facilities and residents of flash flood disaster spots in unobstructed rivers. The implementation status is now reported as follows:
1. Implement various flood prevention responsibility systems.
In order to effectively strengthen the leadership of flood prevention and flood prevention work in XXX Township, after discussion and research by the township party committee and government, a command group for flood prevention and geological disaster prevention in XXX Township was established. The township chief Huang Haihui is the commander-in-chief and all relevant departments are in charge. The leader serves as the deputy commander, and the heads of relevant units are members. There are offices under it, and the responsible persons of each village have been clarified. The responsibility system has been further implemented, and various flood prevention responsibility systems with the administrative head responsibility system as the main content have been strictly implemented. In order to further understand the disaster situation in each village, the township head led relevant personnel to conduct a comprehensive inspection of each village, listened to the situation reports of each village cadre, visited the hidden danger site in person, and arranged command work.
2. Improve the implementation of flood control plans and flood prevention plans
Before the arrival of the flood season, the village leaders led relevant staff to conduct comprehensive inspections in each village group, especially for potential safety hazards A comprehensive inspection was conducted and any potential safety hazards were recorded. Through further investigation and combined with the characteristics of flood control and geological disaster prevention work, the "XXX Township 2018 Flood Control and Geological Disaster Prevention Plan" was revised and improved. Detailed regulations have been made on the distribution of flood prevention and rescue teams in the township, emergency response, danger reporting, and allocation of flood prevention team members. The inspection of personnel evacuation, material transportation, rescue routes and dangerous sections, and the handling of dangerous situations were clearly explained.
3. Emphasis on strengthening the work responsibilities of on-duty personnel
Strengthen on-duty management and report disaster situations in a timely manner. Properly formulate a duty schedule for flood prevention and geological disaster prevention. A team member will lead the shift every day, and the on-duty staff will turn on the phone 24 hours a day to ensure smooth communication. The duty room is staffed 24 hours a day. The township government strengthens inspections of hidden dangers through telephone inquiries or on-site inspections, and reports them immediately once hidden information is discovered.
IV. Implementation of flood control and emergency rescue materials and rescue teams
In accordance with the county’s notice on flood control, flood control, and geological disaster prevention, XXX Township fully implemented the equipment needed for flood control and flood control, and arranged reserves Flood prevention sandbags, wooden stakes, iron bars, safety helmets, flood prevention clothing, etc. The specific quality and quantity of equipment in each village were further clarified, and dedicated personnel were arranged for safekeeping. In order to strengthen the construction of professional rescue and disaster relief teams, the XXX Township Flood Control Office re-verified the rosters of each flood control team. The XXX Township Flood Control Command Group consists of 4 working groups for information monitoring, transfer, dispatching and support and 1 emergency rescue team. Each administrative village has established a flash flood disaster prevention working group with the village director as the responsible person. At the same time, each village established an emergency rescue team (each team has no less than 20 people) with militia as the main body.
XXX Township, in accordance with the arrangements, deployments and requirements of the province, city and county on flood prevention and geological disaster prevention, and in light of the actual situation, conscientiously implements the leadership’s instructions, studies in a timely manner, strengthens measures, implements responsibilities, and solidly and Advance in an orderly and steady manner, comprehensively complete flood control and geological disaster prevention work, and make every effort to safeguard the safety of people's lives and property. Pre-flood Safety Self-Inspection Report Part 7
In accordance with the requirements of the document, the Urban Management and Administrative Law Enforcement Bureau conscientiously carried out the investigation of flood prevention safety hazards in the system. The specific situation is reported as follows:
1. Formulation work Responsibilities for the implementation of the plan
Formulate the "Urban Management Law Enforcement Bureau Flood Prevention Self-Inspection Work Plan" to clarify the investigation scope, inspection content and work requirements of all grassroots units, implement work responsibilities, and conduct self-examination and rectification according to the relevant inspection contents , put forward emergency treatment opinions or rectification plans for various problems discovered during the inspection that affect safe flood weathering, and resolve them within a time limit.
2. Carefully carry out inspections and maintenance of drainage and waterlogging prevention facilities before floods
Conduct detailed inspections of key flood prevention facilities, and solve problems in a timely manner if problems are found.
