Joke Collection Website - Bulletin headlines - Power Plant Promotion Manuscript (Title of Power Plant Promotion Manuscript)

Power Plant Promotion Manuscript (Title of Power Plant Promotion Manuscript)

Today, the editor will share with you the knowledge of the power plant propaganda manuscript, which will also analyze and answer the title of the power plant propaganda manuscript. If you can solve the problem you want to know, pay attention to this website.

3 minutes a day to get a short article on propaganda and reporting of electric power

In p>29, with the strong support of news organizations and higher authorities, under the guiding principle of "internal cohesion and external image shaping", and under the correct leadership of the Party Committee of the Bureau, we made full use of newspapers, television and other news media to carry out internal and multi-level propaganda work. Showing the good social image of our bureau and the energetic spirit of the broad masses of cadres and workers provides a strong ideological guarantee, spiritual motivation and public opinion support for accelerating the economic development of our bureau and improving social visibility. In 29, our bureau published 134 articles in various news media, including 24 articles in provincial and ministerial news media, 31 articles in prefecture-level news media and 79 articles in county-level news media.

First, raise awareness and strengthen leadership. The improvement of knowledge is the key to improve the quality and level of work. To this end, in view of the fact that some cadres and workers are biased against the news propaganda work, our bureau vigorously publicizes the importance of the news propaganda work through various channels, pointing out that the news propaganda is an important part of the political and ideological work of enterprises, helping everyone to have a correct attitude and correctly understand and treat the news propaganda work. In order to strengthen the institutionalized and standardized management of news propaganda work, our bureau has set up a leading group for news propaganda work headed by the secretary of the Party Committee, issued the Implementation Opinions on News Propaganda Work of * * County Electric Power Bureau, and the Assessment Measures for Information Work of * * County Electric Power Bureau, formulated the assessment management and reward measures for information submission, and defined the guiding ideology and publicity key points.

Second, leaders attach importance to it and encourage employees to contribute actively. In the process of work, bureau leaders attach great importance to information publicity, and emphasize the importance of information publicity at global work meetings and bureau affairs meetings many times, encouraging cadres and workers to actively write manuscripts, and setting an example and taking the lead in writing manuscripts. Through the above measures, "propaganda is also a productive force" has become a global awareness, creating a good atmosphere for the development of information propaganda work.

the third is to build a platform to improve the enthusiasm of employees to contribute. In order to further promote the overall improvement of the quality and quantity of news propaganda work in our bureau, our bureau publishes a monthly issue based on the internal publication of * * Power Information, which timely transmits dynamic information to the grass-roots front line and promotes the exchange of ideas between units. Immediately submit the information generated immediately to the county government and relevant news organizations. For major events and important information, our bureau immediately contacted the news section of the county propaganda department and the county radio and television station for continuous reporting. For example, this year's spring inspection work, the fourth workers' sports meeting before May Day, etc., have a great influence after being broadcast on TV.

the fourth is to decompose tasks and self-pressurize. According to the overall work focus and the work content of departments and offices and grass-roots power supply stations, the task indicators are decomposed layer by layer, and they are also included as an important content in the annual target assessment category. According to the work practice this year, this move has played a great role in promoting the news propaganda work of our bureau. The enthusiasm of all departments, power supply stations and news propaganda staff is high, and a number of new forces who like propaganda and writing have emerged in the whole situation, and the quality and quantity of manuscripts have also been significantly improved. By the end of December, 29, * * * had received more than 1 news articles, of which 58 were used in * * Electric Power Information, 3 in Gansu Electric Power Newspaper, 3 in Jiuquan Daily and 28 in County Propaganda Department and TV Station.

These achievements can't be achieved without the strong support and correct guidance of leaders, and even more can't be achieved without the attention and care of various departments and offices and news lovers. However, in 29, we still have some shortcomings in the news propaganda work, which are mainly reflected in:

1. We did not give full play to the enthusiasm of the broad masses of workers. The lively and vivid press releases from the grassroots are still insufficient, and they do not better reflect the dedication and style of the frontline workers.

2. Lack of in-depth manuscripts and influential planning and continuous reporting.

3. The communication and contact with the news media is not enough, which needs to be strengthened.

In p>29, the plan and intention of the news propaganda work of the Center are as follows:

1. Introduce a new reward and punishment mechanism to mobilize the enthusiasm of all departments and grass-roots units. Establish a sound assessment mechanism and reward and punishment methods.

2. Dig deeper and launch influential and sensational reports, especially focusing on the packaging and building of service and image brands, and focusing on the shaping and publicity of grassroots advanced models and grassroots employee representatives.

