Temporary facilities have safe and civilized construction measures.

The cost of safety protection and civilized construction measures for construction projects consists of environmental protection fees, civilized construction measures fees, safety construction fees and temporary facilities fees.

Temporary facilities fee consists of the following three parts:

(1) Temporary buildings for turnover (such as mobile homes)

(2) One-time temporary buildings (such as simple buildings)

(3) Other temporary facilities (such as temporary pipelines)

Extended data:

Civilized construction measures are mainly used for:

1, "five certificates and one map", including: project overview card, management personnel list and supervision telephone card, fire control card, safety production card, civilized construction card and general plan of construction site;

2, the scene wall beautification (including internal and external painting, slogans, etc. ), coping decoration; The cost of tiling, hardening ground concrete or tiling the stove and the surrounding area of the on-site canteen production room and toilet; Decoration and beautification measures for other temporary facilities on the construction site;

3, in line with the requirements of the field capacity and appearance, material stacking and other relevant regulations to take measures;

4, on-site health cleaning and cleaning costs; The cost of drinking water equipment, shower, disinfection and other facilities that meet the hygiene requirements; The cost of taking measures such as deratization, mosquito prevention, gas poisoning prevention and epidemic prevention;

5, the construction site ground hardening costs;

6. Labor, materials and mechanical costs incurred by the road connection at the entrance and exit of the construction site;

7, after the completion of the project, the demolition, removal and restoration costs of the above measures;

8. Actual cost of other measures to ensure civilized construction.

References: