Joke Collection Website - Bulletin headlines - Summary of work of power supply company
Summary of work of power supply company
Sample essay on work summary of power supply company
Introduction: Power supply company refers to the safe, reliable, continuous and qualified sale of electric energy to the majority of electric power customers through power transmission and distribution devices to meet the economic needs of the majority of customers. Electricity needs for construction and daily life. Below is a sample work summary of a power supply company that I compiled. I hope it will be helpful to everyone.
1. Completion of main work throughout the year
(1) Completion of major economic and technical indicators
From January to October, The company completed an investment of 21,200 yuan in fixed assets; completed a power supply of 1.89 billion kilowatt-hours, a year-on-year increase of 0.32; power sales of 1.708 billion kilowatt-hours, a year-on-year decrease of 0.41, completing the annual assessment plan of 82.15; the maximum power supply load reached 395,000 kilowatts on July 20 , 0.76 million kilowatts higher than the highest load last year, a record high; the comprehensive line loss rate was 9.66, down 0.12 percentage points year-on-year; the balance of electricity bills receivable was 50,000 yuan, the customer satisfaction rate was 100, and the labor productivity was 2,021,308 yuan/person,
Sample work summary of power supply company
. Other major economic and technical indicators such as power supply reliability rate and voltage qualification rate all meet or exceed the requirements of the performance appraisal responsibility letter.
(2) Strengthen safety management and consolidate the safety foundation
The company combines the systematic "anti-violation" and "filter press filter cloth hidden danger investigation" work, and pays close attention to the safety management Pertinence and effectiveness. We organized and carried out seven safety inspections before the Spring Festival, including comprehensive inspections on production safety, special inspections to prevent misuse, infrastructure safety inspections, and special safety inspections of each business department. We decomposed the spirit of superiors layer by layer, implemented responsibilities, and further consolidated the foundation of safety management. In the themed safety activities, ten new measures for "anti-violation" work were introduced, and the "anti-violation" work was further promoted by establishing a closed-loop management mechanism of notification and exposure of violations, assessment and accountability, and rectification and inspection. From January to October, the company organized 1,352 safety activities, conducted 3,349 on-site inspections by leaders and managers, and found 37 violations of various types, of which 3 were serious violations in accordance with the "Four No Lets Go" The relevant responsible persons were dealt with seriously according to the principle. As of October 31, the company had been in safe production for 3,434 consecutive days.
(3) Accelerate the development of the power grid and promote the planning and construction of the power grid
Plan the development of the power grid in advance, organize the preparation of the "Rudong 35 kV Power Grid Upgrade and Renovation Plan", and actively hold talks with local governments , Incorporate power grid construction projects into local land use planning in advance. Serving the construction of ultra-high voltage projects, the route of the Nanjing North-Shanghai West section of the Ximeng-Shanghai West Ultra-High Voltage Transmission and Transformation Project in Rudong was confirmed. Pay close attention to the preliminary work of the project, and the land handover procedures for the project have been basically completed. Project construction is being promoted in sequence. In terms of the main network, the electrical construction of the 220 kV Changsha power transmission and transformation project has begun, the 35 kV Yuanzhuang substation step-up project has entered the electrical commissioning stage, and the 110 kV Guba and Lingang power transmission and transformation projects have entered the electrical commissioning stage. The bidding for the main equipment of the project has been completed, and the construction drawing design of the 110 kV chemical capacity conversion and capacity increase project has been completed, and we strive to put it into operation in December. In terms of distribution network, 50 kilometers of 10kV lines and 230 kilometers of 400V lines have been renovated in Xinjia. More than 410 distribution transformers have been renovated in Xindun. A total of more than 1,300 rural power grid projects have been implemented, effectively solving the frequent low voltage in some rural areas. , line tripping and other problems, through the implementation of a strict accountability system, during this year's large-scale agricultural irrigation, there were no distribution transformer burnout accidents in the county, and rural residents and agricultural production were basically guaranteed electricity.
(4) Strengthen production management and improve professional management level
Strengthen operation and maintenance management, take pre-control measures for weak links in the power grid, and complete a peak-to-peak project worth nearly 60 million yuan In the summer project, some substations and lines were increased and transformed to solve the overload problem of a few main transformers and lines. Integrate production resources in the line work area and centralize 5 operation and maintenance classes distributed throughout the county to the company headquarters.
