Project construction implementation plan
An engineering project is a project based on engineering construction and is a one-time engineering construction task as a managed object. The following is the project construction implementation plan I compiled for everyone, welcome to refer to it!
Project Construction Implementation Plan Part 1
In order to effectively improve the flood prevention and discharge capacity of counties in China and protect the people For the safety of life and property, according to the overall plan of "One City, Three Districts" and "Three Rivers and Six Banks", in order to ensure the orderly progress of the barrage project on both sides of the river as planned, this implementation plan is specially formulated:
1. Project Overview
The dam construction project on both sides of the river covers the area above the mouth of the Tongjiang River and below the intersection of the two rivers. The dam is about 320 meters long and is constructed using flap gates. The overall requirements for project construction are: strong flood control capacity, low investment cost, and characteristics of rejuvenating the country. The main work content of the project construction includes:
1. Conduct a thorough verification of the land, graves, and trees in the area surrounding the dam construction, and delineate the scope of requisition.
2. Complete the land acquisition, grave relocation, transplanting of various trees and felling and clearing of miscellaneous trees in the area surrounding the dam site.
3. In accordance with policy regulations and relevant compensation standards that have been issued by the county, fund compensation and distribution for land acquisition, tomb relocation, tree felling and transplanting shall be carried out.
4. Complete the project’s environmental impact assessment, soil and water conservation plan report and other related work.
5. Carry out other preparations for the barrage project.
6. Complete the preliminary design and technical design of the project, and complete the drawing review.
7. Project construction and project supervision bidding.
8. The construction team enters the site for construction.
9. Project completion acceptance and operation.
2. Working Organization
In order to ensure that the project construction is carried out as early as possible and implemented smoothly, the County Party Committee Office and the Government Office issued the "About the Establishment of Yijiang River" on March 8, 2020. "Notice of the Cross-Strait Barrage Project Construction Headquarters" stipulates that the county party committee, deputy county magistrate, and minister of agriculture and industry will serve as the commander-in-chief and be responsible for the overall work of the headquarters; the vice chairman of the county CPPCC will serve as the deputy commander-in-chief, responsible for the daily work of the headquarters and the coordination of project construction. Inspection, arrangement and use and management of funds. The subordinate organizations of the headquarters include:
1. Office:
Director: Responsible for the overall work of the office.
Deputy Director (): Responsible for the daily work of the office, organization and coordination, inspection and implementation, proposing work plans and arrangements, and formulating work measures and plans.
Deputy Director: Responsible for the review of expenses, material procurement, fund allocation and financial reporting, as well as daily office affairs.
Office staff:
Responsible for project quality and technical control, verification of project quantities, and approval of project changes.
Responsible for the drafting of documents and materials, meeting preparation, work reception, uploading and issuing, seal management, report review and submission, coordination and liaison, etc.
Assist, complete relevant affairs work.
2. Land acquisition and grave relocation team:
Team leader:
Deputy team leader:
Member units: Land and Resources Bureau, Housing Management Bureau, Forestry Bureau, towns, townships, and industrial parks
Job responsibilities: Responsible for land acquisition, tomb relocation, tree transplantation and fund compensation review and other work
3. Working technical team:
Team Leader:
Members:
Job Responsibilities: Responsible for the full-process monitoring and verification of project construction quality, approval of project changes, etc.
