Party A: (Employer)

Party B: (Contractor)

On the basis of equality, voluntariness and consensus, and on the principle of mutual trust, Party A and Party B have reached the following agreement on the hydropower project of Party A..

Article 1: Project overview 1. Project location: Goumen Village, Liqu Town, Baota District, Yan 'an City. 2. Project contracting mode: the contractor undertakes the cleaning work, and the materials are purchased by Party A. 3. The construction period is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 2: Material Supply Agreement 1. The materials supplied by Party A in this project shall be qualified products that meet the requirements and delivered to the site on time. Party B shall go through the acceptance formalities. If there is any quality problem or specification difference, Party B shall promptly raise it with Party A, and Party A shall replace it in time. 2. The decorative materials supplied by Party A shall be used in this project, and shall not be used for other purposes without Party A's consent. If Party B violates this regulation, Party B shall pay Party A double the material fee.

Article 3: Agreement on Project Quality and Acceptance 1. This project strictly implements the national Code for Construction of Residential Decoration Engineering GB-200 1 and Code for Quality Acceptance of Building Decoration Engineering GB-200 1, and refers to other local standards and quality evaluation and acceptance standards. 2. If quality problems are caused by Party B's own reasons, such as poor technology and weak sense of responsibility, Party B shall bear the cost of rework and materials. 3. Project completion: Party B shall notify Party A of the acceptance in advance and go through the acceptance procedures. 4. The construction scheme of this project is designed by Party A. ..

Article 4: Site Management Agreement on Fire Prevention in Work Safety 1. Strictly abide by the stipulated decoration construction time, reduce construction noise and reduce environmental pollution. 2. Without the consent of Party A and the approval of relevant departments, the original building structure and various equipment and pipelines shall not be dismantled and changed at will during construction. 3. Ensure that the decoration site is clean and tidy, and do a good job of cleaning and handling before completion. 4. Party B shall cooperate with Party A to keep the construction materials and prohibit other personnel from entering the site. 5. Without Party A's permission, Party B shall not take any decoration materials provided by Party A out of the house. In case of theft, Party B shall pay double indemnity according to the material price. 6. During the construction period, Party B's personnel are not allowed to smoke near wires, cables and flammable materials, otherwise 500 yuan will be fined. ,

Article 5: Project payment method, contract content and settlement agreement 1, and the construction personnel shall pay 2000 yuan within 10 days. After the completion of the circuit, 95% of the project payment will be paid after the overall completion acceptance and delivery. 2. The warranty period of this project is 2 years, and 5% of the project payment is the project warranty fund. The warranty period is calculated from the date of signing the completion acceptance. 3. Receipts shall be issued for the capital transactions between the two parties. 4. Project settlement method: the building area is _ _ _ _ square meters. 5. Party B's contracted contents: 1, line slotting, wiring, threading and trench burying; 2, all the garbage in the process of electrical construction site classification and bagging; 3, circuit construction wall, drilling, cutting; 4, switch socket panel installation; 5. Hardware installation; 6. Installation of lamps and lanterns in the later period (crystal lamps are counted separately); 7. Other charging items shall be calculated separately. Article 6: In case of any dispute over the quality of the project, both parties shall settle it through consultation. If the parties are unwilling to negotiate or mediate, or if negotiation or mediation fails, they may bring a lawsuit to the people's court in accordance with the provisions of this contract.

Article 7: Modification and dissolution of the contract 1. After this contract is signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after consultation. Before the signing of the contract, if one party wants to terminate the contract, it should put forward in writing, pay liquidated damages at% of the total contract price, and go through the termination procedures. 2. In the process of construction, if either party promises to terminate the contract, it shall give a written notice to the other party, and both parties agree to go through liquidation procedures, conclude a termination agreement and terminate the contract.

Article 8: Other agreements 1. If the construction period is delayed due to force majeure or unforeseeable factors such as weather and power failure, it can be postponed after confirmation by both parties. 2. Before entering the site, Party A may require Party B to cooperate with other types of work on site for cross construction. 3. During the warranty period, Party B shall repair the quality problems caused by Party B's construction equipment free of charge and must arrive at the site within 48 hours after receiving the notice from Party A.. In case of problems caused by Party A's improper use or force majeure, quality objection of main materials and products purchased by Party A, or unforeseen reasons, Party A shall pay the maintenance fee to Party B according to the actual cost.

