Joke Collection Website - Bulletin headlines - Construction of Jiujiang Museum
Construction of Jiujiang Museum
Jiujiang Museum is located on the beautiful Bali Lake in Jiujiang City, covering an area of 25,654.32 square meters, with a total construction area of 1.8 million square meters. It was built with an investment of 65438+200 million yuan by Jiujiang Municipal Government of Jiangxi Province, and designed by Shanghai Architectural Design and Research Institute Co., Ltd. and Jiujiang Architectural Design Institute. The main functions of the museum are academic exchange, cultural relics exhibition, cultural relics technical protection and public service. 20 1 1 When the museum is completed in February, it will become the image project of Jiujiang City.
Jiangxi Construction Engineering No.4 Construction Co., Ltd. is determined to adhere to scientific organization and management, harmonious working atmosphere, exquisite construction technology, civilized on-site management and fast work efficiency in the construction of Jiujiang Museum, earnestly perform the construction contract, strictly follow the drawings, operate according to regulations, and race against time to ensure safety according to the requirements of Jiujiang Municipal Government, so as to achieve safety first, quality first, leading technology and * * * to create fine products. Ensure that the museum project achieves the goal of creating a provincial excellent project and a provincial civilized construction site.
The construction site of Bali Lake Museum project is in full swing, with indoor display design and outdoor wall steel hanging in full swing. Since the start of construction in September, 20 10, the project of the municipal museum has progressed smoothly, the fire protection installation has basically come to an end, the elevator, heating and ventilation, building lighting, strong and weak electricity and other projects have been accelerated, the exhibition halls in Area A and Area B have been stepped up, the steel crane project for the external wall has been fully rolled out, and the fine decoration project is under tender.
As for the progress of the project, the owner, the construction and the supervisor plan ahead of time, quantify the project every day according to the needs of the construction period, and implement it in each shift. According to the schedule, the elevator, heating and ventilation, building lighting, strong and weak electricity and other projects will be completed by the end of this month to ensure that they are all completed and fully opened before the end of this year.
In order to ensure the quality of the project, the person in charge of the project department implements the following supervision system, and conducts uninterrupted inspection every day to find and completely eliminate potential safety hazards in time. The project department also strictly controls the audit, tracks all materials used in the building, and prevents "three no products" from entering the construction site.
As a public * * * cultural project, the Municipal Museum highlights the theme in design, fully excavates the cultural connotation, actively exerts the public * * * service function, and promotes the protection of traditional culture in our city. Area A and area B of the museum are public exhibition area and cultural relics collection research area respectively, covering an area of 9,800 square meters, accounting for more than 50% of the total construction area, covering non-legacy exhibitions, basic exhibitions, collection exhibitions, exchange special exhibitions and other rooms, providing quality services for cultural lovers.
- Previous article:Is there any efficient way to memorize English words?
- Next article:Kindergarten health slogan
- Related articles
- Slogan of life engineering
- No littering signs in toilets
- Overview of Qingdao Intermediate People's Court
- Correct pronunciation of 48 primary school phonetic symbols
- Kindergarten first day lesson plan
- How to write copy for a uremic merchant to send a banner to the urban management
- How to treat the advertising language of WeChat milk tea
- Is Dazhu Feiyue Real Estate Agency Reliable?
- 2022 Anti-Drowning Safety Slogan Banner
- Investigative report on street typos