Joke Collection Website - Bulletin headlines - Implementation plan for cost reduction and efficiency improvement

Implementation plan for cost reduction and efficiency improvement

Cost reduction and efficiency improvement is a word that means to reduce costs and increase benefits. The following is an implementation plan I compiled for reducing costs and increasing efficiency. Welcome to refer to it. Implementation plan for cost reduction and efficiency improvement Part 1

In 20xx, the General Department will start to control costs from the following aspects. The specific implementation plan is as follows:

1. Increase publicity and improve the performance of various departments , Branch employees’ awareness of cost reduction and efficiency improvement

1. Organize a special training on cost reduction and efficiency improvement every quarter to explain the importance, urgency and implementation of cost reduction and efficiency improvement work, and enhance the worries of all personnel Awareness, crisis awareness and responsibility.

2. Cooperate with branches and departments to establish and improve cost reduction and efficiency improvement systems, so that each employee can develop a good habit of routine saving. "Start from small things in daily life, save one kilowatt hour of electricity and one piece of paper. , a drop of water, etc." to form a good atmosphere of "everyone saves and opposes waste".

2. Safeguard measures

1. Our principle of cost reduction and efficiency increase: "Dedicate responsibilities to individuals, manage quotas, and reduce public use." Specific measures:

(1) For office supplies and low-value consumables, adopt a responsibility system to achieve ledger management. Measures:

A. According to the labor protection supplies distribution standards, formulate office supplies distribution standards, determine the use standards and service life, and distribute them regularly, such as 1 pen holder per year and 1 refill per month. Since multiple positions are involved, the specific standards for the distribution of office supplies will be initially finalized on March 1st and submitted to the Enterprise Management Department for review on the 2nd before being released and implemented.

B. Computers, air conditioners, printers, office desks and chairs, filing cabinets, lockers, paper and other items (due to the large amount of paper used, the amount of paper used is determined according to differences in positions), according to the low-cost chemical industry group department A ledger of consumable items is established for each person. If items need to be added, whether to equip or allocate them for use will be determined based on the actual situation.

C. Warehouse management strictly requires each department and branch factory to establish an item registration account for the items that need to be purchased and distributed. The General Department conducts regular inspections. Each department must designate a dedicated person to take charge of the items to facilitate the allocation of items. Use and account creation.

(2) According to the expense items incurred in 20xx, the specific expense budget is shown in the table below:

Specific measures:

A. Strictly limit internal and external entertainment expenses It will be implemented in accordance with the chemical industry group's expense standards, try not to be special, and implement it in accordance with relevant hospitality standards.

B. Strengthen the vehicle management of small cars. Strictly control the scope of car users, make overall arrangements for the use of cars by various departments, ensure that car use is standardized, planned and organized, avoid increasing costs caused by repeated use of cars, and develop the habit of "carpooling".

3. Reward and Punishment Management

In order to fully realize the principle of lowest cost and maximum benefit in all the group's work, all employees must start from small things, start with me, and clearly stipulate Reward and penalty standards:

1. The expenses incurred by using items under one’s own name shall be based on the expenses incurred by the General Department’s monthly planned expense sharing in the "20xx PVC and Caustic Soda Internal Approval Summary Table Manufacturing and Auxiliary Expenses" , implemented to individuals, if the expenses incurred in the month are within the quota, the company will reward the part saved in the ratio of 6:4, that is, the company accounts for 60% and the individual accounts for 40%. If the expenses incurred are beyond the quota, the company will reward them in the ratio of 7:3 Implement it to individuals, and each can prove it to avoid waste and save 10% on the total cost.

2. Computer use: If the computer is not used for more than 30 minutes, the computer monitor should be turned off. Except for special circumstances, the user will be assessed 30 yuan/time. If the computer is not used for more than 1 hour, the computer should be turned off. Except for special circumstances, the assessment User 50 yuan/time.

