Tower crane is the most widely used vertical transportation machinery in the past, so the normal operation of tower crane has become an important part of safe construction in the construction stage. According to the principle of "whoever constructs is responsible", the general contractor is naturally responsible for the safe use of the tower crane, and undertakes the safety responsibility for the installation, use, maintenance and disassembly of the tower crane. Please read down for details.

Keywords: tower crane safety, supervision responsibilities

Tower crane is the most widely used vertical transportation machinery in the past, so the normal operation of tower crane has become an important part of safe construction in the construction stage. According to the principle of "whoever constructs is responsible", the general contractor is naturally responsible for the safe use of the tower crane, and undertakes the safety responsibility for the installation, use, maintenance and disassembly of the tower crane. What role does the supervision engineer play in the safety management of tower crane during construction? What is the responsibility? There are different opinions so far. Some people think that the supervisor should supervise the tower crane like a management project, while others think that it should not: some local safety supervision departments require the supervisor to be responsible for the quality of the tower crane foundation. However, most supervision engineers think that the supervisor is only responsible for supervising the quality of the project itself, not for the basic quality of the tower crane, and refuses to sign the basic quality of the tower crane; Some safety supervision departments therefore do not issue licenses. As a result, a large number of tower cranes run without a license, but they leave hidden dangers artificially. Therefore, it is necessary to have a unified understanding of the quality and safety management of tower cranes, clarify responsibilities, standardize management and eliminate blind spots. This paper presents some simple views for the reference of peers and relevant departments.

1, the supervisor does not need to undertake the supervision responsibility for the manufacturing and installation quality of the tower crane, mainly because:

1. 1 There is no provision in this respect in laws and regulations.

The Construction Law of People's Republic of China (PRC), Regulations on Quality Management of Construction Projects, Law on Safety in Production of People's Republic of China (PRC), Regulations on Safety in Production of Construction Projects and Regulations on Safety Supervision and Management of Construction Lifting Equipment of Jiangsu Province have not included the manufacturing and installation quality of construction machinery including tower cranes in the scope of project supervision.

1.2 requires the supervisor to be responsible for the quality of the tower crane, which lacks the contract basis.

According to the contract entrusted by the supervisor, the supervisor's responsibility scope is only responsible for supervising the quality of the project itself, excluding the quality of the temporary facilities, construction machinery and transportation equipment of the construction unit.

1.3 The construction quality of tower crane foundation does not belong to the scope of process inspection and concealed engineering acceptance, nor does it belong to the scope of engineering quality inspection, but belongs to the self-inspection scope of the construction unit.

1.4 Insufficient technical foundation

(1) The installation position of tower crane is generally outside the main plane of the project, that is, outside the scope of geological exploration drilling, and the supervision lacks the basis for judging the bearing capacity of tower crane foundation. The basic inspection of the engineering ontology is judged by the engineering survey and design, so the basic geological conditions of the tower crane cannot be decided by the supervisor.

(2) The strength of foundation concrete required by the manufacturer/manufacturer of tower crane is C ... ~ C. However, Article 4.4.2 of Technical Specification for Safety of Construction Machinery (JGGJ33-2001) stipulates that the concrete strength grade of tower crane should not be lower than C35, and the foundation made by the construction unit according to the instruction obviously does not meet the safety requirements. How can the supervisor just sign it?

(3) Because the construction unit knows that the tower crane does not enter the supervision and acceptance procedure, and does not check the tower crane foundation according to the working procedure like the project, the tower body is often installed when the foundation concrete strength does not reach more than 75% of the design strength, and it is not recognized by the supervision. This situation is very common on the construction site, and it is difficult for the security department to insist that the supervisor recognize the foundation quality afterwards.

1.5 Like pile drivers, excavators, mixers and other construction machinery, tower cranes belong to the same kind of construction machinery, and their manufacturing and installation quality does not need supervision.

2, supervision in tower crane safety responsibilities.

The above statement that the supervisor is not responsible for the manufacturing and installation quality of tower cranes does not mean that the supervisor is indifferent to the safety production of tower cranes, but should do the following work and fully perform his duties.

2. 1 When reviewing the construction organization design, it is necessary to review whether the location of the tower crane on the construction layout is reasonable, and whether there are high-voltage lines or passages for non-construction personnel within the operation scope of the tower crane; If yes, the construction unit is required to set up protective measures, and the single construction plan will be implemented after approval.

2.2 Review the safety measures for the use of tower cranes in the construction organization design.

2.3 after the tower crane comes into play, check whether the manufacturer has a production license and factory certificate; Whether there is a safety technical file of lifting machinery and equipment of the property right unit.

2.4 The installation unit shall have the professional contracting qualification certificate for tower crane installation issued by the construction administrative department, and the employees shall have the operation or management qualification certificate.

2.5 Before the installation is completed and handed over to the users, the construction hoisting machinery inspection institution shall be entrusted to pass the inspection, and the installation quality shall be checked and accepted together with the property right unit and users, and can be put into use only after passing the inspection.

2.6 Before using the tower crane, it should be checked and approved by the local safety supervision department. When using the tower crane, the license and inspection certificate issued by the safety supervision department should be placed or pasted in a prominent position of the tower crane.

2.7 tower crane operators must have training certificates. Unlicensed personnel are not allowed to operate.

2.8 In the process of tower crane use, supervisors shall exercise safety supervision duties in accordance with the Regulations on Safety Production Management if unsafe factors are found.