At the same time, the company's emergency repair center was established to clarify responsibilities, streamline processes, and coordinate the emergency repair work of high- and low-voltage lines. Combining peer benchmarking indicator control with professional management work, we conduct qualitative and quantitative analysis of lagging indicators, decompose and implement responsibilities, implement improvement measures, and achieve upgrades in the rankings of some indicators. Seriously organize the centralized investigation and rectification activities of various "violations" of county power supply enterprises and the centralized investigation and rectification activities of political "various violations" of rural power supply stations, and promote the pragmatic development of activities from the aspects of organizational leadership, activity promotion, acceptance assessment, etc. County power supply enterprises concentrated on investigating and rectifying various "violations", and 46 problems were found, and 31 were rectified; rural power supply stations concentrated on investigating and rectifying political "violations", and 199 problems were found, and now 162 items have been rectified, and the remaining issues have been included in the rectification plan. The filter cloth is currently being rectified in an orderly manner. The promotion and application of 20 kV power supply has been carried out in a solid manner, and the supporting 20 kV outlet project of Rudong Chemical Industry Park was put into operation in May.
(5) Expand marketing potential and ensure operating efficiency
In order to minimize the impact of the economic downturn on the county’s industrial economy and power supply, our company firstly conducted in-depth enterprise research For research, we went to Dongri Steel Plant, Sutong Chemical Fertilizer and other large users to learn more about the operations of the companies, to ensure normal power supply and normal equipment operation. At the same time, it was recommended that some suspended companies resume work and start production early, and open a green channel for procedures to ensure Form power growth as early as possible. The second is to further shorten the business expansion work cycle, and provide all customers, regardless of size, with thorough, meticulous, open, fast and efficient services throughout the entire process. We intervene in project needs in advance, strengthen communication with government departments and project units, arrange on-site offices many times, and provide power supply services for the "four major carriers" industrial projects such as Johnson & Johnson Battery, Marriott Building Materials, and Iron Chain Factory, and strive to ensure that new projects are launched Enterprises should connect power as soon as possible and build production capacity as soon as possible. The third is to strengthen power analysis and monitoring, strictly enforce power outage approval procedures, and centrally arrange construction maintenance to minimize the number of power outages and ensure power supply to the maximum extent. In recent months, due to the gradual improvement in the market situation of the main industrial industries and the strong pull of the textile and metal products industries, the county's electricity consumption has shown a good trend of stabilizing and rebounding. In October, the county completed a power supply of 190 million kilowatt-hours, a year-on-year increase of 8.78 percentage points, and drove the annual power supply to achieve positive growth for the first time.
(6) Strengthen financial management and improve basic management level
Strengthen the process control of the budget, dynamically adjust it according to the actual implementation, ensure that costs and expenses are controllable and under control, and ensure the budget Occurs synchronously with the sequence. Carry out in-depth fund management work, combine it with the fund safety management manual issued by superiors, clarify the responsibilities of personnel in each link of fund management, and insist on regular inspections to ensure that fund management is controllable. Obtained affirmation from superior companies in multiple fund security inspections. Strengthen the financial management of rural electricity and introduce a series of systems such as accounting procedures for rural electricity business and management measures for rural electricity reserve funds. Actively adapted to the "one account" management model of the provincial company, launched the online application of fmis4.0 according to the requirements of superiors, optimized and set up relevant business processes, strengthened the standard flow of business, and further improved the level of financial internal control management. Cooperate with the special audit work of provincial companies and use audit work as a starting point to strengthen internal control of enterprises and avoid business risks.
(7) Deepen the construction of work style and work style, and optimize the external environment
First, deepen the construction of work style and work style. This year, our company has combined the county's "Year of Institutional Style Construction" activities to further strengthen the standardized education of personnel at all levels in terms of work style, life, study and service behavior. The special organization held a mobilization meeting for work style construction, requiring all employees to unify their thinking, further transform their service concepts under the new situation, establish the concept of full service, and thoughtfully and meticulously meet customer needs. We will strictly carry out responsibility assessment for all types of customer complaints and reports of misconduct incidents once verified. We strengthened communication and coordination among various departments, accelerated the establishment of the internal "four service mechanisms", and held high-quality service symposiums at the main business and multi-level levels.