3. Use of electric lights: When there is sufficient light, if there is no need for reception, turn off all lighting lights. After get off work, make sure the lights are turned off when people leave to avoid the phenomenon of "always on lights". If the lights are not turned off in time, , the assessment of on-the-job personnel is 20 yuan/person.

4. Telephone use: Do not use the company's landline for non-work reasons, and keep long conversations short when making calls. If you are found to be making private calls to talk about things unrelated to work, the user will be assessed 50 yuan per time.

5. Use of paper: All paper used is not handed in for official documents, and both sides of the paper are used; printed documents must be typed closely to save printing paper and ink. Paper use shall be carried out in accordance with the standards of Article 3, Paragraph 1.

6. Water conservation: use as needed to save water. This is assessed and implemented according to the "Bathroom Management Standards".

7. Other businesses: The principles of equal effects and cost savings are uniformly followed, and the assessment standards are implemented in accordance with the "Daily Management Standards".

4. Plan description

1. This plan is for the general department during the production period and does not include the cost budget of project personnel.

2. This plan is applicable to the General Department, and the production department is no longer included in the plan.

3. The comprehensive administrative expenses of other departments are not included in this plan. Implementation Plan for Cost Reduction and Efficiency Part 2

In response to the severe production and operation situation, in order to ensure the successful completion of the safety and production tasks and cost reduction and efficiency goals in 20xx, the leadership team of xx factory held responsible meetings for workshops and departments People's meeting, looking inward, brainstorming, and after research by the leadership team, the measures for cost reduction and efficiency increase in 20xx are specially formulated as follows:

1. Increase the intensity of publicity and education on the situation and tasks, and guide employees to firmly establish Crisis awareness, cost awareness and responsibility awareness

In 20xx, xx factory will carry out extensive and in-depth discussion activities on "The company has difficulties, what should we do" so that employees can correctly understand the current situation and work together to reduce the risk. cost efficiency; through learning activities from advanced figures such as Guo Mingyi, Xing Guibin, Jiang Dongming, etc., we guide employees to stay committed to their posts, dedicate themselves to their duties, and continuously improve the management level and technological content of inspection and maintenance, so that "tighten your belt, live a tight life, and The business philosophy of careful budgeting, cost reduction and efficiency improvement has become the common sense of every xx person.

2. Continue to promote safety standardization work and guide employees to firmly establish the concept of "safety is the greatest benefit"

In 20xx, xx factory will continue to improve and implement safety standardization work , especially promoting the standardization of employee operations, ruthlessly combating the "three habits and four violations", achieving safe production throughout the year, and eliminating the occurrence of all safety accidents. It is necessary to educate employees that the more serious the situation is, the more they must do a good job in safe production, and guide employees to firmly establish the concept of "safety is the greatest benefit, safety is the prerequisite to ensure and consolidate the results of our labor, and without safety, there is no benefit."

3. Further strengthen the working model of "preventive maintenance and repair", implement precise inspection and meticulous repair, and control hidden dangers and defects in the bud

In 20xx, xx factory will use Strengthen the working model of "preventive maintenance and repair", increase the intensity of employee skills training, improve employees' operational capabilities, and achieve precise inspection and detailed repairs in daily work. At the same time, through daily line bridge quality inspections and semi-annual all-round quality status assessment work, hidden dangers and defects are controlled in the bud, and the consumption of material spare parts is minimized. The goal for next year is to reduce material consumption on the basis of this year. The cost of spare parts is 2 million yuan.

4. Carry out in-depth various forms of "cost reduction and efficiency improvement" labor competition, so as to hold watermelons and pick sesame seeds

Educate employees to save a drop of water, a kilowatt hour of electricity, and a Starting from a rubber pad, a road spike, and a backing plate, we must resolutely do a good job in energy conservation and consumption reduction, put an end to the occurrence of leaks, and save energy. Everyone is responsible. It is necessary to intensify the work of repairing old materials and recycling them, and focus on transferring reusable material spare parts to equipment modification in material yards and areas with serious corrosion through equipment modification, rail type upgrade and other channels. In 20xx, it plans to create 5 million yuan in benefits by upgrading existing lines by replacing rails.

