What procedures do you need to go through in engineering construction?

Engineering construction needs to go through the procedures of planning scheme approval, construction drawing design review, application for construction project planning permit, bidding and handling construction permit. Applicants need to prepare corresponding materials in advance according to specific conditions.

In view of the project construction, relevant departments will carry out examination and approval, licensing and acceptance according to the requirements of relevant laws, regulations and rules to ensure the quality and safety of the project construction. The following is the main procedure of engineering construction: 1. Examination and approval of planning scheme: before the construction project starts, the planning scheme should be put forward and approved according to the relevant requirements of urban planning. The contents of examination and approval include the nature and site selection of the project land. A formal feasibility study report can only be prepared after the planning scheme is approved. 2. Review of construction drawing design: Construction drawings must be compiled in accordance with national and industry standards, and reviewed by design units with professional qualifications. The purpose of construction drawing design review is to check whether the scheme design conforms to the relevant national and local regulations. 3. Apply for a construction project planning permit: After the above steps are completed, you need to apply for a construction project planning permit. This certification document is the result of the comprehensive review of the construction project by the examination and approval authority and an important basis for carrying out construction activities. 4. Bidding: If the construction project needs to be outsourced, it needs to be invited by public bidding, and the winning bidder shall be determined in accordance with relevant regulations. 5. Handling of construction permit: To determine the winning bidder after bidding, it is necessary to apply to the construction permit examination and approval authority, and provide relevant materials, such as bid-winning notice, performance commitment letter, etc.

Are the procedures required for project construction the same in every province? Not exactly the same. Although all provinces, autonomous regions and municipalities directly under the Central Government have corresponding regulations on the management of the construction field, the implementation rules are different according to local conditions and projects. Therefore, in terms of specific procedures, it is necessary to combine the actual situation and local laws and regulations to complete the relevant procedures one by one.

In the process of engineering construction, every link should abide by laws, regulations and standards to ensure the quality and safety of engineering construction and improve the sustainable development level of engineering construction. When going through the formalities of planning scheme approval, construction drawing design review, application for construction project planning permit, bidding and construction permit handling, etc. Matters needing attention must be clearly understood in advance and all kinds of preparations must be in place.

Legal basis:

Article 2 of the Measures for the Administration of building construction permits, a construction unit engaged in the construction of various houses and their ancillary facilities, decoration, installation of supporting lines, pipelines and equipment, and the construction of urban municipal infrastructure projects within the territory of People's Republic of China (PRC) shall, in accordance with the provisions of these Measures, apply to the competent department of housing and urban construction of the local people's government at or above the county level (hereinafter referred to as the issuing authority) where the project is located. A construction project with an investment of less than 300,000 yuan or a construction area of less than 300 square meters may not require a construction permit. The competent department of housing and urban construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government may adjust the quota according to the local actual situation and report it to the competent department of housing and urban construction of the State Council for the record. According to the authority and procedures stipulated by the State Council, the construction project that has approved the commencement report will no longer receive the construction permit. Article 3 A construction project that should apply for a construction permit as stipulated in these Measures shall not be started without obtaining a construction permit. No unit or individual may break down the projects that should apply for construction permits into projects below a certain limit to avoid applying for construction permits.