3. Work Arrangement and Implementation Steps
1. The county Water Conservancy Bureau will take the lead and the urban investment company will cooperate. The dam site selection, survey and survey, and feasibility study report will be completed before April 20, 2020. Preparation work;
2. The County Development and Reform Commission will take the lead, and the Water Conservancy Bureau and the Urban Investment Company will coordinate to complete the feasibility study review, project approval and other related work of the project before May 10, 2020;
3 , the county investment company will take the lead and cooperate with the Water Conservancy Bureau to implement and determine the preliminary design unit of the project before the end of April this year, come up with the preliminary design plan before June 10, and complete the preliminary design review work before the end of June;
4 , The County Environmental Protection Bureau is responsible for completing the on-site inspection and monitoring of the project and the preparation of the environmental impact assessment report before May 30, 2020; 5. The County Water Conservation Bureau is responsible for completing the project before May 30, 2020 Preparation of soil and water conservation plan report;
6. The county land and resources bureau, town, township, and industrial park management committees will cooperate to complete the survey and scope definition of land acquisition around the dam before May 10, 2020; Complete the land acquisition procedures before May 20, and complete the land acquisition fund compensation before the end of May;
7. The county housing management bureau, town, township, and industrial park management committees will cooperate and complete the work before May 20. Investigation and verification of tombs around the dam construction and selection of new tomb resettlement sites. Grave owners will be notified before June 10 to prepare for relocation and financial compensation for relocation will be paid. All tombs will be relocated before July 10;
8 , the County Forestry Bureau is responsible for conducting thorough verification of tree felling and transplanting around the dam before May 15, 2020, completing the approval procedures before May 25, and completing the tree felling and transplanting work before June 20;
9. The county investment company will take the lead in organizing relevant departments to complete the bidding work of the project before August 15, 2020, determine the construction unit, and sign the construction contract;
10. The construction team will enter the project at the end of August site, the project officially started construction (including the protective embankment and its supporting ancillary projects);
11. The headquarters is responsible, and the Water Conservancy Bureau and Chengtou Company collaborate, instructing the construction unit to complete the work before the end of October The first phase of the cofferdam diversion project will be constructed. The foundation clearing of the barrage and the civil engineering of the pump room will be completed by the end of November. The first phase of dam construction and the installation of gate and pump room equipment will be completed by the end of December. The foundation clearing of the second phase of the project will be completed by the end of January. Complete the second phase of dam construction before the end of the month, complete the installation of the second phase gate and pump room equipment before the end of March, and complete the overall project before April 15; 12. Finish the project before the end of June. Acceptance and handover work;
14. The headquarters office should conscientiously carry out various preparations, tracking services, supervision and inspection work in the early, middle and late stages of project construction according to the above implementation steps, and increase the supervision and inspection work of the project construction. Guidance and management efforts.
IV. Project budget estimate and fund use
The project will be constructed in accordance with the design plan requirements reviewed and approved by the county government. The urban investment company and relevant departments will be responsible for making project budget estimates and The urban investment company is responsible for reviewing the allocation and supervising the use.
V. Work measures and requirements
1. Strengthen leadership.
The requirements for the personnel transferred to the headquarters are relatively stable, ensuring that they are on the job, that people are present, that they are attentive, that time is available, and that energy is available, and that all tasks are implemented in accordance with their respective responsibilities.
2. Pay close attention to progress.
Each member unit and working group of the headquarters must draw a work flow chart according to the time schedule and work implementation plan requirements, and report the work progress of the month to the headquarters in writing before the 25th of each month, and submit the following at the same time Monthly work arrangements and plans.
3. Strengthen scheduling.
In principle, the headquarters holds a work scheduling meeting once a week. Each working group reports on the work progress of the previous week, coordinates and resolves difficulties and problems that arise during the progress of the project, and studies and deploys work plans and arrangements for this week.
4. Clarify responsibilities.
Every job is subject to a countdown assessment. Responsibilities are detailed to member units and tasks are assigned to individuals. Responsibilities are clear, methods are correct, measures are appropriate, procedures are in place, and completed within a time limit, and the tasks are completed by the headquarters. The office is responsible for supervision and inspection.
5. Coordination.
All member units and working groups of the headquarters must carry out their work under the unified leadership of the headquarters, establish an overall concept, support each other, and cooperate closely to form a synergy and complete all tasks.
6. Clear rewards and punishments.
All member units and working groups of the headquarters should proactively do a good job according to their respective work responsibilities, promptly handle and resolve various conflicts and disputes that arise during work, and ensure the smooth progress of project construction. Member units and individuals will be rewarded and punished based on their work completion.
Project Construction Implementation Plan Part 2
In order to implement the spirit of the State Council's "Notice on Further Promoting the Construction of National Green Channel Projects" (Guofa [20XX] No. 31), we must ensure that the project is completed on time. In order to complete the construction tasks of the Xiyan Expressway greening project of the city's green channel with quality and quantity, this implementation plan is specially formulated according to the "Xi'an Main Highway Greening Belt Project Master Plan".