5. Fully mobilize the enthusiasm of employees for safety and production, and carefully organize self-repair projects on the premise of completing normal maintenance and production tasks

At present, the front-line line maintenance workers of xx factory only There are less than 240 people, and it is difficult to deal with the slightly more difficult repair work in a single inspection area. To this end, in 20xx, our factory will vigorously implement joint operations in the inspection area through nearby zoning and the combination of strong and weak. At the same time, we fully mobilize the enthusiasm of employees and increase the share of self-repair projects on the premise of completing normal maintenance and production guarantee tasks. On the basis of overcoming cost constraints and completing self-repair output value of nearly 2 million yuan this year, we plan to complete 4 million yuan next year.

6. Vigorously implement topic research, improve the operation potential of railway equipment, and strive to achieve essential cost reduction and efficiency improvement

In order to solve the long-term problem of heavy-haul railway crossings that has troubled our factory's maintenance To solve the problem of production guarantee, since this year, our factory has carefully organized and tackled the problem and completed the structural transformation of six key crossings. Considering the factors that caused the rising unit price of labor costs, it directly reduced the maintenance cost to 672,000 yuan. The investment in crossing reconstruction was three It can be recovered within a year. In addition, the gradual implementation of welding repair projects on frog lines and the research and development of concrete turnout sleepers organized by our factory at the beginning of the year will also lay a solid foundation for long-term cost reduction and efficiency improvement work.

7. Fully coordinate and utilize the company's material spare parts inventory and our factory's production turnover materials, and strive to achieve a healthy flow of warehousing materials

First of all, we must do a good job in revitalizing the inventory in conjunction with the actual maintenance and production guarantee. , strive to reduce production turnover materials and eliminate "dead inventory" as soon as possible; secondly, fully rely on the company's inventory to achieve reasonable matching and consumption, so that the company's inventory materials and factory-managed production turnover materials can adjust and complement each other to maximize logistics benefits. Third, we must continue to coordinate the work of replacing 60kg/m rails with scrap steel, fully tap xx’s internal resources, and realize potential benefits to make up for the lack of materials and spare parts costs.

8. Strictly implement comprehensive budget management to achieve the best combination of production safety and cost control

After the 20xx budget is approved by the company, it will be decomposed to each workshop, department, office, etc. in a timely manner The team has formed a cost reduction and efficiency increase pattern of "everyone has a heavy burden to bear, and everyone has a target"; the factory department will also issue the implementation cost plan together with the production tasks, report the implementation status in a timely manner, analyze existing problems in a timely manner, and instruct relevant Workshops and departments make timely rectifications to ensure timely resolution of problems and achieve the best combination of production safety and cost control.

9. Give full play to the leading role of the party organization and vigorously carry out the activities of “reducing costs and increasing efficiency, creating first and striving for excellence”

Require the party branches of each workshop to focus on reducing costs and increasing efficiency, and actively Carry out topic research activities; the factory Discipline Inspection Commission will organize disciplinary inspection inspectors to supervise and inspect the implementation of cost budgets in various workshops and departments, do a good job in monitoring the effectiveness of cost reduction and efficiency improvement, and plug management loopholes; all party members must use "cost reduction" "Efficiency Enhancement, Benchmarking and Navigation" activities to find gaps and deficiencies in cost reduction and efficiency improvement, further improve work potential and business level, and set an example for employees. Implementation Plan for Cost Reduction and Efficiency Part 3

1. Current Operation Status of Central Air Conditioning

1. The energy consumption of central air conditioning is astonishing

In the past 10 years, my country’s central air conditioning has The industry growth rate reaches 20%, which is about 10 times the international level. It has become the third largest air-conditioning equipment manufacturer after the United States and Japan, with an annual output of nearly 100,000 units.

30-40% of the electricity consumption of central air conditioners is ineffective consumption and wasted. High energy consumption has become a major bottleneck restricting the healthy development of central air conditioners. It is urgent to solve the problem of high energy consumption of central air conditioners. Meijie!

