Joke Collection Website - Bulletin headlines - Safety management of the centralized control center team?
Safety management of the centralized control center team?
Team safety management 1 Safety production goals: To prevent personal deaths and serious personal injuries. No minor injuries. No abnormalities and attempts. No habitual violations. No first-class obstacles that are the responsibility of this team. No misoperation accidents. A small animal short-circuit accident occurs. The pass rate of work tickets is 100. The pass rate of operation tickets is 100. No fire accidents for which responsibility occurs. No major traffic accidents with equal or greater responsibilities. No theft accidents for which the team is responsible. 2 Team safety activities 2.1 Team safety activities every week once. The entire class shall participate in safety activities at least once a month, organized by the squad leader or safety officer. 2.2 The location and form of safety activities are informal, with emphasis on practical results. The main content should include: learning safety regulations, communicating safety production documents, notifications, instructions and meeting spirit, arranging and summarizing safety production work, analyzing safety situations, conducting safety discussions, conducting accident anticipation and anti-accident drills, learning fire protection knowledge and conducting fire drills . 2.3 Safety activities are recorded using audio recordings. For things that are not suitable for audio recording, such as fire drills and anti-accident drills, pictures or videos can be used. 3 Temporary employment management 3.1 Teams that require temporary employment must complete the approval procedures. 3.2 Temporary workers used by the team must have effective safety protocols in place. 3.3 The temporary workers used must comply with the provisions of the Labor Law of the People's Republic of China. 3.4 Before construction work, the team must explain the safety technical measures to temporary workers, explain clearly the danger points, precautions and work scope, and specify a designated person to be responsible for supervision and management during the work. 4 Safety management of outsiders and construction workers 4.1 Construction workers entering the substation construction site should abide by the substation safety management regulations, must complete work ticket procedures when entering the production area, and are not allowed to change safety measures without authorization during operations. 4.2 Foreign construction workers and the temporary workers they use must perform corresponding procedures. After passing safety training and examinations, they can enter the substation under the leadership of the person in charge of the work. If any substation safety management regulations are violated during the construction process, the operating personnel have the right to order them to leave the substation. 4.3 Leaders at all levels and outside visitors must be led by team members to enter the equipment area and wear safety helmets. 4.4 When using substation power supply during construction operations, the consent of the substation operator must be obtained and the connection location must be designated. 4.5 Construction workers are not allowed to enter equipment intervals outside the scope listed on the work ticket. When any doubt occurs during operation, the operation should be stopped first and the operator should be reported immediately. 5 Work ticket management Work tickets should use the standardized format of the "State Grid Corporation of China's Electric Power Safety Work Procedures". The management of work tickets shall be implemented in accordance with the new regulations promulgated by the Production Technology Department of Henan Electric Power Company in 2010. 6 Operation ticket management The operation ticket should use the standard format of the "State Grid Corporation of China's Electric Power Safety Work Procedures", and the operation ticket should be filled in in accordance with Yudian Biotech [2006] No. 664 "Henan Electric Power Company Substation Work Ticket Operation Ticket Management Specifications" Require. General micro-machine ticketing is not allowed, and the expert system of the error-proof operating system can be used to make tickets, but it should be strictly reviewed. 7. Management of anti-accidental locking devices As an important technical measure to prevent misoperation accidents, anti-accidental locking devices must be managed as electrical equipment. Management regulations should be strictly implemented in accordance with the relevant requirements of Henan Electric Power Company. 8 Fire protection management 8.1 Fire protection management 8.1.1 The team shall formulate fire protection measures and implement them conscientiously in accordance with the fire protection regulations issued by the state. 8.1.2 The team should strengthen the management of fire-fighting equipment and facilities to ensure that they are in normal condition. 8.1.3 Cable tunnels and mezzanines of unmanned stations should have fire-fighting facilities, and cable penetrations such as control panels, switchboards and terminal boxes in switch areas should be sealed with fire-proof materials. 8.1.4 Inflammable and explosive items must not be stored in the equipment room or equipment area of ??the unmanned station. Inflammable and explosive items placed in the equipment area due to construction needs should be strictly managed, used in accordance with regulations, and removed immediately after construction. . 8.1.5 Fire operations are prohibited in flammable and explosive areas in unmanned stations. In special circumstances, it is necessary to go to the competent department to handle fire procedures and take safe and reliable measures.