3. Further strengthen the contact and communication with the news media

How to write the propaganda report on the water pressure of boilers in thermal power plants

On X month, under the supervision of professionals from XX Boiler Inspection Institute, the suppression test of boiler X was successfully completed. The completion of this work represents that the installation of pressure parts of boiler X has reached the requirements of specifications and regulations, laying the foundation for the next XXX work.

boiler suppression is an important part of boiler safety inspection, which is directly related to the quality of boiler installation or maintenance, and ensures the smooth operation of the boiler in the future. The personnel who participated in the suppression work included engineers from the Boiler Inspection Institute, representatives of Party A, safety officers, technicians from the installation company, etc.

how to write the introduction of power plant company?

It can be written according to this

Chaozhou Power Plant is a large-scale thermal power plant built after the first project approval in China, which meets or even exceeds various indicators and conditions of environmental protection and soil and water conservation stipulated by the state. In the first phase of project construction, high-efficiency desulfurization and dust removal devices are installed simultaneously, seawater DC cooling water supply mode is adopted, and low-nitrogen combustion technology is adopted, and an online continuous detection system for flue gas is installed. Guangdong Datang International Chaozhou Power Generation Co., Ltd. is located in Zhelin Town, Raoping County, Chaozhou City, Guangdong Province, 6 miles northwest of Chaozhou City and more than 7 kilometers southwest of Shantou City. Chaozhou Power Plant, a holding subsidiary of Datang International, was incorporated on November 15, 23. The company consists of five shareholder units, with share ratios of 52.5% for Datang International, 22.5% for Datang Group, 12% for CLP Huaze, 8% for Wenshan Guoneng and 5% for Chaozhou Xinghua Energy. The installed capacity of the power plant is planned to be 52MW, and the first phase of the project is 2×6MW units, which were put into operation in May and July 26 respectively. The unit capacity of #3 and #4 in the second phase project is 1MW, which is the first two million units of Datang Group and Datang International, and was officially approved for power generation in 21. In the early stage of the project, the feasibility study of two 1MW units in the third phase has been completed, and the environmental assessment is now carried out. Two 1MW units in the fourth phase are being prepared in the early stage.

Five power construction management systems of "project legal person system, bidding system, capital system, contract system and supervision system" have been fully implemented in the project construction, and the management of safety, quality, progress and cost has been strengthened in strict accordance with the power construction goal of "controlling cost, reasonable construction period and reaching the standard for production", and the project construction has achieved gratifying results: the construction of #1 unit took only 23 months and 23 days; No.2 boiler set a domestic leading record of 11 days from heating surface hoisting to water pressure test, and the continuous operation of No.2 unit reached the domestic highest record of 19 days after 168 hours of trial operation. The 75,-ton coal wharf was built in only seven and a half months, and the 1,53-meter breakwater was built in only 12 months. The construction of Chaozhou Power Plant has repeatedly created miracles in Guangdong Province, which is called "Datang Speed" and has been highly praised by the Guangdong provincial government.

the production scale of the existing four units is 3.2 million kilowatts, and the average annual power generation is about 17 billion kwh. After the units are put into production, the goal of "stability and profitability" has been achieved. In 26, the power generation was 2.2 billion kwh, and the profit was more than 3 million. In 27, the power generation was 6 billion kwh, and the profit was 37 million. In 28, the power generation was 7.5 billion kWh, and the profit was 83.9 million. In 21, the profit was nearly 9 million yuan.

The company has more than 3 employees, with an average age of 31. It is a young team.

in terms of life, there are employee apartments in the factory. Employees choose Shantou as their living area, which takes about 7 minutes by car.

after more than five years of hard work and efforts, Chaozhou Power Generation Company has begun to take shape. Guangdong Province is a market-dominant area in the development plans of China Datang Corporation and Datang International, and the desulfurization electricity price tax is .43 yuan /KWH. As the first enterprise of China Datang Corporation to enter the electricity market in Guangdong Province, Chaozhou Power Generation Company will, as always, carry forward the spirit of pioneering and pursuing Excellence of Datang people, shape the image of Datang and create the brand of Datang.

At present, the third phase of the project has been reported to the Guangdong Provincial Development and Reform Commission, and the preliminary work is progressing steadily.

Help power plant speech! ! ! !

Leaders, judges and comrades:

Hello, everyone. The topic of my speech today is "Love and Dedication-Deepening Management-Me and Enterprise Development".

I remember that Lei Feng wrote in his diary: "If you were a drop of water, would you moisten an inch of land?"? If you are a ray of sunshine, do you light up a bit of darkness? If you are a grain, have you nurtured useful life? If you are the smallest screw, will you stick to your life forever? " This sentence tells us that no matter what position we are in, no matter what kind of work we are doing, we should give full play to our ability and make the greatest contribution. Today, when we re-understand the meaning of this passage, we find that it has been endowed with a deeper connotation, that is, dedication and selfless dedication. It's simple to say, but how can we love our jobs and show it in our daily work? Through the dribs and drabs I have experienced in my ordinary job for several years, I have witnessed all kinds of people and things to truly understand his meaning.