2. Scale is the biggest source of energy waste in central air conditioners

The heat exchange surfaces of central air conditioners are all made of copper. The thermal conductivity of copper is 397W/(mK), but scale The thermal conductivity is only 0.464~0.697W/(mK), which is only 0.12~0.17% of copper.

According to many years of technical research by authoritative foreign air-conditioning technology departments and a large number of facts, it has been proved that central air-conditioning cleaning can save energy consumption and operating costs by more than 12%.

3. The current situation of chemical cleaning of central air conditioners is worrying

(1) Central air conditioner users have weak awareness of cleaning and energy saving

For most central air conditioner users, Chemical cleaning is just a helpless move to meet the needs of air conditioning and refrigeration. Few users view chemical cleaning from the perspective of energy saving and consumption reduction.

(2) The chemical cleaning technology of central air-conditioning is backward, and the number and quality of cleaning teams are generally low.

Traditional chemical cleaning is a highly professional technology. Often a small negligence may cause serious safety accidents or huge economic losses. It is not uncommon for refrigeration equipment worth tens of millions of dollars to be scrapped during chemical cleaning. This is one of the reasons that discourages central air-conditioning users.

(3) Insufficient government management and guidance

Nowadays, the government often only advocates increasing the indoor temperature when central air conditioners are used, but they do not know that effective management of chemical cleaning of central air conditioners can contribute to energy saving and reduction. Consumption is more significant.

Most central air-conditioning users lack knowledge of chemical cleaning and often equate the word chemical with corrosion, toxicity, and danger. Therefore, the government also needs to strengthen its correct guidance and publicity work.

2. Overall plan for energy saving and consumption reduction

From the discussion of the current situation of central air conditioning operation, our company believes that two problems need to be solved technically:

1 , Actively promote the new technology of neutral cleaning of central air conditioners, so that users of central air conditioners can safely and boldly accept chemical cleaning of central air conditioners.

2. Starting from the new central air conditioner, popularize the new concept of dirt-free operation of central air conditioners. That is to say, by properly handling the design and installation process of the new central air conditioner, the central air conditioner can always operate efficiently without or with almost no scaling, instead of waiting for the central air conditioner to scale and affect the operating efficiency. Clean.

After the new central air conditioner has achieved positive results, similar mandatory modifications can be carried out for the central air conditioners that have been put into use.

The specific plan is as follows:

1. Actively promote the cleaning of the refrigeration system before driving

Use the neutral degreasing and descaling cleaning agent developed by our company to clean the central The air-conditioning refrigeration system is cleaned before driving. After cleaning, the highly efficient three-proof coolant independently developed by our company to prevent scaling, corrosion, and rust can be added to the refrigeration system to achieve efficient and safe operation without cleaning for 3 to 5 years.

2. Install automatic cleaning equipment

Most central air-conditioning cooling systems adopt open heat dissipation. The circulating water evaporates in large quantities and is very easy to scale. However, in this system, only the condenser has heat exchange. Therefore, a set of automatic cleaning equipment independently developed by our company can be installed on the condenser. During the cooling period of the air conditioner, central air conditioner users should close the inlet and outlet valves of the condenser every one or two months and turn on the automatic cleaning button to achieve thorough cleaning of scale. After cleaning, replace the plastic bucket containing the cleaning agent to supplement the neutral cleaning agent developed by our company and prepare it for the next cleaning.

3. It is recommended that central air-conditioning users strengthen other energy-saving measures

a. Strengthen the daily maintenance of cooling water circulation water

b. Clean the fan coil regularly< /p>

c. Strengthen the cleaning of air ducts

4. Other significance of cleaning and protection before driving:

a. Reduce the loss and maintenance cost of central air conditioning

b. Extend the service life of central air conditioners

c. Cleaning before driving is a perfect complement to the quality inspection of central air conditioner installations

4. Energy saving transformation of central air conditioners has a long way to go

According to statistics, from the installation to the elimination of a central air conditioner, the initial installation fee accounts for only 10% of the total cost on average, which means that operating expenses and maintenance fees account for nearly 90%. The cost of energy-saving renovation of central air conditioning only accounts for 10% of the installation fee and about 1% of the total cost, but this 1% has an immeasurable effect on 90%.

