What are the contents of construction site safety management?
1. Safety inspection system:
Safety inspection is an important means and measure to eliminate hidden dangers of accidents, prevent accidents and ensure safe production. In order to continuously improve the production conditions and working environment, so that the working environment can reach the best state. So as to take effective measures to eliminate unsafe factors and ensure safe production, the safety inspection system is formulated as follows:
1. The content of safety inspection: according to the Grading Standard for Safety Inspection on Construction Site issued by the Ministry of Construction, check the implementation; Protection of the edge of the foundation trench; Construction electricity, safety facilities of construction machines and tools, operation behavior, correct use of labor protection articles and safety fire prevention, etc.
2. methods of safety inspection: regular inspection, surprise inspection, professional inspection, seasonal inspection before and after holidays and regular inspection.
2. Safety technical disclosure system:
Strict safety technical disclosure and serious implementation of safety technical measures are important guarantees for implementing the safety production policy, reducing work-related accidents and realizing safety production.
1. Before the project starts, the construction director and technical director shall organize relevant personnel to formulate detailed safety technical measures according to the engineering characteristics, geographical environment and construction methods, and report them to the relevant technical and safety departments at higher levels for approval. The approved safety technical measures have the function of technical regulations and must be carefully implemented.
2. When the project starts, the chief engineer and technical director shall make detailed safety technical disclosure to the project manager, builder, safety officer and team leader who organize the construction, so that the executors can understand the truth and lay a foundation for the implementation of safety technical measures.
3. Before each single project starts, the site project manager should organize the builder to explain the construction method and safety technical measures in detail to the actual team members, and issue them to the team in writing.
4. The builder shall fill in the Safety Technical Disclosure Form according to the implementation of the safety facilities, equipment and safety precautions of the single project safety technical measures, and the responsible person shall be assigned to the team, individual and implement the signature acceptance system.
5. The production organizer on the construction site shall not change the safety technical measures without permission. If reasonable suggestions are made, they shall be reported to the chief engineer in writing for approval. Before approval, they shall still be carried out according to the original plan.
6. The safety functional departments should regularly check the implementation of the construction site and supervise the implementation of various safety technical measures based on the construction safety technical measures and the safety laws and regulations.
3. Pre-shift safety activity system:
1. Before each operation team enters the construction site, the project department must carry out "three-level safety education" for the team staff and establish an education record card.
2. The project department must sign a safety production responsibility contract with each operation team leader and employee, and make a targeted written safety technical disclosure, and both parties must perform the signing formalities.
3. Before going to work every day, each operation team leader must conduct comprehensive and targeted safety education activities for the employees of his team, mainly emphasizing the safety precautions of the operation that day, checking the wearing conditions of the employees' safety protection articles, and observing and understanding the employees' emotional and psychological state that day.
4. Before putting into normal operation, construction machinery and tools must be checked twice: first, check whether they are installed correctly and whether there are safety protection devices and safety protection measures; Second, check whether its performance is normal, and operate according to the operating procedure of maintenance before operation, especially the machinery prone to accidents, which must be overhauled and checked for its safety status before shift. If any accident is found, it should be stopped immediately for maintenance, and it should be used after the commissioning is normal.
5. All alcoholics before shift are not allowed to enter the construction site; Anyone who does not have the conditions to work at his post is not allowed to work at his post.
6. The safety activities of the project department before shift must be recorded in writing, signed by the project safety officer, and supervised and inspected by the enterprise safety management section.
IV. Responsibility system for construction electricity management:
1. The team leader shall organize regular inspection of all electrical equipment, lines and protection systems on site, and arrange full-time electricians for maintenance in time when problems are found.
2. the deputy team leader conducts daily inspection, records the hidden dangers of electricity consumption in time, and asks full-time electricians to make rectification within a time limit.
3. Team members and other management personnel shall cooperate with the inspection work of the team leader and deputy team leader, and conduct irregular inspections before and after holidays, after heavy rain and strong wind, and report to the team leader and deputy team leader in time when problems are found, so as to nip all unsafe hidden dangers in the bud.
V. Safety and fire prevention system for construction electricity:
1. Non-professional staff are forbidden to tamper with electrical equipment.
2. When using all kinds of electrical equipment, all operators must conscientiously implement safety operation procedures and obey the safety technical guidance of electricians.
