Joke Collection Website - Bulletin headlines - Safety operation procedures for tower crane drivers?
Safety operation procedures for tower crane drivers?
2. Non-drivers are not allowed to operate, and drivers are not allowed to operate when they are drunk or sick.
3. At the beginning of the operation, whistle for warning.
4. Overhaul factories and tower cranes shall be tested after disassembly and reassembly. It can only be used after the technical performance is confirmed.
5. Check the safety and lubrication of all brake parts and structural parts before operation, and check whether all limit devices and safety devices are sensitive and reliable.
6. The tower crane must have reliable grounding, and the shell of electrical equipment should be correctly connected with the body.
7. All safety protection devices and limit switches must be complete, sensitive and effective.
8. Night work, lighting must be good.
9. Strictly carry out the "ten no-lifting" operation. When the tower crane stops, the hook and luffing trolley must be put in the designated position.
10. There shall be no obstacles and local subsidence on the running track of tower crane, and the operation shall be stopped in case of strong wind, thunderstorm, foggy day and unclear sight above level 6.
1 1. The driver works closely with the signalman and works according to the signalman's command.
12. The driver should explain the equipment during the shift, and the successor driver should check and test the equipment before normal work to ensure safety, and should have a shift record.
13. During tower group operation, the first tower crane should be avoided, and the tower company should pay attention to possible problems before and after so as to handle them in time.
14. After the operation, all control switch boards are set to zero position, the power supply is cut off, and the brake box and operation room are locked.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:The essence of the new business model of "barter company"
- Next article:School horoscope slogan
- Related articles
- The best four words are hung in the study.
- Sichuan Miyaluo travel guide
- What does the hotel special room mean?
- Garbage sorting starts with me. Contents of the blackboard poster
- How to arrange the opening ceremony scene?
- Love the country, love the party and love the school slogans
- My husband's grandfather died. Should I call my mother's family to report the funeral?
- Holiday safety slogans
- How to let your QQ signature designee see it?
- School profile, a private experiment in Nanjing