However, for central air-conditioning users with weak energy-saving awareness, chemical cleaning of "repairing the situation" type is more acceptable; energy-saving transformation of "preparing for a rainy day" type is not easy to accept. Therefore, the promotion and application of this technology requires vigorous publicity, guidance, and support from all walks of life, including government departments, to achieve it as soon as possible. Implementation Plan for Cost Reduction and Efficiency Increase Part 4

In order to conscientiously implement the spirit of the activities of the main plant to reduce costs and increase efficiency, comprehensively improve the level of corporate management, deeply tap the potential of the enterprise, and continuously enhance the comprehensive strength of the enterprise, further promote The main factory has sustained, healthy and rapid development. Based on the actual situation of the branch factory, we have formulated.

1. Organizational Structure

Establish a "Cost Reduction and Efficiency Increase" leading group, with the branch factory director as the team leader, the deputy factory director and secretary as the deputy team leader, and each team and team Chiefs and technicians serve as members. The "Cost Reduction and Efficiency Increase" leading group, under the leadership of the team leader and deputy team leader, based on the requirements of the main factory business planning department for cost reduction and efficiency improvement work, combined with the actual production and operation status of each team, targeted various costs and expenses of the branch factory , led by the management team, with other teams fully cooperating and performing their respective responsibilities.

2. Cost reduction goals

1. Strengthen management and reduce various costs, including material control, transfer process and personnel allocation;

2. Pay close attention to the electricity consumption policy and actively strive to reduce electricity expenses;

3. Actively revitalize inventory resources and utilize inventory sheets and materials;

4. Carry out equipment transformation to reduce Consumable parts are consumed, repair old ones and recycle them;

5. Reduce maintenance costs, optimize production processes, and save production costs;

6. Increase technological innovation and improve production efficiency.

3. Guiding ideology

In accordance with the notice requirements of the "Detailed Assessment Rules for Production Assault Battle Labor Competition" issued by the main factory and combined with the actual situation of the branch factory, we have established a policy of saving energy, reducing consumption and scientifically tapping potential. As a starting point, we focus on reducing costs and improving production efficiency in the production process, thereby increasing the operating income of the branch factory.

IV. Indicator system

Based on the development requirements of “three improvements, two decreases, and one stability” (namely: improve labor efficiency, improve equipment efficiency, improve resource utilization efficiency, and reduce material consumption, energy consumption, and stable product quality), focus on the prominent contradictions and weak links that affect the development of production and operations, firmly grasp the key factors that affect costs, focus on completing production tasks, and specifically establish three "cost reduction and efficiency improvement" The large indicator system is: technical and economic indicator system, process cost indicator system, and comprehensive benefit indicator system.

5. Work measures

1. Promote target management and gradually improve the target indicator management system

Strengthen the collection of information, form a regular review system, and find gaps and deficiencies ; Improve the operating mechanism and assessment and incentive mechanism for cost reduction and efficiency improvement, and conduct dynamic, scientific and reasonable optimization of various indicators that affect the branch's operating income throughout the entire process.

2. Increase publicity efforts to create an atmosphere of energy conservation, tapping of potential, cost reduction and efficiency improvement

Currently, some employees in the branch do not have a deep enough understanding of the significance of cost reduction and efficiency improvement. Further liberation is needed. During the labor competition, the branch factory will increase its publicity on cost reduction and efficiency improvement, and use pre-shift meetings and staff meetings. Publicity boards and other means are used to publicize the significance and typical cases of cost reduction and efficiency improvement work, create a strong event atmosphere, and guide and mobilize all employees to actively participate in this activity.