Article 9: Supplementary Provisions 1. This contract shall come into effect after being signed (sealed) by both parties, and shall be terminated after the performance of the contract. 2. After this contract is signed, the project shall not be subcontracted. 3. This contract is made in duplicate, with each party holding one copy. 4. This contract is valid until _ _ _ _ _. 5. The warranty period of this project is 2 years. After the warranty period, Party B shall pay Party A the corresponding maintenance expenses. ..

Party A's signature (seal) and Party B's signature (seal)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model essay 2 on the protocol of installation circuit

Owner (hereinafter referred to as Party A): Yunnan Honghe Power Transmission and Transformation Engineering Company.

Contractor (hereinafter referred to as Party B):

In order to ensure the safety of people, power grid and equipment during the construction of the project, Party A and Party B hereby sign this agreement in accordance with the Safety Production Law of People's Republic of China (PRC), the Labor Law of People's Republic of China (PRC), the Interim Provisions of the State Electricity Regulatory Commission on the Investigation of Power Production Accidents, the Regulations on Safety Production of China Southern Power Grid Corporation and the Regulations on Power Safety.

In addition to clarifying the safety responsibilities of both parties, this agreement should also add safety matters that need attention according to the safety technical requirements and characteristics of each stage (such as civil engineering, installation, debugging, aerial work, power outage, live work, etc.), and clarify the obligations and responsibilities of both parties in improving personal safety and construction safety. ) and strictly abide by the agreement. When necessary, it must be reiterated and clarified in the written safety technical disclosure at each stage, and signed by both parties.

1. Project name: 220kV Da 'nan primary and secondary transmission line project.

2. Project address: Guanjiashan, Gejiu City

Three. Project scope: 1, n 1? N 10 installation tower

Four. Term of Agreement: This Agreement shall come into effect simultaneously with the project construction contract (from June 30th, XX to July 30th, XX).

Verb (abbreviation of verb) Safety responsibilities of both parties:

1. Party A and Party B must conscientiously implement the safety guidelines, policies and rules promulgated by People's Republic of China (PRC), China Southern Power Grid Corporation, Yunnan Power Grid Corporation and local safety production authorities, and strictly implement labor protection laws, regulations and rules, as well as the Regulations on Safety in Production, Regulations on Safety in Construction Projects and Regulations on Safety in Production in Electric Power Industry.

2. Party A and Party B must strictly implement the regulations on fire safety. Smoking and open flames are strictly prohibited in inflammable and explosive places, and fire fighting equipment is not allowed to be used for other purposes.

3. During the construction period, Party B shall designate a special person to be responsible for the safety supervision and management of this project; Party A shall assign special personnel to check the implementation of safety production rules and regulations on the construction site at any time.

4. During the contract period, Party A and Party B must earnestly perform their respective safety responsibilities to ensure the safe and civilized construction of the project.

5. Party A's safety responsibility

5. 1 Review Party B's qualification and confirm that it meets the following conditions:

5. 1. 1 Hold the business license and qualification certificate issued by relevant departments; Holding the identity certificate and power of attorney of the legal representative; Have a construction resume and nearly 3 years of safety construction records.

5. 1.2 The configuration and certificates of relevant responsible persons, engineering and technical personnel and special operations personnel meet the requirements of safe production within the validity period.

5. 1.3 Equipped with machinery, tools, safety protection facilities and safety appliances that meet the needs of safety production.

5. 1.4 The safety management system should be complete. Including the safety operation rules of each type of work, the certified assessment system for special operators, the post responsibility system for safety production at all levels, regular safety inspection and safety education system.

5. 1.5 The contractor with two-level organization has full-time safety management organization; More than 30 construction teams are equipped with full-time security officers; People under the age of 30 have part-time security officers.

5.2 Before starting work, conduct a comprehensive safety technical disclosure to the project leader, engineering technology and management personnel of Party B, point out the safety matters that should be paid attention to in the construction, and make records and relevant materials.

