Joke Collection Website - Mood Talk - Something unexpected always happens. Kaka's diary of mud and wood engineering decoration
Something unexpected always happens. Kaka's diary of mud and wood engineering decoration
House information: 8 1_
Decoration style: IKEA Nordic
Decoration method: clear package
Residential area: rural area of Guantai City
Progress of renovation: Mud-wood project
20 15 July
Unconsciously, I entered the mud stage. When the master called me this morning, I realized that waterproofing was done yesterday. Today, I began to paste bricks. Let me go over and tell the masons how to paste them.
The tiles finally appeared. In view of too many colors and styles, I'd better arrange them for the master. They look good on the ground and should be special.
In the afternoon, the bathroom door was also installed, and the position of the remaining sink was measured, which was wider than I planned. Maybe the plan of adding a high cabinet will come true.
The tiles I worked so hard to buy online were rejected by the master, saying that they were inferior tiles that no one wanted, and the cutting was uneven, so I had to use clips to leave seams. In short, all kinds of tiles are not easy to paste, which is labor-consuming and time-consuming, and it costs more money! Salary 16 yuan per square meter, which was originally 35 yuan per square meter, is now 5 1 yuan per square meter!
20 15 July 18
I have been there frequently these days, and the rhythm of going to inspect twice a day is all because I started to paste tiles, which is a highlight of the whole house and I am afraid of problems. Seeing the completion bit by bit, the effect is the same as I imagined, and I am very satisfied. The kitchen tiles are finished, and I am looking forward to the tile effect of the bathroom.
2065438+July 22, 2005
Aluminum alloy doors and windows have been installed, the kitchen wall and life balcony have been completed, and the bathroom is in progress. The tile effect is great!
July 26, 1965 438+05
Early in the morning, I made a detour to a super nostalgic building materials market in the mountains, where almost all the shops were closed and I bought two threshold stones. The market price is really cheap, and it only costs 86 yuan.
I found some flaws in the kitchen door leading to life balcony. First of all, the door is installed askew, which will lead to the cabinet being askew. The upper and lower thickness of the door against the wall is different, which will lead to the different caulking width. Then, the joint between the tile and the door is slightly larger, so it will not look good if it is not filled, and it will not open if the window is filled, and the mood is depressed.
July 27, 1965 438+05
I ran to the mountains to retrieve the threshold stone and successfully paved the kitchen and bathroom floors. Master stopped for two or three days, and then I came back to continue.
Now I can basically see the overall effect, and I am very satisfied with my current design!
August 2, 2065 438+05
Brick sticking has been completed, and it has entered the final sewing stage, which is expected to be completed tomorrow. Mom and dad buried several coins at the entrance, which means making money and treasure.
Yesterday, when the master called me and said that there were not enough black tiles, I began to have a bad feeling. Sure enough, life balcony posted it wrong, and I also blame myself for poor communication. Master thought that life balcony's black and white tiles were the same as the kitchen. In fact, I wanted pure white tiles, but he had already put up several rows, so it was very troublesome to pry them down. Master looked reluctant again, and I was most afraid of disturbing others, so I changed my plan temporarily and made black brick scattered on the balcony of life.
August 3, 1965 438+05
After the acceptance of tiling is completed, the crooked door is a permanent pain. If I had known that the smoke pipe next to the kitchen tile was so wide, I would have pasted the tile, which is another great pity. Try pasting an artistic wallpaper, or hanging kitchen utensils all over the wall to make up for it.
2015 September 2006
Because I stopped traveling for a month, when I came back to see it, I accidentally found that the glass of aluminum alloy doors and windows was installed, the heightened railings were also installed, and the anti-theft net was also installed. The master still insisted on the consistent style of coming without a trace.
I went to the shopping center during the trip and got a lot of inspiration. I took thousands of photos and studied them carefully for a few days before I decided to start carpentry.
After simple communication with carpenters yesterday, I began to enter the woodworking stage today. What I mainly do is N sets of hanging cabinets, the ceiling of the living room and two partitions. The cloakroom door was originally intended to be made, but the master said it was difficult to make, and the price was high, about 2500 to 3000 yuan, and it might not achieve the desired effect, so he hesitated again.
Today, I made an appointment to measure the cupboard and the whole wardrobe to see if the whole wardrobe can make that door.
2015 September 2007
Woodworking officially started, and you can already see the effect in a short time in the morning, which is not generally fast!
The cupboard and wardrobe have been measured, and the carpenter suggested that the wardrobe can be made into circular edges, which can be used as sliding doors to solve the problem of cloakroom doors.
