Joke Collection Website - Bulletin headlines - Ask for the help of a whole set of expressway toll station construction scheme! ! !
Ask for the help of a whole set of expressway toll station construction scheme! ! !
1. Quality control before construction mainly refers to the construction preparation stage. We mainly grasp the following aspects: hold a design briefing. Design units, supervision units, civil construction units, electromechanical general contractors and weighing equipment suppliers * * * attended the meeting to explain the principle of charging by weight, so that construction personnel can understand the requirements of charging equipment by weight for toll squares, toll lanes and toll islands. Go to the site of the construction unit to inspect the recent performance of the construction unit, the composition of the engineering command system, the level of engineering and technical personnel, the quantity and quality of workers, check whether there are qualification certificates for key types of work, whether there are inspection certificates for instruments and meters from the national metrological supervision department, and understand whether the equipment of machines, tools and vehicles can meet the construction requirements. Review the construction organization design, and check whether the quality assurance system, quality field management measures, project progress and safety protection measures of the construction unit meet the requirements of project implementation. By reviewing the equipment and orders, the specifications, models and technical indicators of the equipment procurement contract of the construction unit are reviewed, and whether it meets the requirements stipulated in the contract is carefully checked. Before entering the construction site, the relevant test data and certificates of main materials are checked. Conduct on-site investigation on the construction site, conduct detailed investigation on completed communication pipelines, power pipelines, manholes, machine rooms, foundations and power distribution rooms, and review whether the construction design drawings are complete and correct. 2. Quality control in the construction process 2- 1 In the construction supervision project, the supervision office starts with organizational leadership, manages scientifically, renews the supervision concept and makes bold innovations, so that the project quality, safety and environmental protection are always strictly controlled. Strict process acceptance inspection and supervision office should work out quality acceptance standards for key processes according to design standards and process requirements. This time, our process acceptance has changed the construction unit to take the initiative to apply for inspection according to the engineering construction process, carefully check according to the quality standards of the construction process, sign and recognize the sites that meet the quality requirements, and put forward in time those that do not meet the quality requirements, requiring the construction unit to rectify. If the previous process is unqualified, it is not allowed to enter the next process. Active supervision has greatly eliminated the hidden dangers of engineering quality and the signs of accidents, and also ensured that the completed process passed the one-time inspection and was signed in time, which enabled the project to carry out the construction of the next process smoothly, which not only controlled the quality but also accelerated the progress of the project. In order to establish the key sub-projects or processes of the "model project" system, a toll lane and a toll station should be selected as the model project for demonstration operation. After summing up, the construction unit will put forward standardized construction technology standards, which will be fully promoted after obtaining the consent of the owner and the supervisor. Every working procedure of this project is first piloted at Huai 'an main toll station of Ninglian Expressway, summing up experience and organizing everyone to visit and study, which has achieved good results. Adhere to the on-site supervision and supervision engineer in accordance with the work instructions of the construction unit, the general process can not be omitted, and the key parts should be supervised. For example, the foundation pit size of weighing equipment should be excavated in strict accordance with the manufacturer's drawings, and the pouring concrete label and curing time must meet the requirements. 2-2 The charging project by weight should try to improve the accuracy of weighing equipment and the stability of the charging system by weight, and form the following points in the process of quality supervision. 2-2- 1 The speed to be controlled is directly related to the accuracy of weighing equipment. By testing with measuring instruments, the accuracy of weighing equipment is above 99% when the vehicle is in static test, above 95% when the vehicle speed is 5 km/h, and the accuracy of weighing equipment is greatly affected when the vehicle speed is greater than 5km/h. The measures are as follows: at the exit of expressway, about 500 meters before weighing, set up a sign "Do not accelerate, decelerate or brake suddenly when the vehicle speed is within 5 km/h" to ensure the accuracy of weighing system measurement. Set deceleration markings and deceleration blocks. When installing the speed bump, pay attention to the fact that when the vehicle passes through the speed bump, it will also step on the brake symmetry table when passing through the weighing platform, which will affect the accuracy (speed change). The speed block in front of the weighing equipment is generally not less than 18m. It is suggested that the vehicle speed be displayed on the display screen of the lane industrial computer (according to the interface provided by the current weighing equipment). In this way, the toll collector can report the speed of the vehicle passing through the platform according to the actual situation, which is very convincing for some drivers who want to be opportunistic. 