Invite government leaders in charge and newly appointed work style supervisors to hold a mobilization meeting for work style construction, invite leaders of the National People's Congress to inspect and guide the power supply work, and build a good external environment for accelerating the development of enterprises. The second is to earnestly carry out the high-quality service theme activity of "Green Power Construction", using the activity as a platform, and do everything possible to meet the various service needs of the people. We will do a good job in ensuring power supply for major political and economic events such as high school entrance exams, the 60th anniversary of the National Day, and the "Overseas Trade Fair" to ensure the smooth progress of all major activities in the county. The third is to overcome difficulties such as tight construction capacity and tight construction schedules, and with a high degree of "ownership" awareness, make every effort to complete various types of government projects, municipal projects, marine railways, S225 lines and other road transportation infrastructure construction involved in the relocation of power poles and lines. service work and conscientiously fulfill corporate social and political responsibilities. The fourth is to conscientiously carry out research visits and solicit opinions, and listen to opinions and suggestions with an open mind. Since the second half of the year, the company's main leaders have led a team to 14 towns and 4 development zones in the county, convening representatives of the National People's Congress, representatives of the CPPCC members, customer representatives and village branch secretaries to hold power supply service symposiums to publicize power policies and solicit opinions extensively. Opinion. Regarding the opinions and suggestions raised by leaders at all levels and customer representatives at the meeting, the company clearly defined the responsible department and responsible person, and immediately arranged on-site work for some urgent issues. Therefore, the opinions and suggestions were all responded to in writing within 15 days. It was affirmed by the town (district) party committee and government. In mid-February, the three agricultural power business departments of Yangkou, Juzhen and Hekou were recommended by the Rudong County Commission for Discipline Inspection and the Municipal Company Discipline Inspection Commission to apply for "Nantong City People's Satisfaction Advanced Grassroots Station."
(8) Strengthen the construction of spiritual civilization and coordinate the development of the three civilizations
Strictly follow the requirements of "three stages and six links" and carry out solid activities to learn and practice the Scientific Outlook on Development, 72 rectification items were clarified, and the activities achieved initial results. Vigorously carry out the activities of "Power Grid Pioneer Party Branch", "Pairing to Create Pioneers" and "Coordinated Party Building" to promote the "Strong Foundation Project" of party building. Introduce safety and unit (department) implementation measures to strengthen employee concept guidance and ensure team stability. We conscientiously promoted and implemented the core values ??of State Grid Corporation of China, produced publicity boards, and held theatrical performances with the theme of "Integrity, Innovation, Responsibility, and Dedication" to create a strong publicity atmosphere. The construction of party style and clean government has been solid and in-depth, and various forms of activities such as talks on clean government, signing of letters of commitment on clean government, and warning education on Integrity Day have been carried out. Implement special efficiency supervision on the management of agricultural power supplies, further standardize the material management process and improve the management system. Strengthen enterprise management, care about the lives of employees and retired comrades, and build labor relations.
2. Existing problems
1. The foundation of safe production is not strong enough, and safety managers and front-line production personnel do not study the new safety regulations and systems in depth enough; there are many construction sites, and safety Inspection cannot achieve full coverage of the construction site to a certain extent.
2. The power supply pressure in some areas is still high. As the temperature rises, the power grid is under tremendous pressure. Voltage in some areas cannot be guaranteed, and a few equipment are overloaded, over-temperatured, and malfunctioned. This puts great pressure on ensuring the safe and stable operation of the county's power grid.
3. Some peer benchmarking indicators such as line loss rate and power supply reliability rate rank low, and there is still a lot of work to be done to upgrade lagging indicators.
4. Affected by the local economy, the situation of enterprises increasing supply and sales is severe. A large number of enterprises have applied for suspension or reduction of capacity. Even if some enterprises complete the business expansion work, it will be difficult to actually start operations in the short term, resulting in power growth. It is difficult to see a large increase in power supply throughout the year. ;
- Previous article:What is the prospect of self-service car washing?
- Next article:A rabbit sleeps under a tree and writes four sentences in English.
- Related articles
- Forest fire safety slogans and banners
- Slogan of nonferrous metal recycling enterprises
- What day is May 22nd, 2022?
- Can "seeking truth" antihypertensive tea really "lower blood pressure"? Let's see what's in your tea.
- What’s the story of Chrysler? Please, thank you.
- Shenzhen cleaning company
- Academic contribution of wisdom
- Introduce Hangzhou in English
- I traveled to Yunnan four years ago and was induced by the tour guide to buy jade. What if you are cheated100000?
- Who are the model workers during the 15th Plan?