3. No unit or individual may assign personnel without electrician operation certificate to install and maintain electrical equipment.
4. The site management personnel should pay attention to the rational suggestions on safe electricity use put forward by electricians, and shall not force electricians to operate illegally for any reason.
5. Professional electricians must conscientiously implement all relevant regulations and procedures, and consciously resist illegal operation instructions from any side.
6. Professional electricians have the right to stop all illegal electricity consumption operations and report to relevant departments when necessary.
7. Professional electricians should have a correct working attitude and actively cooperate with electricity users to complete various production tasks.
VI. Inspection and maintenance system for construction electricity:
1. Electrical equipment on the construction site must be operated and installed by certified electricians, and non-electricians are strictly prohibited to connect to the power supply for operation.
2. Electrician operators must master the basic knowledge of safe electricity use and the performance of all equipment, and regularly check and maintain all power lines and equipment.
3. During the inspection and maintenance, you must wear the corresponding labor protection articles, switch off the power and lock the switch box according to the regulations before operating.
4. The construction electrical equipment and devices should be protected and maintained frequently, and the utilization rate should be extended. It is forbidden to operate the equipment in spite of illness.
5. during the inspection, it is necessary to have a construction electricity safety team composed of the builder, safety officer and full-time electrician on the construction site for inspection, and make inspection records.
VII. Protective measures for construction machinery:
1. The protective objects of construction site machinery mainly include chainsaws, planers, mixers and grinders.
2. The chainsaw should be equipped with a wooden or iron protective cover, and the planer should be placed in a dry place in the wooden shed.
3. The protection of the planer is mainly to protect the belt with a wooden or iron shield, and the planer should be placed in a dry place in the wood shed.
4. The protection of the mixer is mainly to build a protective shed to prevent rain and falling objects from hurting people. The protective shed is set up with steel pipes, and double protection is set on it.
5. The belt of the grinder shall be hermetically protected and placed on the dry ground in the steel bar shed.
VIII. Inspection and maintenance system of construction machinery:
1. All the machinery and equipment on the site shall be maintained and planned by the construction leader and the machinery monitor, and relevant personnel shall be arranged for maintenance and repair as planned. Full-time maintenance personnel shall make routine maintenance and irregular inspection to ensure the normal use of machinery.
2. Mechanical maintenance workers must know the quality of construction machinery, so as to find out the reasons for maintenance in time and accurately. Be diligent in inspection, maintenance and maintenance.
3. The problems found in various mechanical inspections must be dealt with immediately, and they must never be used reluctantly to prevent mechanical accidents and make truthful records.
4. The project department shall organize relevant personnel to inspect the maintenance and maintenance of machinery and equipment once a month, and give economic punishment to those who neglect their duties and fail to carry out regular maintenance as required, resulting in sick operation of machinery and other losses.
Extended information:
Safety management in production is a very important link for any industry, and safety management is also the top priority for all managers. In many industries, there is a whole production line with the policy of "safety first, environmental protection first and comprehensive management", and safety issues are closely related to the safety of workers and the interests of enterprises.
Energy, chemical industry, and so on, safety must be put in the first place. Assuming there are security loopholes, there are many hidden dangers in construction projects, which will lead to accidents, ranging from injuries to life, which will affect social stability.
safety in production is also beneficial to the benefit of enterprises. Safety first and quality first are the slogans on the construction site, and there are few slogans related to profit, but in fact, enterprises also need benefits. Safety and benefits complement each other.
as long as the safety work is done well, there will be no accidents, which will save a lot of costs invisibly. under the premise of no accidents, enterprises can successfully complete the construction according to the quality standards on time, which is the best enterprise benefit.
Baidu Encyclopedia-Safety Management of Construction Site
- Related articles
- Flower shop slogan
- What are the prohibitions for the future development of educational institutions?
- The history of Nanshan pines and cypresses
- What are the texts to pay tribute to the anti-epidemic heroes?
- This is the mascot of Ali Health Pharmacy. who is it?
- The teacher reminded her to drink more water because she worked too hard in class (general sentence 19)
- Key points of structural design of high-rise office building?
- When is the oral English test in the college entrance examination?
- Team slogan with four words and four sentences
- The first choice for starting construction! "Little three-axis" has great potential, the hard-core energy of Pilot ES3 is so strong