2-2-2 Civil Engineering Requirements In order to ensure the vehicle to complete the inspection before arriving at the toll station, the length of the toll island should be appropriately extended, and at the same time, it is considered to facilitate the speed control of drivers passing through the platform. Reconstruction of the toll island: demolish the island head (island tail) within the reconstruction scope, excavate the concrete pavement of the toll plaza, expand the island body and build a new island head (island tail), and adjust the equipment layout affected by the reconstruction and set up new equipment foundation according to the new design; Newly built entrance one-way toll island: there are fog lights, manual railings, lane cameras, traffic lights and automatic railings on the entrance one-way toll island; Newly built export one-way toll island: the export one-way toll island is equipped with fog lights, handrails, handholes of weighing equipment, control boxes, grating vehicle separators, weighing display screens, traffic signals, lane cameras, traffic lights and automatic railings; Foundation of toll island and toll booth: the foundation of toll island and toll booth is horizontal in the cross section direction, the longitudinal section direction is consistent with the longitudinal slope of the road surface, and the distance from the lowest edge of the top surface to the road surface is 25cm;; Toll Island Protection: Two φ 2 19 * 10.0 mm steel pipe anti-collision columns are set in front of the toll station, and cold-formed square steel anti-collision guardrails are set on both sides of the toll station to ensure the safety of toll collectors, toll vessels and equipment; Toll Island Pavement: The toll island pavement adopts colored cement pattern bricks, and the color and specifications are unified with those of the old island or determined by the construction unit; Marking of toll island fa? ade: The marking of toll island fa? ade shall be painted in yellow and black (or red and white) according to GB5768- 1999, with a spacing of 15cm, and an aluminum-based reflective film with a monochrome width of 15cm is attached to the head of toll island, so as to increase the night reflection effect. The installation position of the weighing platform should not cross the expansion joint of the cement slab, so as to prevent the weighing platform from being stuck due to thermal expansion and cold contraction and ensure the safety of the weighing platform. The weighing platform is installed in the middle of the driveway, and the horizontal and vertical slopes of the weighing platform should be consistent with the road surface, but the slope should not be greater than 2%. When the slope of the road surface before and after the weighing platform is more than 2%, the cement road surface should be broken in a large area, re-poured, leveled and controlled, and the weighing platform and the road surface should be smooth and excessive to prevent vehicles from jumping and bumping when passing through the weighing platform. Control boxes, weighing display screen bases and handholes are added on all exit side toll islands, and horizontal drainage pipes are arranged in the handholes to lead to the outside of the slope. It is particularly important to note that the horizontal drainage pipe must have an oblique angle along the road center and slope direction, and the oblique angle must reach 15 to facilitate drainage. The elevation of the bottom of the handhole should be lower than the foundation of the weighing platform (if there is a water storage tank at the bottom of the handhole, the drainage pipe can also extend into the water storage tank). If the weighing platform accumulates water, it will affect the accuracy of weighing equipment. The steel pipe is buried from the toll station foundation to the hand hole in front of the island through the control box foundation, and the weighing display screen foundation is added in front of the island tail, which is connected with the toll station foundation through the steel pipe. If the distance between the traffic lights and the toll station is not long enough, consider installing the weighing display screen and the traffic lights on the same post. 2-2-3 Equipment Installation According to China's technical specifications for vehicles, the total length of freight cars should not exceed 18m, so it is enough to install weighing equipment at the toll window 18m. If the distance is too short, the rear of some super-long vehicles will not completely pass through the weighing platform when they reach the charging window. If the distance is too long, the vehicle speed will generally be relatively fast, or the probability that the vehicle is in a variable speed state will be high, which will affect the weighing accuracy. Due to the irregularity of individual vehicles, the installation distance between the weighing platform and the toll booth window should be greater than 18m, generally around 18m to 23m, which is also convenient for vehicles to queue up and ensures the cost of weighing one vehicle and paying one vehicle. The glass surface of infrared automobile separator is easy to frost in winter, so it is suggested to use thermistor to defrost the rear windshield of automobile. The display content of the weighing display screen shall at least include vehicle type, overload rate, quantity and two spare lines. The display screen should work around the clock, with dustproof, rainproof and sunscreen performance; The brightness should ensure that drivers and passengers within 20 meters can clearly see the displayed content under various lighting and natural environment conditions; At present, the display screen is generally LED, so it is best to turn to 15 when installing, so that the display screen can directly face the driver and passenger, and it is easy to see clearly. 3. Equipment installation 3- 1 person (hand) hole and square camera For the toll plaza with additional toll lanes, the toll station manhole is correspondingly increased, and a new shoulder manhole is set outside the expanded shoulder. The camera handhole and foundation of the toll plaza demolished in the early stage of the expansion of the toll plaza are located in the newly-built 3-2 equipment foundation and the pipeline 3-3 toll booth. 4. The quality control after the completion of the project shall be handed over, inspected and accepted according to the contract requirements. Check whether the as-built data and as-built drawings are consistent with the actual construction, so as to be complete and accurate. Check the unfinished workload and defects, and supervise the construction unit to finish it on schedule until the certificate of termination of defect liability period is issued. Charging by weight has just started in China, and the detection accuracy of charging by weight equipment needs to be improved. There are not many domestic optional manufacturers, while foreign equipment is expensive and maintenance is not very convenient. In order to fully embody the concept of "people-oriented" and give drivers the right to complain, it is suggested to add a set of low-speed/static portable inspection equipment at the roadside of the exit square, and set up a simple overload law enforcement kiosk equipped with management computers, printers and other equipment.
- Previous article:Street slogan in Nepal
- Next article:The fonts are distributed in a mountain shape. What about Ps
- Related articles
- 202 1 Opening Speech of Spring Festival Gala
- Does the Green Youth Olympic Games focus on scientific and technological renewal or concept renewal?
- What is the prevention and control policy of return epidemic in Spring Festival travel rush in 2023 (Spring Festival travel rush epidemic return regulations)
- The name of the supermarket is Tongle.
- What is "one household, one file"?
- Self-summary of obstetric nurses
- Writing skills propaganda slogan
- Advertising words for hotel activities.
- Oreo's advertising words
- Self-examination report on site operation safety management