1. The importance of project construction
The construction of the Xiyan Expressway Green Channel Project is a major measure to implement the strategy of "Developing the West and Development of Xi'an". It is our It is an important part of the nine trunk highway green channel network projects implemented by the city. It is also an important way to improve the ecological environment, beautify the ancient city of Xi'an, improve the quality of life of urban and rural residents, and meet the sustainable development of social economy. The implementation of this project will not only increase the city's green space and reduce atmospheric pollution from various waste gases and dust, but also promote the adjustment of the agricultural industry structure in the areas along the line and promote the healthy development of the two civilizations.
2. Guiding ideology and principles of project construction
(1) Guiding ideology
To implement Jiang’s instructions to rebuild a northwest region with beautiful mountains and rivers The spirit and Zhu's requirements of "mobilizing the broad masses of the people, planting trees and grass, and improving the ecological environment" are used as guidelines, with the protection and improvement of the urban ecological environment as the center, and the construction of high-standard and multi-benefit ecological public welfare forests as the means. With the purpose of realizing beautiful mountains and rivers and promoting urban and rural economic development, we will give full play to ecological, social and economic benefits and promote the sustainable development of Xi'an's economic and social undertakings.
(2) Principles
1. Adhere to the principle of unified planning, unified supply of seedlings, and organized implementation by counties.
2. Adhere to the principle that land ownership remains unchanged and is settled by districts, counties, townships (towns) and villages.
3. Adhere to the principles of choosing the right tree for the right site, giving priority to quality, and combining greening and beautification.
4. Adhere to the principle that the country, collectives and individuals work together, whoever greens the greening owns it, whoever invests benefits, whoever operates it benefits, or do not plant ownerless trees or create ownerless forests.
3. Main construction contents
(1) Construction scope
Xiyan Expressway has a greening mileage of 42.6 kilometers (4.5 kilometers of road section to be greened under construction) , including 9 kilometers in Yanliang (4.5 kilometers to be greened), 16.5 kilometers in Gaoling, 8.6 kilometers in Baqiao, and 8.5 kilometers in Lintong. The width of the forest belt is 10 meters outside the barbed wire fence, and the total area of ??the forest belt is 1,278 acres.
(2) Construction period and tree species configuration and planting requirements
1. The project tasks shall be completed before the end of March 20XX.
2. According to the project construction principles, the tree species configuration is: plant a row of Luan trees 0.5 meters outside the wire fence, with a spacing of 3 meters; plant 4 rows of poplars 2 meters away from the Luan trees, with a spacing of 2m to 2m. The poplar varieties are 107 poplar and triploid poplar tomentosa, which are required to be planted into pure forests according to the varieties.
3. Seedling specifications: The seedlings are required to be more than 3.5 meters high, with a ground diameter (diameter at breast height of the Luan tree) of more than 2.5 centimeters, strong growth, straight ends, and no harm from diseases and insect pests.
4. Planting requirements: Use high-quality seedlings, dig large pits, plant large seedlings, and arrange the row spacing between plants in a "pin" shape. The specifications of the planting pit are 60?60?60 cm. Pour the bottom water before planting, and after planting, pour enough water to ensure the seedlings germinate and survive. Paint the trunk 1.2 meters below with white.
(3) Seedling requirements
The project requires 199,000 seedlings, including 171,000 poplar trees and 28,000 luan trees (see Appendix 1 for details) . The divisions and counties are as follows:
1. Yanliang District has a greening mileage of 9 kilometers and requires 42,000 seedlings, including 36,000 poplar trees and 6,000 luan trees.
2. Gaoling County has a greening mileage of 16.5 kilometers, requiring 77,000 seedlings, including 66,000 poplar trees and 11,000 luan trees.
3. The greening mileage of Baqiao District is 8.6 kilometers, requiring 40,000 seedlings, including 34,300 poplar trees and 5,700 luan trees.
4. The greening mileage of Lintong District is 8.5 kilometers, requiring 40,000 seedlings, including 34,300 poplar trees and 5,700 luan trees.
IV. Investment Allocation Plan
This project is an important part of the beautiful mountains and rivers project and an important task in the construction of green channels in our city. The project is planned by each district and county in accordance with the unified plan. To organize and implement the project, the municipal finance will provide appropriate financial subsidies, with planting and management fees of 35,000 yuan per kilometer subsidized. In order to ensure the quality of the project, all seedlings are provided by the city's modern comprehensive nursery.