5.3 When working in dangerous power production areas, in case of fire, explosion, electric shock, falling from high altitude, poisoning, suffocation, mechanical injury, burns, landslides and other places that are likely to cause personal injury and equipment accidents, it is necessary to make safety technical disclosure in advance, and ask Party B to formulate safety regulations in combination with the actual project? Four bars? (organization, safety, technology, civilized construction measures), and carefully review, right? Four bars? If it is unqualified, Party B is prohibited from starting work.

5.4 Party A shall set up obvious safety signs, warning signs and fences (excluding fences and signs set by Party B) at dangerous points and live parts of the construction site.

5.5 Inspect Party B's construction site at any time, stop and correct the behaviors of Party B's personnel in violation of relevant safety production rules and regulations in production, and issue a written rectification notice; For serious violations, immediately order them to stop working.

5.6 Implement other matters related to safety and labor specified in the project contract.

Formulated by Party B according to the project construction? Four bars? (Safety, organization, technology and civilized construction measures) Construction shall not be started without Party A's approval ... It must be modified according to Party A's requirements and approved by Party A before construction preparation can be carried out.

6. 1 Before starting work, the project leader must make a comprehensive safety technical disclosure to all construction personnel, and combine? Four bars? Conduct on-site safety education, so that all construction personnel can master the engineering characteristics, all safety measures and safety precautions.

6.2 The project leader shall not leave the work site during the construction. For complex or dangerous projects, he shall personally conduct on-site supervision and keep in touch with the on-site supervision of Party A. ..

6.3 In the process of construction, the Safety Work Regulations for Electric Power Construction and the Safety Work Regulations for Electric Power Industry must be strictly implemented, and Party A's safety and civilized production (construction) regulations must be observed. When entering the power production area for construction, the working ticket system must be strictly implemented. Party A's permission must be obtained before starting the work that does not need to use the work ticket.

6.4 All kinds of equipment, instruments and structures used by Party B during the construction period shall meet the construction safety requirements and ensure that the effective inspection period is not exceeded. Check the construction machinery, instruments and safety protection facilities before starting work every day.

6.5 The person in charge of Party B's project shall carefully check the construction area, working environment, operation facilities, equipment and tools, and stop the construction immediately if any hidden danger is found, and the construction can be continued only after the rectification is implemented.

6.6 All kinds of safety protection facilities, fences, safety signs, warning signs and grounding wires set by Party A shall not be removed or altered by Party B without authorization.

6.7 Strictly abide by the Labor Law of People's Republic of China (PRC) and other laws and regulations. Minors and people with occupational taboos are strictly prohibited from entering the construction site to work.

6.8 Special operation (operation) personnel of Party B during the construction period must hold valid certificates.

6.9 Party B shall provide all construction personnel with labor protection articles to ensure safety and correct use.

6. 10 The person in charge of Party B's project must promptly rectify the potential safety hazards and problems raised by Party A during the safety inspection.

6. 1 1 Party B accepts the safety supervision, management and guidance of Party A. During the construction process, Party B's personnel shall timely notify Party A of the unsafe conditions.

6. 12 Party B has the right to refuse Party A's illegal command and force risky operation.

6. 13 If Party B's improper safety measures violate relevant safety rules and regulations and safety matters listed in this agreement, and all accidents or losses are caused to a third party, Party B shall bear the economic losses and legal responsibilities caused thereby.

Six, 5% of the total cost of the project contract as a construction safety deposit. If the site safety management is lax and the responsibility is not in place due to Party B's responsibility, which violates the relevant safety rules and regulations and this Agreement, or causes a safety accident, points will be deducted according to the following terms.

1. When personal accidents, first-class obstacles of power grid, first-class obstacles of equipment and above accidents are caused by the contractor's responsibility, all construction safety deposits will be deducted.

2. 2.5% of the construction safety deposit will be deducted when the contractor causes class II obstacles to power grid and equipment.

3. The contractor's lax safety management on the construction site, inadequate safety responsibilities and failure to perform the terms listed in this agreement will be deducted 0.5% of the construction safety deposit for each item when the safety supervision and inspection personnel of Party A find out.