3. Sort out the current situation and identify cost reduction control points

Comprehensively sort out the current status of process costs and expenses, and find possible cost reduction points, including gas and electricity consumption, raw material utilization, equipment We will work hard on maintenance costs, consumption of auxiliary materials, etc., and refine and decompose the cost reduction work indicators into the smallest units. During the decomposition and implementation, each team will further increase the cost control points, so that the covered processes are controlled, have indicators, and have assessments. .

4. Increase investment in science and technology, use technological innovation and process innovation to improve production efficiency, and save production costs

By organizing technical personnel to work hard on key problems and soliciting rational suggestions from all employees. , actively solve various problems that may be encountered in the production process of new products, and ensure the orderly advancement and implementation of various key tasks.

6. Assessment Methods

The effect of cost reduction and efficiency improvement activities during this labor competition will be assessed weekly by the team and summarized monthly. The branch factory will base on the cumulative assessment results , after the labor competition, the teams and individuals who have made outstanding achievements will be reported to the main factory for evaluation. Implementation Plan for Cost Reduction and Efficiency Increase Part 5

In order to thoroughly implement the Scientific Outlook on Development, this plan was formulated based on the "Key Points of Energy Saving and Emission Reduction in the Education System of Henan Province in 20XX" and in conjunction with the creation of the "conservation-oriented campus" in our town. this program.

1. Guiding ideology

Guided by Deng Xiaoping Theory and the important thought of "Three Represents", we fully implement the Scientific Outlook on Development and adhere to development and conservation, water conservation, land conservation, Saving food and materials is the main content, and publicity and education are used. Through various means such as organizational management and skills transformation, various effective measures have been taken to vigorously carry out energy conservation and emission reduction actions throughout the town and promote the construction of a "conservation-oriented campus".

2. Work objectives

On the basis of maintaining appropriate development of education scale and ensuring continuous improvement of education quality, the school conscientiously carries out energy conservation, emission reduction and environmental protection through carrying out energy-saving and emission-reduction school actions. Protect education practice activities to cultivate environmental awareness among teachers and students in the school.

3. Work Requirements

1. Strengthen organizational leadership and clarify job responsibilities

In order to ensure the implementation of the "Energy Saving and Emission Reduction School Action" and achieve practical results , established the “Energy Saving and Emission Reduction School Action” leading group. Mainly responsible for organizing, inspecting and implementing energy conservation and emission reduction in each school. Each member has clarified their work responsibilities and implemented them at all levels. With the theme of "green and harmonious", they actively carry out energy-saving and emission-reduction school actions through publicity and mobilization, formulation of measures, implementation and promotion, inspection and improvement, and consolidation of development.

2. Carry out publicity and education to enhance the awareness of conservation among all employees

(1) Within one month at the beginning of each semester, arrange a speech on the theme of "Energy Saving and Emission Reduction School Action" under the national flag.

(2) Arrange a class meeting with the theme of "Energy Saving and Emission Reduction School Action" every semester.

(3) Each semester, use the National Energy Saving Publicity Week, National Urban Water Saving Publicity Week, World Environment Day, Earth Day, Water Day, Land Day and other opportunities to launch an "Energy Saving and Emission Reduction School Action" Topic bulletin board.

(4) During the teaching process, each teacher should educate students on energy conservation and emission reduction in a timely manner, so that the concept of energy conservation and emission reduction can be deeply rooted in the hearts of the people.

(5) Issue energy conservation and environmental protection initiatives to all teachers and students in the school

At the beginning of each semester, the Youth League Committee and the Student Union should launch an initiative to all teachers and students in the school: energy conservation and emission reduction, start with me. It is recommended that all teachers and students in the school choose a scientific, reasonable and energy-saving green lifestyle without lowering their current living standards. Starting from the six aspects of daily life, including clothing, food, housing, transportation, and use, start from every aspect of life, change unreasonable consumption patterns, advocate a frugal, scientific and civilized lifestyle, and form a policy of saving resources, reducing pollution, and protecting the environment. social atmosphere.

