Joke Collection Website - Bulletin headlines - What effect does adding a layer of oil surface have on highway water stability?
What effect does adding a layer of oil surface have on highway water stability?
Ensure the comfort of driving.
After the construction of water-stable layer is completed, the oil surface can be laid after 7 days. After the construction of water-stable layer is completed, it is necessary to moisturize and water it every day, and cover it with straw bag or felt cloth to moisturize the water-stable layer.
The deflection value test shows that the deflection value meets the design requirements, and other indicators of the water-stable layer also need to meet the design requirements before the oil surface construction can be carried out.
- Related articles
- Where is the barbecue training school? Which is better for barbecue training?
- Can I eat in the morning after colonoscopy?
- Interesting reminders (cinema, reading room, no smoking, elevator, faucet.)
- How to design yourself?
- Excuse me, what's the name of the one with two pearl shirts in Bao Qingtian? The one who tried the king?
- /kloc-Lin Wandong, 0/9 years old and his mother moving bricks at the construction site, was successfully admitted to Tsinghua University. How's it going now?
- Is venom a total villain?
- Ask for the name and slogan of the hiking team
- How to translate English to celebrate Latin Heritage Month?
- Which brand of freezer is of good quality?