To love one's job is to love one's job. Work is not only a means of earning a living, but also a stage, where the knowledge we have studied hard and the abilities we have will be fully displayed. We are lucky that the power plant chose us and gave us a job, a post and a stage to show ourselves. It may be because of our ability or just because we met a good opportunity, but it was not born this way. We should see that there are many talents in society who are better than us who are still rushing to find a satisfactory job. So first of all, we should cherish the job we have, instead of holding an indifferent attitude.

Dedication is to treat one's work as a kind of spiritual enjoyment and fun. His performance in his work is diligence and initiative, self-confidence and innovation. No matter simple or complex, do everything best with the perfect working attitude. In China, there are many models of dedicated workers, such as Li Sufan, Ren Changxia, Xu Zhenchao and Deng Jianjun, who regard work as the pursuit of life and the enjoyment of life. In fact, there are many such people in our power plant and around us. If they don't have love for their work, they don't have persistence and dedication to their work, how can they be so devoted? They are performing their duties in their respective posts and guarding their responsibilities. They carefully monitor every index, and they care for every device. They actively give advice to the team and make suggestions for workshop management. They are the kind of dedicated people who are quiet and unknown.

at this time, you may say that a power plant worker can play a big role. If you don't work hard and I don't love my job, the power plant can still develop. But I want to say, my friend, every worker is a member of the power plant, and the rise and fall of the power plant is closely related to us. An enterprise, like a nation, has its people when it is strong. Therefore, enterprises should be regarded as a source of strength and the support of life, and enterprises should be regarded as life and their fate. As an electric power employee, we deeply know how to grasp our own destiny. Only by working hard, uniting as one, and overcoming difficulties, can our power plant develop and remain invincible.

Love and dedication are reflected in every ordinary working day and every ordinary post. Show your talents and wisdom in your ordinary post and write a brilliant chapter of the power plant with our efforts.

After my speech, thank you.

A safety manuscript for thermal power plants is as follows:

First, it is inseparable from everyone's support to do a good job in secondary safety education.

Article 75 of the Regulations on Safety, Health and Environmental Management of Electric Power Construction stipulates that enterprise safety education and training should be carried out step by step. The secondary safety education responsibility of the leasing branch belongs to each leasing station, and the main responsibility of education is the security officer of the leasing station. In order to have sufficient secondary safety education content, be applicable to the site and serve the operators, the security officer of the leasing station must first learn and understand the safety work rules, regulations, norms and systems, 38 documents related to safety of the company's security department and the corresponding safety and health knowledge. In order to avoid accidents caused by operators' ignorance of operation procedures and misoperation, it is necessary for safety personnel to refine them with the help of the contents of the procedures, so as to be familiar with and support the operation procedures, which are suitable for the site and serve the operators, and the safety personnel can only have capital by "selling their mouths". Doing a good job in secondary safety education is a matter for safety officers, but it needs the support of webmasters and the cooperation of all managers and employees, especially the support of webmasters.

Second, we must ensure the recruitment of good employees:

Article 78 of the Regulations on Safety, Health and Environmental Management in Electric Power Construction stipulates that new employees should be given three-level education and training for not less than 4 class hours, and they will be certified to work after passing the examination. Everyone knows about the safety education for entering the factory, but sometimes there is no work license when checking the documents on the spot. This shows that some people have not participated in the secondary safety education, which seems to be the "dereliction of duty" of the safety officer, but some safety officers do not know about the temporary replacement of the "iron camp soldiers" construction team. Therefore, it is necessary to ensure the good employment. The safety officer shall first identify the new employees in the factory according to the regulations, then carry out the secondary safety knowledge education, and sign the name of the educated. After passing the examination, the safety officer shall arrange the tertiary safety education and sign the certificate formalities.

Third, observe drills to improve employees' safety awareness and quality

A large number of sub-contracting team employees enter the construction site. Because of the high mobility of personnel, and most of them come from rural areas, they have lost their farm tools and become workers, and their education is limited. Some people are still illiterate, so it is not acceptable to give them scripted instructions. It is necessary to organize teachers with practical experience to give on-site teaching and demonstrate the operation of construction machinery, and then scholars can operate on the computer to observe the drills. In the yard of the rental station, scaffolding training is conducted to teach them to understand the rules, operate and handle abnormal faults. Practice has proved that this is very practical and intuitive, which can make the educated enhance their safety awareness and improve their safety prevention ability.

Fourth, talk about safety on the spot and communicate directly with employees:

When the safety officer is on the spot for inspection and supervision, he hears the operators passing messages to each other: Coming! The safety supervisor is coming! At this time, the violator corrects his own violation; If it is found that the operator's safety helmet is not fastened or worn, the safety officer will stop the violation; Sometimes violators give you a 25, saying that the sky can't fall or the house hasn't collapsed. In such a situation, Ann