4. When the construction is completed and there is no safety situation, all the deposit shall be paid.

Seven. This agreement is made in quadruplicate, with Party A and Party B holding two copies respectively, and shall come into force after being signed and sealed by both parties.

Eight. Other matters not covered shall be settled by both parties through consultation.

Unit of Party A: (Seal) Unit of Party B: (Seal)

Representative: representative:

Handler: Handler:

Tel: Tel:

date month year

Fan Wensan, Installation Circuit Protocol

Party A:

Party B:

In accordance with the Contract Law of People's Republic of China (PRC) and relevant laws and administrative regulations, both parties have reached the following terms on the circuit disassembly contract of Party A's production workshop on the principles of equality, voluntariness, fairness and honesty and trustworthiness:

Article 1: Project Overview

1, project location:

2. Project contracting mode: Party B contracts all cleaning work and materials.

3. The construction period is from _ _ _ _ to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Contract Price: The estimated cost of this contract project is RMB (¥). If the construction content and materials change, the project cost should be calculated according to the actual situation.

Article 2: Contents contracted by Party B:

1, slotting, wiring, threading and burying the circuit;

2. Install 6 distribution boxes (each box is equipped with 1 250A automatic air switch, 2 100A automatic air switches, 4 63A automatic air switches, 2 20A automatic air switches and other auxiliary lighting switches).

3. Two power cables (more than 75 square strands of copper core cable) lead to the main circuit of the workshop.

4. Power cord from the distribution box to the machine (the number of cables varies according to the equipment load)

5. Maintenance of all equipment circuits and replacement and installation of damaged parts.

6, lighting power supply and switch socket panel installation

7. Later installation of lamps and lanterns

8. Other charging items shall be calculated separately.

Article 3: Agreement on Project Quality and Acceptance

1, this project should strictly implement the national Code for Construction of Residential Decoration Engineering GB-200 1 and Code for Quality Acceptance of Architectural Decoration Engineering GB-200 1 and refer to other local standards and quality evaluation acceptance standards.

2. If quality problems are caused by Party B's own reasons, such as poor technology and weak sense of responsibility, Party B shall bear the cost of rework and materials.

Article 4: Agreement on site management of fire prevention in production safety.

1. Party B shall cooperate with Party A to take good care of the construction materials and prohibit other personnel from entering the site.

2. During the construction period, Party B's personnel are not allowed to smoke near wires, cables and flammable materials, otherwise 500 yuan will be fined. ,

Article 5: Payment and Settlement Terms of the Project

1. The construction personnel shall pay 30% of the project payment within 10 days (50% of the total area is completed), 30% of the project payment after the circuit is completed, and 10% after the overall completion acceptance and delivery.

Article 6: Settlement of disputes

In case of any dispute over the quality of the project, both parties shall settle it through negotiation; if they are unwilling to settle it through negotiation or mediation, or if negotiation or mediation fails, they may bring a lawsuit to the people's court as agreed in this contract.

Article 7: Modification and Termination of the Contract

1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after consultation. Before the contract is signed, if one party wants to terminate the contract, it shall put forward a written proposal, pay a penalty of 5% of the total contract price, and go through the termination procedures.

2. In the process of construction, if either party promises to terminate the contract, it shall give a written notice to the other party, and both parties agree to go through liquidation procedures, conclude a termination agreement and terminate the contract.

Article 8: Other Agreements

1. If the construction period is delayed due to force majeure or unforeseeable factors such as weather and power failure, it can be postponed after confirmation by both parties.

2. Before entering the site, Party A may require Party B to cooperate with other types of work on site for cross construction.

3. During the warranty period, the quality problems caused by Party B's construction shall be repaired by Party B free of charge and must arrive at the site within 48 hours after receiving the notice from Party A. ..

Article 9: Supplementary provisions

1. This contract shall come into effect after being signed (sealed) by both parties, and shall be terminated after the performance of the contract.

2. After this contract is signed, the project shall not be subcontracted.

3. This contract is made in duplicate, with each party holding one copy.

5. The warranty period of this project is 2 years. After the warranty period, Party B shall pay Party A the corresponding maintenance expenses. ..

Party A's signature (seal) and Party B's signature (seal)