Construction method of ceramic tile floor; Laying steps of ceramic tile floor.

Floor decoration has a great influence on the overall effect of home improvement. Today, let's take a look at the construction method of ceramic floor tiles and the related introduction of the paving steps of ceramic floor tiles through the following contents!

Construction method of ceramic tile floor;

1. If there are no special requirements for ceramic floor tiles, the cement used for home decoration is generally cement, and 325 can be guaranteed to be within the cement quality before leaving the factory in January.

2. The ratio of lime to sand is 1: 3. Sand: leakage wall, inductor and all kinds of sealing sand are used. Coarse sand for ceramic tile packaging. Oh, I met a joke about using sand. Suppose the air force academy teacher is decorated, and the wall sticker lets you pull the teacher into the sand girl. She was angry: "We don't pile sand in the pigsty." Oh, the sand is not very good. Can only be used for wall tiles.

Before packing the floor tiles, the first thing you should do is to classify them according to the size of the tiles and the size of the floor.

4. Practice one and a half bricks and two separate furniture or rooms. Ceramic floor tiles are horizontal and vertical, so that the place that the eyes can't see can't exceed the reserved future.

Tile floor laying steps: 1. Tile floor can be a good check plan, and it can also ensure that the room is tiled with extra action. Initially, pull out two vertical and horizontal baselines.

If the distance between two points is 2.0μm as determined by the first 6: tiling measurement, whether the reference standard 1.6 m 1.2 m points follow the vertical datum line standard proves the junction.

2. One principle of tile floor is to look at the nine-step treatment with tiles, and then stick tiles horizontally, vertical lines, lines or upward alignment rules as the baseline effect. It's hard to get the standard of brick pavement wrong.

3. Cement and water reach the ground at the speed of cement and water, and then 1:? Mortar 3

The second step is moderate: mortar, and the standard is extended to' group hand holding, landing flowers', mortar.

4. Place the floor tile on the mortar, beat the solid with a rubber hammer, and flatten the first reference brick.

5. Open the knot, pick up the tiles and see if the mortar leaks or stains. Spray mortar and crush.

6. Lay the tiles to the level of bricks for reference. Pick up the tiles for the second time. Make sure the mortar is full. Make sure there are no gaps. If the tile is complete and flat, apply a layer of cement slurry evenly on the tile.

7. Place the brick for the third time, tap it hard and keep it level with the standard brick.

8. Use a level to ensure that the tiles are horizontal, and tap the tiles with a rubber hammer until they are horizontal.

9. Use a scraper, use a scraper to draw a constant gap between the brick and the 0.2 brick to prevent the center line from being damaged by thermal expansion and contraction, and so on. Are these two bricks flat? Strictly follow these nine steps, you can successfully complete the floor tile.