2015 September 2007
I'm really going crazy! The ceiling can be made like this. There are three steps on the ceiling, and the difference between each step is less than 10 cm. Can't it be leveled? Even if I say that the upper limit should not be too low, we should actually deal with the actual situation. I have no experience. I didn't expect this to happen. When you do it, shouldn't you ask me if I am in such a situation? I just know how to do it in a hurry, regardless of whether it is appropriate or not! I don't want to look at the three beams on the ceiling every day for the rest of my life, even if I have to pay more, I have to do it again!
2015 September 2007
Woodworking is not smooth at all, and there are often problems. I only know that I am in a hurry and don't think about whether it is suitable or not!
At home last night, I thought about the number of cabinets. There is one layer, two layers and three layers. I am going to tell the carpenter this morning. Who knew that when I went there, I saw that two sets of hanging cabinets were ready. Give me two floors and I won't change one.
Next, I found that the edge of a group of hanging cabinets exceeded the window and it was impossible to install curtains. I set the size at that time, but I didn't consider the curtain problem. Found a problem at noon, the carpenter went to eat. In the afternoon, I saw that it had been installed. This speed is too fast. Either remove the hanging cabinet or change it into a casement window. In both cases, carpentry needs an extra 65,438+000 yuan. I can't help it I have to add money to correct my mistake!
And that damn ceiling problem, it pisses me off! It seems that it will fall into the hands of carpenters! Increase the money, increase the money! Change it! Change it!
2015 September 2008
After adding two square meters of materials, the ceiling was finally leveled, and the protruding part of the balcony was also leveled, which looked much more pleasing to the eye and wasted hundreds.
The master of aluminum alloy doors and windows also came to collect money, a ***3800, MINUS 500 doors and windows he recycled, and actually paid 3300.
2015 September 2009
The woodwork racks in the workbench and dining room are basically finished, and it feels good, which is the effect I want.
After reading it all morning, I found the problem again:
1, the balcony or three walls are all painted black, which will appear as a whole;
2. It would be nice if the corridor leading to the bathroom was 10 cm wide, and it would be just right to install Janice shoe cabinets on it. However, it seems that the current size will be narrower if installed, and it is a pity to make another plan;
3. The black wall of the entrance was originally planned to install a 40 cm wide mirror, next to which was a Johnny shoe cabinet with a width of 5 1 cm. Now the plan is ruined. The width there is only 90, and these two things simply can't hold. We must come up with another plan.
4. It's still the door wall. The plan to make a blackboard wall is very design-oriented, but the reality is that the light there is already very poor. Will it look darker if it is painted black? Ah, ah, ah, what should I do?
20 15 September 10
The beautiful tiles in the kitchen are ruthlessly covered, and the biggest problem in the whole house is two particularly dark corners-the kitchen and the dining room. However, there is no way. Due to the limitation of apartment type, this is the most suitable one among hundreds of schemes I have thought about. In the future, only lights can set off their beauty.
Virgo's character appears again, and my idea is uncertain. The booth in the restaurant was originally planned to be 40 wide, but later I decided to make it 37 wide. It feels a little narrow after making it 37, or should it be made 40? I regret it! This has happened several times, and I hate myself.
The gap between reality and ideal in the foyer has widened again. Still continue to modify the original design! Woodworking stage is the most common problem in the whole decoration process, but I still blame myself. I have no experience, no concept of size, and I have not considered it carefully enough, leaving a lot of regrets. Now I can only find the picture modification from the soft clothes, hoping that the regret can be made up.
20 15 September
The cupboard doors are all installed, so I asked the master to help me make two small benches and three decorative cells with extra materials. It's a little regrettable that the woodworking part is over. Although it was only five days, I don't know how many brain cells died.
More exciting reading recommendations:
50,000 pretending to be 100, sharing the diary of the long road to transformation.
Ways to save money for small apartment decoration with such high housing prices
It's no loss to sign a half-package contract like this.
Pick up something about the zodiac and decorations.
Uncovering the True Face of Lushan Mountain/Interpretation of decoration style of KLOC-0/9
Decoration literacy 16 takes you into the world of decoration.
Thirty-six tricks of home improvement scam make unscrupulous people tremble with fear.
- Related articles
- Describe diarrhea, talk about diarrhea and talk about 30 sentences.
- I hope to have a better sentence mood in the future.
- Heart-breaking emotional phrases in the circle of friends: No matter how you say goodbye, you are still sorry for the first time you met.
- What are the short literary sentences about mountains and seas?
- If your parents are the people who hurt you the most, how will you treat them when they are old?
- Advantages and disadvantages of women drinking milk powder
- What are the differences and advantages between flat knife machine and circular knife machine? Can someone talk about it?
- Ke Ling 06 charging pile instructions.
- Sentences of lovers eating together
- I may not be at home when I talk about pursuing Happyness.