The total investment of the project is 3 million yuan, including 1.1076 million yuan for seedlings (26,000 yuan per kilometer), 1.491 million yuan for district and county planting and management subsidies, 60,000 yuan for technical guidance, and 60,000 yuan for supervision. 70,000 yuan, management fee of 50,000 yuan, design fee of 21,400 yuan, and unforeseen fee of 200,000 yuan (for the increase in seedlings and replanting of seedlings caused by irresistible natural disasters, etc.).
Subsidies for different counties and road sections are as follows:
1. The greening mileage of Yanliang District is 9 kilometers, with an investment of 315,000 yuan.
2. Gaoling County has a greening mileage of 16.5 kilometers, with an investment of 577,500 yuan.
3. The greening mileage of Baqiao District is 8.6 kilometers, with an investment of 301,000 yuan.
4. The greening mileage of Lintong District is 8.5 kilometers, with an investment of 297,500 yuan.
V. Guarantee Measures
(1) Strengthen leadership and raise awareness
Relevant districts and counties should attach great importance to the construction of the Xiyan Expressway Green Channel Project and This project is placed on the important agenda. We must stand at the strategic height of the Western Development and fully understand the significance of implementing this project. It is necessary to widely publicize and mobilize, organize all forces to invest in the construction of the Xiyan Expressway green channel project, and strive to achieve new and better results.
(2) Establish and improve the technology and quality assurance system
The Municipal Forestry Bureau transferred 6 to 8 professional and technical personnel from the Municipal Forestry Station to form a technical guidance and quality supervision team to be responsible for technical guidance , seedling evaluation and quality supervision and other work. All districts and counties should set up corresponding institutions to carefully control the quality of projects under the guidance of municipal supervisors. The procedure of digging the planting pit first and then transporting the seedlings for planting is strictly prohibited. The seedlings must be raised on the same day, transported on the same day, and planted on the same day. After planting, water enough to ensure the survival of the seedlings.
(3) Carefully inspect and accept, and actively carry out implementation
All districts and counties must make various preparations for construction such as ideological mobilization and land adjustment before the end of February. In early March, the masses were mobilized to carry out planting activities to ensure that the task was completed on time. At the end of June 20XX, the city will organize relevant departments to conduct inspections and acceptances, commend and reward those who have completed well; give notices and criticisms to those who have completed poorly, complete tasks within a time limit, and hold relevant leaders accountable. After inspection and acceptance, all districts and counties must carry out replanting in autumn for road sections with low survival rates, and the city will no longer provide subsidies. Regardless of the type of land, it is strictly prohibited to interplant high-stem crops in forest belts to ensure planting results.
(4) Establish management and protection responsibilities and consolidate afforestation results
All districts, counties, towns and villages should formulate practical management and protection measures and implement management and protection responsibilities based on their actual conditions. In the future, all counties, townships and villages where local governments are responsible for road greening land can implement the policy of farmers voluntarily releasing the land, the state sprouting seedlings, individual contracting for afforestation management and protection, and the profits going to themselves, and whoever afforestation benefits. Auctions, contracts, counter-leasing and subcontracting can also be used to solve the problem of project land use. It is necessary to mobilize the enthusiasm of all parties to participate in project construction by clarifying property rights and clarification of responsible persons to consolidate the results of afforestation.
Project Construction Implementation Plan Part Three
In order to further strengthen the ideological and moral construction of teachers and students of our school and promote the harmonious and healthy development of all work in our school,
According to the "Opinions of the County Party Committee and County Government on In-depth Implementation of the "Four Virtues" Project to Promote the Moral Construction of Citizens in the County" and the spirit of Xinjiaofa [20XX] No. 43, combined with the actual education of our township, this implementation plan is specially formulated.
1. Guiding ideology
Conscientiously implement the spirit of the XX National Congress of the Party and the X Plenary Session of the XX Central Committee, adhere to the scientific outlook on development as the guide, and build the socialist core value system as the foundation, Focus on enhancing the awareness of integrity and responsibility.
In the next few years, the "Four Morals Project" will be implemented in depth among teachers and students in the school, and the social ethics, professional ethics, family virtues, and personal moral education of teachers and students will be continuously strengthened. Infiltrate the "Code of Professional Ethics for Primary and Secondary School Teachers" and "Code for Primary and Secondary School Students" into daily study and work life, transform them into conscious actions, guide teachers and students to develop good moral qualities and behavioral habits, and contribute to the health, harmony and well-being of our school. Provide solid ideological guarantee and spiritual support for sustainable development.
