What are the acceptance criteria for industrial plants?

Now there are more and more individual bosses and more factories are built. After the general factory is built, we all have a little knowledge about the acceptance criteria. Knowing the acceptance criteria, we can put the factory into use as soon as possible.

In the unit project, as long as it meets the completion requirements, it can be completed and accepted by stages. Independent completion acceptance can only be carried out after the completion of the project that has independently signed the construction contract. After understanding the acceptance standards and procedures of industrial plants, the following steps are essential for the preparation of final acceptance when the industrial plants are completed and accepted. This is stipulated in the acceptance standard for industrial plants.

Before the acceptance, the construction unit shall conduct a comprehensive inspection of the plant itself and make the finishing touches.

First of all, there are three acceptance conditions in the acceptance standard of industrial workshop. One is unit engineering and professional engineering, including civil engineering, pipeline engineering, civil air defense engineering and installation engineering. First of all, the contents of these projects are indispensable, and they are constructed according to the design drawing specifications, and the actual dimensions are consistent with the drawing dimensions at the time of acceptance. Secondly, the project quality should meet the requirements in the project contract, and the acceptance should be carried out in accordance with the design drawings, acceptance specifications and technical specifications. The second case is the acceptance of a single project, and the third case is the overall acceptance of the project.

In the process of construction, professional librarians are appointed to sort out and keep all the materials involved in the project, which are needed for the completion and acceptance of each project.

After completion, the construction unit shall submit the application report for construction acceptance, and the supervision engineer shall check and accept them one by one according to the contract and the acceptance standard of industrial workshop, and conduct pre-acceptance. If quality problems are found, the construction unit shall be informed, and the construction unit shall repair or rework according to the acceptance criteria. After the supervision engineer has no problem, he will conduct formal construction acceptance with the owner, construction unit and design unit.

In fact, the acceptance standard of industrial workshop is similar to the basic process of ordinary residential acceptance standard, and it is also used after acceptance to reduce future troubles.