Joke Collection Website - Talk about mood - Landscape suspension bridge

Landscape suspension bridge

The main work includes: daily routine inspection, mainly including the firmness of deck board, whether there are obvious cracks and whether handrails are loose. Check the main load-bearing structures carefully for one month, such as whether the foundation is displaced or loose, whether the steel wire rope is intact, whether the anchor bolts of the steel wire rope are worn, whether the bridge body is inclined, the sagging degree of the bridge body, whether the wind-resistant cable is firm and whether the wind-resistant cable foundation is loose. This is our daily work flow to the scenic spot according to the relevant national regulations: during the opening hours, there should be staff at both ends of the bridge to prevent too many tourists from getting on the bridge. If tourists are crowded, they should be promptly diverted to prevent tourists from deliberately shaking, jumping and rolling on the bridge. Visitors are forbidden to climb and trample on the guardrail, clean the deck after the park is closed, and conduct daily inspections. If standard problems are found, they can be solved according to the equipment safety use and maintenance manual.