First, conduct inspections of bridges, ramps, low-lying road sections, drainage pump stations, drainage pipelines and other municipal drainage facilities in the urban area, carry out comprehensive dredging, dredging and maintenance, and install open drainage pumps in low-lying road sections. Ensure smooth drainage during flood season.
The second is to conduct safety inspections on power distribution facilities such as street lights and control boxes around road sections prone to water accumulation to prevent leakage accidents when water accumulates. The third is to conduct inspections on urban embankment and culvert gates, debug and maintain gates, and ensure normal operation during flood seasons. The fourth is to conduct inspections of various rainwater wells and inspection wells in the city and promptly clean them, maintain them, and repair them. The fifth is to conduct key inspections of areas prone to waterlogging in urban areas and study and formulate solutions and emergency measures. The sixth is to conduct inspections of landfills and park scenic spots to ensure normal operation during the flood season.
3. Do a good job in emergency rescue preparations for urban waterlogging
Refine various flood prevention plans and pay attention to "technical prevention". The Municipal Facilities Management Center conducts inspections of major drainage gates in urban areas and areas prone to floods. Install surveillance cameras at waterlogging locations to provide real-time monitoring.
4. Prepare adequate reserves of flood prevention materials during the flood season.
The Urban Management Administrative Law Enforcement Bureau system plans to reserve 30,000 woven bags, 5 tons of iron wire, 210 life jackets, 10 generators, 59 water pumps, and 38 various emergency vehicles during the flood season. In order to ensure that emergency and disaster relief work is carried out as soon as possible during the flood season, an emergency rescue team of 210 people was established.
5. Strengthen the linkage mechanism for flood prevention duty work
After entering the flood season, the Urban Management and Administrative Law Enforcement Bureau will implement a 24-hour duty and leadership system. At the same time, it will strengthen cooperation with the meteorological department and the municipal government. The Flood Control Headquarters shall always pay attention to the weather situation and weather forecasts for communication. In the event of severe weather or danger, they will immediately activate the emergency plan, make every effort to organize flood prevention and drainage, and report to the Municipal Flood Control Headquarters in a timely manner.
6. Actively promote the construction of urban drainage and flood prevention and make up for shortcomings
1. Actively apply for funds, promote the construction of rainwater pumping stations, and improve urban drainage and flood prevention capabilities. The total investment in the rainwater pumping station is 21.19 million yuan, and 10.98 million yuan of funding has been applied for. The project will be completed before the end of the year.
2. Carry out a census of urban pipe networks to comprehensively understand the current status of urban drainage pipe networks and improve urban drainage and flood prevention capabilities.
7. Main existing problems and corrective measures
1. An investigation by the Municipal Facilities Maintenance and Management Center found that 2 locations are prone to waterlogging during the flood season. For these two locations, the Urban Management Law Enforcement Bureau will take emergency measures to supervise the two locations during the flood season, draw warning lines, open manhole covers, and speed up drainage. At the same time, a rectification plan was formulated and completed within a deadline. The waterlogging point near Nanhu No. 1 on Kangmei Avenue will be solved after the planned pipeline laying on Xinglong Street is completed at the end of 2020. The waterlogging point at the intersection of Huifa Road and Renmin Street will be solved after the construction of the pumping station is completed at the end of 20xx.
2. The inspection of the scenic spot found that the South Main Canal is located on the south side and carries the flood pressure of most areas upstream. Currently, the main canal is partially blocked, and there is a risk of flood backflow during the flood season, polluting the water quality in the lake. Since the main canal is not within the scope of management, the municipal government needs to coordinate with relevant departments to deal with it in a timely manner. Pre-flood safety self-inspection report Part 8
According to the spirit of the superiors and the actual situation of our township with high mountains, steep slopes and many rivers, we made early arrangements and started early to conduct a careful analysis of the flood control situation in the township in a timely manner. Take a number of measures to prepare for floods and ensure that the flood season lasts.
