Civilized construction measures

Civilized construction measures are as follows:

Use scientific management ideas, methods and means to rationally configure and optimize the combination of various elements on the construction site to achieve standardization of site management. Adhere to civilized construction, promote the implementation of standardization and standardization of on-site management and construction operations, enable employees to develop good styles and professional ethics, and put an end to barbaric construction phenomena.

1. General construction plan management

According to the characteristics of urban construction, the construction site is enclosed. Use the site rationally to ensure smooth flow of traffic, water, electricity, and drainage systems on site. The self-built road layout is combined with the on-site processing points, warehouses, cement, sand and gravel and other counterpart locations, and is connected to the site roads. Temporary facilities are arranged to avoid secondary construction, and dedicated personnel are arranged for maintenance and repair.

2. Living area

⑴ Build offices, dormitories and living facilities in strict accordance with the unified requirements of the owners. At the same time, set up walls, gates and doormen. The doormen are served by our security personnel, using semi- Militarized closed management, fire hydrants and fire extinguishing equipment are installed in the compound according to fire protection requirements. Domestic wastewater, garbage and waste are stored in a centralized and closed manner and transported and processed in a unified manner. The name of the construction unit, project name and quality and safety slogans are written around the wall and in the courtyard, and publicity boards are set up to introduce the project overview, construction and significance.

⑵ Bedding, curtains, etc. in the staff dormitories should be purchased in a unified manner. The requirements for stacking quilts and placing daily necessities should be consistent and orderly.

⑶ Maintain good hygiene and cleanliness, keep the inside and outside of the dormitory dry, and spray pesticides regularly to ensure there are no flies or mosquitoes.

3. Construction site

⑴ There is a project overview sign, and it proves the project name, construction unit, project leader, technical leader, safety officer, quality inspector, project quantity, The construction period requirements, concrete mix ratio, construction technology, quality requirements, etc., and the reasonable combination of people, machines, and materials to ensure that the finished work is clean.

⑵ Temporary toilets should be set up on site. Open defecation is not allowed. The toilets should be cleaned regularly to ensure they are free of flies, maggots and odor.

⑶The material yard is reasonably planned and arranged, the site is hardened, the drainage is smooth, and moisture-proof measures are taken. The materials are stacked neatly, and materials of different specifications are stacked separately. The specifications, inspection status, and use parts of various materials must be Clear signs, the signboards of each construction team are uniformly produced and have uniform specifications.

⑷ Garbage and waste shall not be discarded at will on site. Garbage and waste shall be piled up in a centralized manner and transported to the location designated by the owner for disposal in a timely manner.

⑸Construction personnel should wear uniform uniforms, management personnel should wear job certificates, indicating their unit, name, position or position, management code, etc., and construction operators should print management codes on their work uniforms and safety helmets.

4. Construction equipment

⑴Construction equipment should be parked neatly, with signboards indicating management codes, equipment performance, status, operator names, etc. At the same time, fire extinguishing equipment, The machinery and equipment are managed and operated by dedicated personnel.

⑵ Post identification signs on the right front glass of construction machinery and vehicles, indicating the name of the bid section, the name of the construction unit, and the management code, etc.

5. Construction operations

The person in charge and technical personnel should go to the site to provide guidance; the person in charge of each work shift must make a good handover on site; the concrete construction must have a mix ratio notice; there must be qualified Measurement tools must be used correctly in accordance with regulations; construction must be carried out in strict accordance with technical briefings, construction drawings and construction specifications.

6. Information

Various technical information and statistical reports are complete and accurate; physical workload and progress are reported on time; ledgers of project quality, material consumption, and economic benefits are provided in real time.

7. Publicity and education

There should be appropriate publicity placards at the construction site to create a good construction atmosphere.

8. External relations

During the construction process, the relationship with the local government and the masses should be properly handled. Strict mass discipline, ensure that construction does not affect the lives and production of residents, and provide local services to the best of our ability. At the same time, we must respect local and ethnic minority customs and strictly abide by ethnic policies. No quarrels or fights are allowed.

9. During construction, unearth valuable cultural relics, protect them and report them to the owner immediately for disposal.

Control points for civilized construction management on site:

1. Entrances to the construction site should be marked with the company name or company logo, project overview boards should be set up at obvious main exits, and signs should be placed inside the gate. Set up a general plan of the construction site and system signs such as production safety, fire protection, environmental protection, civilized construction and management personnel lists, and supervision telephone signs.

2. The construction site must implement closed management, and a guard room should be set up at the entrance to the site. Closed enclosures must be used around the site. The enclosures must be strong, clean, beautiful, and set up continuously along the perimeter of the site. The height of the fence on general road sections shall not be less than 1.8m, and the height of the fence on main urban road sections shall not be less than 2.5m.

3. The site management of the construction site should be based on the reasonable arrangement of the construction plan design and the standardization of the location management of materials and equipment. The project management department should based on the construction conditions and in accordance with the construction master plan, construction plan and According to the requirements of the construction schedule, carry out the planning, design, layout, use and management of the construction plans in the responsible area.

4. The main mechanical equipment at the construction site, scaffolding, dense safety nets and fences, molds, temporary construction roads, various pipelines, construction material product yards and warehouses, earthworks and construction waste piles The layout of areas, transformer and distribution rooms, fire hydrants, guard rooms, on-site offices, production and temporary facilities, etc., should all comply with the requirements of the construction plan.

5. The construction area at the construction site should be clearly separated from the office and living areas, and corresponding isolation and protection measures should be taken. Temporary buildings at the construction site should be located at a reasonable location and comply with safety and fire protection requirements and relevant national regulations. It is strictly prohibited for people to live in the project under construction.

6. The construction site should be equipped with temporary facilities such as offices, dormitories, canteens, toilets, shower rooms, boiling water rooms, cultural and sports activity rooms, closed stands (or containers) and wash-off facilities. , should comply with environmental protection and fire protection requirements.

7. A smooth drainage ditch system should be set up at the construction site to keep the roads on the site dry and solid. Mud and sewage should not be discharged directly without treatment. The construction site should be hardened, and if conditions permit, the construction site can be greened.

8. The construction site should establish an on-site fire prevention system and fire emergency response mechanism, implement fire prevention measures, and be equipped with fire prevention equipment. Open fire operations should strictly implement the fire approval procedures and fire supervision system. High-rise buildings must be equipped with dedicated fire-fighting water sources and fire-fighting risers, and fire-fighting water source interfaces should be provided on each floor.

9. Publicity boards and newspaper columns should be set up at the construction site, and safety slogans and safety warning signs should be hung to strengthen the promotion of safe and civilized construction.

10. Comprehensive security management and community services should be strengthened at the construction site, an on-site security system should be established, and security precautions should be implemented to avoid theft and nuisance incidents.