2. Activity goal requirements:
The next three years will be regarded as the "moral construction promotion year", based on the actual situation of our township, and extensively carry out "charity, sincerity, filial piety, The construction of the "Four Virtues Project" with benevolence and morality as its main content strengthens the social morality, professional ethics, family virtues and personal moral education of teachers and students in schools. By carrying out various forms of learning, education and moral practice activities, we promote a group of advanced models and guide teachers, students and employees to start from themselves, start from the small things around them, and learn from the role models around them. The basic requirements of studying diligently, rigorously and diligently; being brave in innovation and forging ahead; being indifferent to fame and fortune, and having high ambitions permeate into daily study and work life, and vigorously promote dedication, honesty and trustworthiness, filial piety and love for relatives, helping others, and courageous acts of justice. ? Civilized customs, develop good moral qualities and behavioral habits, and promote the harmonious development of all work in the school.
3. Improve the organization
In order to implement the "Four Virtues Project" in a thorough, solid and effective manner, effectively implement the activities and achieve practical results, after research and decision, we decided to establish an activity leading group.
Team leader: Liu Xiangjun
Deputy team leader: Tang Wenfa and Sun Xinze
Members:
Feng Shouliang, Hao Hongzhen, Zhang Guangmin, Liu Yupo, Gao Wenshen
Cui Jinchao, Liu Cangzhu, Hao Jijun, Fan Chuanbo, Chuanqiang
Each primary school should establish a corresponding organizational leadership group.
IV. Implementation steps
According to the unified deployment and requirements of superiors, this activity is divided into four stages, lasting three years:
(1) Study Mobilization Stage (October 20XX)
1. Convene a mobilization meeting, establish a leadership organization, formulate a work plan, and sign a "Four Morals Project" personal responsibility letter.
2. Organize the study of the spirit of superior documents, study the series of books on traditional Chinese virtues and virtues, concentrate the study time on no less than 40 hours, and record personal study notes on no less than 4,000 words.
3. Construct learning content around the "Four Virtues", write experiences and experiences, and conduct learning exchanges.
4. Organize and sing the "Four Virtues Song" among teachers and students in the school; hang promotional slogans on campus; distribute proposal letters to all teachers and students, etc., and focus on publicity and reporting.
(2) Organization and implementation stage (November 20XX to February 20XX)
1. Strengthen the construction of teacher ethics and ethics with "Five One" activities
Carry out a reading experience evaluation activity with the theme of love and responsibility to test learning results and enable them to learn something from reading, understand something from what they learn, and do something from what they learn.
Organize and hold a "How to be a happy teacher" theme speech activity to find happiness around you and set an example of teacher ethics around you.
Promote a theme activity in depth. That is, "Be a happy teacher, create a happy life" theme practice activities, through democratic evaluation, student and parent satisfaction evaluation, job announcements, teachers' public commitments, professional ethics lectures and psychological counseling activities, to stimulate the sense of responsibility and mission in teaching and educating people, Create a positive and positive atmosphere for teachers.
In conjunction with the main line of school teaching work, a series of teaching activities are carried out. Actively build a platform for teachers’ self-presentation and development, help teachers improve their education and teaching standards, promote professional growth, and enhance teachers’ sense of professional accomplishment.
Organize a series of cultural and sports activities for faculty and staff. We care about the physical and mental health of faculty and staff, embody humanistic management feelings, organize faculty and staff to actively exercise during class breaks, guide faculty and staff to continuously adjust their mentality, and ensure that faculty and staff devote themselves to education and teaching with abundant energy.
2. Carry out a series of themed educational activities on “cultivation of morality and practice of love” among students.
Combined with the moral education work of various schools in our township, the theme of each month is determined, forming a new situation of moral education with themes every month, focus every week, and content every day.
The moral education themes of each month are:
November: Civilization and Manners Month
(1) Hold a "Four Morals" education themed class meeting. Each class designs age-appropriate theme class meetings with diverse forms, lively content, easy-to-understand, and interesting content, so that students can understand the content of Four Morals education and understand the significance of implementing the "Four Morals Project" activities.
(2) Participate in the "Love Adoption" action, organize students to personally claim a tree, a green space or a public facility in the school or community, and use rest days and holidays to carry out voluntary maintenance, manage.