(6) Create a campus culture of energy conservation and emission reduction

Use radio, blackboard newspapers, tabloids, slogans and other methods to carry out energy conservation and environmental protection publicity activities among teachers and students to create a good Atmosphere. Enrich energy saving and environmental protection education content in school education and teaching, and incorporate energy saving, water saving, electricity saving, food saving, material saving and other educational content into school classroom teaching in the form of comprehensive practice, and truly implement energy saving and environmental protection into schools and into classroom. The school organizes energy conservation and environmental protection knowledge competitions to help students establish awareness of energy conservation and emission reduction.

(7) Comprehensively adopt energy conservation and emission reduction measures. According to the actual situation of the school, we carry out the activity of "saving every drop of water, every kilowatt hour of electricity, every grain of food, and every piece of paper" to save resources and protect the environment. Encourage students to develop the good habit of stopping when people walk, turning off lights when people leave, putting writing paper into baskets and buckets, and recycling.

3. Promotion and use of building energy conservation, equipment energy conservation and energy-saving products

Every infrastructure project carried out by the school is based on clear requirements for building standards, construction technology, building materials and equipment. Environmental protection requirements ensure that every infrastructure project of the school meets the national energy conservation and environmental protection requirements; the school’s newly purchased equipment, parts, and consumables all meet the national environmental protection and energy conservation requirements. From June 1, 20XX, procurement with energy conservation approval will be used Application form. Planned elimination and renovation of some severely damaged, aging, and overused equipment in an effort to reduce energy consumption; promote the use of energy-saving equipment such as solar energy, geothermal heat, and heat pumps in places where energy consumption is concentrated, such as student dormitories and canteens. Street lighting should use energy-saving lamps as much as possible, and spotlights should only be turned on during major festivals.

5. Energy saving in offices and classrooms and corridors

Each office using electric heaters and electric stoves must declare them to the school, and they can only be used after the school has reviewed and approved them. Turn off your computer when you are off work and turn off your computer or monitor during class. An evaluation of office energy-saving and emission-reduction effects is conducted every six months. All grade offices are ranked according to the amount of electricity consumed per capita. The top five offices write instructions and corrective measures, and the bottom five offices are given appropriate rewards. Other offices are also ranked according to the amount of electricity consumed per capita. The top three offices will write instructions and corrective measures, and the bottom five offices will be given appropriate rewards by the school. Classrooms are important places for energy conservation, and the head teacher must take measures to reduce classroom electricity consumption. Make sure the lights go out when people leave, and there are fewer people and fewer lights.

Do not turn on the lights during the day on sunny days, especially in classrooms with no offices next to the corridor. Turn off the lights when no one is walking around the corridor. Students are not allowed to use the public power supply in the classroom to charge or use electricity for various types of electrical appliances that are charged privately. Classroom energy-saving and emission-reduction effects are evaluated every six months. Classrooms are sorted according to their total electricity consumption. The head teachers of the top classrooms write instructions and corrective measures. The school teachers of the bottom classrooms are given appropriate rewards and awarded "Energy Saving" The honorary title of "Advanced Emission Reduction Class Group".

6. Energy conservation in dormitories, canteens, and computer rooms, libraries, music classrooms, art classrooms, etc.

Students are strictly prohibited from using power supplies privately in the dormitories. Once discovered, they will be confiscated by the Security Department. Electrical appliances, and students are required to write explanations and reviews. Repeat offenders will be disqualified from living on campus by the school. The water and electricity conservation in student dormitories is included in the assessment of class teachers and internal management personnel. Staff members must be regularly educated on electricity conservation. At the same time, equipment that consumes large amounts of energy or equipment that has aged must be gradually improved. The school will provide financial support for equipment replacement, and the canteen must introduce special energy-saving and emission reduction measures; students' computer rooms, libraries, music classrooms, art classrooms, etc. must turn off the lights in a timely manner.

7. Establish special archives for energy conservation and emission reduction

Information on energy conservation and emission reduction documents, school-related energy conservation and emission reduction measures, supervision inspections and evaluations, etc. will be collected and sorted by each school for special management. .