Joke Collection Website - Talk about mood - When was Xin 'anjiang Hydropower Station built?
When was Xin 'anjiang Hydropower Station built?
Xin 'anjiang Hydropower Station is located near Tongguan Town, Jiande County, Hangzhou City, Zhejiang Province, on Xin 'anjiang River, a tributary of Qiantang River, which is 0/70km away from downtown Hangzhou.
rice. Xin 'anjiang Hydropower Station is the first large-scale hydropower station in China to survey, design, construct and manufacture equipment by itself, which embodies the 20th century?
The level of hydropower construction in China in 1950s.
The total installed capacity of the power station is 662.5 MW, the guaranteed output is 178 MW, and the average annual power generation for many years is18.6 billion kWh. The power station is mainly responsible for
East China power grid has the tasks of peak regulation, frequency modulation and emergency standby, and has comprehensive benefits such as flood control, irrigation, shipping and aquaculture.
2065438+April 2009 12, selected by the Coordination and Propaganda Department of China Association for Science and Technology, Innovation Strategy Research Institute of China Association for Science and Technology and urban planning society of china * * *.
List of Industrial Heritage Protection in China (the second batch). The scenic spot is open to 65438+February 3, 20201,Xin 'anjiang Hydropower Station, etc.
Nine scenic spots are open to medical workers nationwide free of charge.
Extended data:
Power station flood control
When the reservoir water level reaches or exceeds 106.5m, it will continue to rain in the basin, and it is predicted that the reservoir water level will continue to rise. Led by Zhejiang Flood Control and Drought Relief Headquarters
The person in charge shall convene the relevant personnel to form a flood control dispatching coordination group, and divide the flood control dispatching principles according to the rainfall, water regime, disaster situation and flood control situation in the upstream and downstream.
Analysis, and put forward suggestions for flood control, which were approved by the provincial flood control and drought relief headquarters and implemented by Xin 'anjiang Power Plant.
Since the completion of the hydropower station, in order to ensure the safety of upstream and downstream, * * * has carried out seven times of flood discharge, including trial flood discharge 1 time.
1,1983 started on June 28th and stopped on July 3rd. On July 5th, the floodgate was opened again, and the floodwater was stopped on June 5th.
2. The flood discharge started in June 1994 and lasted 123 hours.
3.1June 25th, 995, lasting 135 hours.
4.1July 3, 996, lasting 48 hours; On July 1 1 day, the floodgate was opened again 139 hours.
5.1June 29th, 999, 8 holes were discharged, which lasted 163 hours.
6, 2011June 2 1 day, 3 holes were used for flood discharge, and the flood discharge time was 33 hours.
Baidu Encyclopedia-Xin 'anjiang Hydropower Station
- Related articles
- Simple life sentences
- Early peace of mind: a paragraph enters the heart, just because it touches the heart.
- What poems describe depression and express depression?
- I love apple composition in my hometown.
- What are the good sentences and paragraphs about my sister?
- Talk inspiring about the lack of improvement.
- Poetry about grass, second grade.
- Eighth grade Chinese lecture notes
- Tell me about your understanding of Chunjian Plumbing Duck Prophet
- Tell me some famous sayings about science.