How to install Yuba, Yuba installation steps tutorial

Yuba installation steps:

1. Determine the installation location of Yuba. After installation, the lowest light bulb of Yuba should be 2. 1m ~ 2.3m above the ground. In order to obtain the best heating effect, Yuba should be installed on the ceiling directly above the center of the bathtub or shower room. Please use materials with good strength for the ceiling. Too high or too low will affect the use effect. (Tips: When using Yuba in general, keep your back close to Yuba. Don't aim your head directly at Yuba, it will affect your health. )

2. Install ventilation window. One end of the ventilation pipe is placed on the ventilation window, and the other end is fixed at the air outlet of the external wall from outside the wall along the ventilation window. The gap between the ventilation pipe and the ventilation hole is filled with cement.

3. Turn on the air outlet ventilator. Children's shoes with ceilings at home should not need this step. As soon as the air outlet opens, it opens in front of the ceiling. Installing a ventilator requires an air outlet to suck out the indoor air, even if it is very cold, it needs fresh air. For children's shoes without suspended ceiling, please refer to the requirements and methods of different gusset plates for reserved installation openings, and list the following air outlet sizes. The opening size of the standard aluminum gusset ceiling Yuba is 300mm*300mm or 300mm*600mm (a 300*300 gusset plate may not be installed). The installation opening size of Yuba should be reserved in front of the ceiling. For waterproof gypsum board ceiling and sauna board ceiling, because the position of keel should be confirmed, please also confirm whether the opening size of Yuba installation is reserved when installing pinch plate.

4. The reserved wire bath bully is generally divided into lamp warm bath bully and air warm bath bully. Different Yuba have different wiring standards, such as: air-heated Yuba: five groups of wires are reserved, including one group of lighting, one group of internal circulation fans, one group of PTC heaters, one group of negative ions and one group of ventilation. Lamp-heated Yuba: four sets of wires are reserved, one for lighting, two for lamp heating and one for ventilation.

5. Fix the Yuba, remove the mask, unscrew all the light bulbs, loosen the spring on the mask ring, remove the mask and connect the wires. Connect one end of the interactive cable to the switch panel, and pull the other end out of the ceiling opening together with the power cord. Open the terminal cover on the box, connect the wires according to the wiring diagram and terminal marks, cover the terminal cover, and fix the terminal cover with screws. Then put the extra wires in the ceiling so that the box can be inserted into the hole smoothly.

6. When installing the Yuba, first connect the ventilation pipe, pull out one end of the ventilation pipe extending into the room and cover it on the air outlet of the centrifugal fan casing, then push the box into the hole, and select the correct direction to insert the box of Yuba into the hole according to the position of the air outlet; Then fix the box on the ceiling rail with four wood screws with a diameter of 4 mm and a length of 20 mm