The pre-flood emergency preparedness report is now as follows:
1. Before the arrival of the flood season, the township government organized staff to conduct a strict investigation of potential flood prevention safety hazards in the entire township, focusing on xxx Reservoir, xxx power station, xxx, etc., formulated the "20xx Flood Control and Rescue Work Plan for Qianjin Township Flood Season", established a flood control headquarters with the party committee secretary as the commander, team members as deputy commanders, and relevant departments as members, and clarified work responsibilities , implement the staff and do a good job in system protection. Relevant units such as communications, power supply, and public security also worked closely together based on their respective actual conditions to do a good job in the inspection and maintenance of communication and power supply lines, and provided logistical support for flood prevention.
2. Establish a flood prevention and on-duty inspection system for township agencies, implement 24-hour duty, carry out night inspections in key areas, and report problems promptly for processing.
3. Establish and organize flood prevention rescue teams and reserve teams to provide personnel support for flood prevention work. For the three key flood control areas of xxx Reservoir, xxx Power Station and xxx in the township, we have respectively established rescue teams and reserve teams composed of basic militiamen. At the same time, each village has also established a rescue team composed of 20-30 people to ensure the safety of the village during the flood season.
4. In response to the flood control situation, we have prepared some flood control materials (rocks, sand, woven bags, shovels, iron wires, wooden stakes, etc.). In the next step, we will intensify publicity on flood prevention, strengthen on-duty inspections, conduct timely inspections of hidden danger points during the flood season, and eliminate hidden dangers. At the same time, we will pay close attention to water conditions, rain conditions, and the operation of key parts such as reservoirs. If there are any problems Report and handle in a timely manner to ensure that the entire township spends the flood season safely and without any risk. Pre-flood safety self-inspection report Part 9
In order to further improve flood prevention work, ensure safe passage through the flood season, protect the lives and property safety of the people in our town, maintain normal production order, and maintain social stability. According to the spirit of the meeting and document requirements of the Municipal Flood Control and Drought Relief Headquarters, our town mainly focuses on four aspects. The self-examination report is now reported as follows:
1. Firmly establish ideas
Floods in recent years have caused considerable economic losses to our town. Therefore, we have established the idea of ??putting people first, building a harmonious society, ensuring the safety of one party, and do a solid job in this year's flood prevention work.
2. Strengthen organizational leadership
According to the requirements of the document, our town has established a leading group for flood control and drought relief. The mayor is the leader, and the deputy mayor and deputy secretary of the agriculture department are. The deputy team leader and relevant personnel from the Agricultural Office and Agricultural Service Center are members. They are responsible for flood prevention and control of important reservoirs, mountain ponds, stone river weirs, and dangerous sections of rivers in the jurisdiction, and are responsible for supervising the implementation of relevant units. Formulate flood control plans for water conservancy projects, establish a flood control duty system, form a flood control and rescue team, and reserve flood control materials, and be responsible for emergency and disaster relief work within the jurisdiction.
3. Implementation of duty duties
During the flood season, our town implemented flood control and drought relief duty personnel, and clarified the responsibilities of the duty personnel. They insisted on being on duty 24 hours a day and were responsible for collecting information. Report flood and drought conditions.
4. Carry out preliminary safety inspections
After inspection, it was found that firstly, there were pear trees on the reservoir during the construction of Dalu Town; secondly, the culvert in Yanwodang Reservoir was blocked due to the construction of Yusui Expressway; Third, the Shihe Weir in Ma Naozui, Shidao, was blocked due to the construction of the Chongqing-Sui Expressway. No other safety hazards were found.
We are actively dealing with the trees on the reservoirs that were built against construction. For the culvert blockage and river blockage caused by highway construction in Yanwotang Reservoir and Shidao Manaozui Shiheyan, it is recommended that the superior departments coordinate and solve the problem. . ;
- Previous article:Sales inspirational positive energy classic short sentences
- Next article:Child-friendly slogans
- Related articles
- Silkworm rearing diary
- What does Audi's ABT mean?
- Why do I feel dizzy and chest tight after soaking in hot springs for a long time?
- Service-oriented natural gas couplet slogan
- Tourists jumped over the guardrail and lost their lives in order to pick up their mobile phones. Who do you think is responsible?
- What are the interesting attractions in Wanning, Hainan? Travel guide: recommend must-see attractions
- Black-necked crane protection slogan
- 25 sentences describing the appearance of crocodiles
- When should I put the oil bag of rattan pepper beef noodles?
- How to write invitation template for wedding invitation