(3) Hold the "Lei Feng Spirit Accompanying Me" series of practical activities: require children to start with small things around them, bring a cup of tea to their parents on Sundays and holidays, wash their feet, and cook a meal. Make small gifts of gratitude; use weekends or after-school time to carry out "Go to nursing homes and care for the elderly" and "I show love to old teachers" activities to visit and express condolences.
(4) In conjunction with the National Safety Education Week, in the last week of November, we will carry out the "Safety with Me" and "Create a Safe Campus" safety education activities.
In December, civilized flowers bloomed all over the campus
(1) Launch the "Little Environmental Protection Guardian" action. Each class organized a special blackboard newspaper to actively promote environmental protection knowledge, advocate energy conservation, emission reduction, and low-carbon life, educate students to consciously protect the environment, conserve resources, beautify their hometown, and supervise and report environmentally damaging behaviors
(2) Each class organizes students to study the "One Day Routine" and "Daily Behavior Standards for Primary School Students" seriously, and holds a knowledge competition to integrate moral education into the competition activities so that students can understand its spiritual essence.
(3) Carry out the "I act, I show" activity. Organize educational practice activities such as "a song before class", "read good books, sing good songs, be a good person", "recite Chinese classics", and watch videos on civilized etiquette to educate students on civilized etiquette and behavioral habits. , enable students to develop noble ideological qualities and good moral sentiments.
January 20XX? Labor is the most glorious and studying is the happiest
(1) Carry out competitions in folding clothes, tying shoelaces, and sewing sandbags to educate students that hard work is glorious and laziness is shameful. .
(2) Hold a good book recommendation activity. On the basis of motivating students to read more, read good books, take notes, and write about their experiences, recommend the good books they have read to their classmates.
(3) Convene a parent-teacher meeting. Improve the parent committee system, actively expand channels for moral education, and form an educational network for mutual communication and cooperation between schools, families and society.
March-April 2013? Appraisal and commendation month.
(1) Using the evaluation of "Star Civilized Classes" and "Star Civilized Students" activities as a carrier, a summary of the moral education work stages is carried out in the form of a combination of student self-evaluation, mutual evaluation and teacher evaluation.
(2) Organize students to use the summer vacation to carry out various activities with moral education characteristics.
(3) Summary and improvement stage (March 20XX to April 20XX)
Conduct self-examination and summary of the activities, identify deficiencies, and formulate next work goals and tasks .
(4) Long-term mechanism stage (May 20XX---)
Further improve the "Four Virtues Project" system, deepen the construction of "Four Virtues Project", and establish the "Four Virtues Project" German engineering? Build a long-term mechanism to normalize work.
V. Implementation requirements
(1) Strengthen organizational leadership. The school established an activity leadership group to clarify work responsibilities. According to the implementation plan, measures will be strengthened, goals will be clarified, and breakthroughs and integration points will be selected to ensure the effective development of all work.
(2) Improve the working mechanism and strengthen assessment management. Based on the actual situation of the school, we will further improve the teacher ethics assessment and evaluation mechanism, strictly implement the teacher ethics assessment "one vote veto", strengthen supervision and inspection, and standardize teachers' teaching behavior in accordance with the law.
(3) Strengthen typical training. Pay attention to cultivating and discovering moral models and advanced figures. Select teachers and students as role models for a series of activities who are liked by students, admired by colleagues, and satisfied by leaders, set up advanced models, and create a good working atmosphere.
You may also like:
1. Engineering construction project implementation plan
2. 2017 key project construction implementation plan
3 . Project implementation plan format
4. Construction project implementation plan sample
5. Project construction work implementation plan in 2017
6. Engineering project implementation plan sample< /p>
- Related articles
- Sixteen-character policy for rural revitalization
- Sports Bureau: By 2025, social football venues will be fully open. Is this useful for the development of youth football?
- Slogan of Japanese enterprise mold workshop
- Hard-pen calligraphy, with the theme of "My Chinese Heart", copy a poem or phrase that reflects patriotism. Psalms asking for "My Chinese Heart"
- Owner's exit slogan
- Lenovo posted slogans.
- Why go to Putuo Mountain to pray?
- Active atmosphere plan of insurance company.
- What are some warm reminders for sinks?
- A certain bureau’s work plan on biological control topics