Seek the provisions of construction specification and acceptance specification for building scaffolding.

Safety code for scaffold construction

Reasonable and standardized scaffold erection is an important link to ensure construction safety. Scaffolding safety technical specifications and related safety technical rules and regulations must be strictly implemented.

1. scaffolder must be in good health, adapt to aerial work, and pass the examination according to national regulations, obtain the operation certificate of special operators and hold relevant certificates. Wear safety helmet, safety rope and non-slip shoes when working on the shelf.

2. Scaffolding is a special construction, and a construction plan must be made. Scaffolding operation can only be carried out after approval and safety technical disclosure to operators.

3. When erecting scaffolding, keep a safe distance from the overhead line of external circuit, set fences and warning signs around the ground, and assign special personnel to watch it to prevent materials from falling and hurting people. Scaffolds that are being erected or completed but have not been accepted by the person in charge of the construction unit (supervision unit), technology, safety and other relevant personnel shall not be put into use.

4. The construction load of the operation layer can only be less than or equal to the scaffold design requirements, and it cannot be overloaded.

5. Formwork, steel bars and materials can't be stacked on the scaffold, wires and cables can't be pulled on the scaffold (except for lighting wires, but they can't touch the scaffold and should be insulated), wind ropes can't be pulled on the scaffold, formwork supports, concrete pumps and concrete delivery pipes can't be fixed and erected, and they can't be used as hoists.

6. Scaffolding at the edge of temporary pit (pit) must have protective measures to prevent the collapse of pit (pit). It is forbidden to dig on or near the scaffold.

Scaffolding operations cannot be carried out in windy, rainy, snowy and foggy weather of magnitude 7.6 or above.

8. Scaffolding should be inspected and maintained regularly during use.

Before loading the operation floor, after heavy rain or strong wind of magnitude 6 or above, after freezing in cold areas, and after stopping for more than one month, it is necessary to deal with the phenomena such as tilting, sinking, loosening and jumping of the frame in time.