8.1.6 Operation personnel should learn fire protection knowledge and the use of fire protection facilities and fire fighting equipment in unmanned stations under their jurisdiction, and be familiar with the fire alarm telephone number (119) and alarm methods. 8.2 Anti-theft management 8.2.1 Outsiders entering the substation must go to the relevant departments to go through relevant procedures, show relevant certificates, and register. 8.2.2 The substation should regularly check the anti-theft alarm system and test the integrity of the alarm device every month, and deal with any faults in a timely manner. 8.2.3 When inspecting equipment, operating personnel should also take into account the inspection of safety and security facilities. 8.2.4 The substation wall must not be demolished casually. If it needs to be demolished due to work needs, the relevant departments must be contacted in advance to obtain consent and effective anti-theft measures can be formulated before demolition or modification. 8.2.5 The substation perimeter alarm system should be included in the equipment inspection and any problems found should be recorded in the equipment defect record. 9 Anti-small animal management 9.1 The team should formulate anti-small animal measures, check the implementation regularly every month, deal with any problems found in a timely manner and keep records. 9.2 The doors and windows of each equipment room should be intact and tight. Doors and windows should be closed at all times when entering and exiting. Each switch cabinet, electrical partition, terminal box and mechanism box should be equipped with facilities to prevent small animals from entering (such as baffles, mesh doors, etc.). 9.3 The cable trenches and roads leading from the equipment room to the outdoors should be tightly sealed and sealed promptly after dismantling for construction. 9.4 Food is not allowed to be stored in each working area. It is strictly prohibited to plant food crops in the station. Rat poison, rat trap equipment, and rat glue are placed in accordance with regulations. 10 Flood protection, lightning protection, wind protection, cold protection, and earthquake protection management 10.1 The team should formulate corresponding equipment lightning protection, flood protection, wind protection, cold protection, earthquake protection, and high temperature protection measures based on the climate characteristics, geographical location, and equipment actual conditions of the substation. 10.2 The substation should be equipped with an appropriate amount of flood control equipment and flood control materials as needed. Flood control equipment must be comprehensively inspected and tested before the annual flood to ensure that it is in good condition; flood control materials must be specially kept and have a special account. 10.3 During the flood season, the integrity of equipment box doors, rainproof facilities, and drainage facilities will be inspected more intensively. 10.4 After rain, check the water accumulation in basements, cable trenches, cable tunnels, etc., and drain the water in time. Ventilate the equipment room if there is excessive moisture. 10.5 When strong winds blow, you should focus on checking whether there are any abnormalities in the equipment's drainage lines, wave arresters, gas relay rain covers, etc. 10.6 Regularly inspect and clean the substation equipment area, walls and surrounding floating objects to prevent faults caused by strong winds blowing to operating equipment. 10.7 When the temperature is low in winter, you should focus on checking whether the heater in the switch mechanism is running well, deal with problems in a timely manner, and take measures to prevent cold and heat the mechanism box. 10.8 Before the thunderstorm season, inspections of lightning protection facilities and grounding devices should be strengthened. Any abnormalities found must be reported and dealt with immediately. 10.9 Strengthen the implementation and management of earthquake emergency plans and implement post-earthquake equipment hidden danger inspections. 11 Management of safety tools 11.1 The substation should be equipped with a sufficient number of effective safety tools in accordance with the "Regulations on the Standardized Configuration of Work Instruments of Henan Electric Power Company". There should be an appropriate amount of qualified spare parts for various safety tools; substation operators should be able to use them correctly. and safekeeping of various safety equipment. 11.2 Various safety equipment should be clearly numbered. Insulating rods, electroscopes and other insulating equipment must be marked with voltage levels and test dates, and should have rainproof covers. Safety tools should be stored in a clean, dry, moisture-proof, and condensation-proof storage place in the substation (it is strictly prohibited to place them on the ground or against the wall). The insulated tool room should have a dry and wet thermometer, a ventilation and dehumidification device, and a "Periodic Table for Testing of Insulated Safety Tools" . 11.3 Substation operators should carefully check safety tools during shift handover and before use. If any damage is found, they should stop using it and replenish it as soon as possible. 11.4 Various safety tools should be tested according to the period specified in the safety regulations. They can be used only after passing the test and must not be used beyond the specified period. 11.5 The portable ground wire should be composed of multi-strand soft copper wire with a transparent sheath. Its cross-section should not be less than 25 square millimeters. It should also meet the short-circuit current requirements of the installation site. The wire should have no broken strands, the sheath should be intact, and the ground wire end should be intact. The contact between the parts should be firm, the clips should not be damaged or loose, and the spring should be effective. The storage location and the ground wire body are both numbered, and storage must be in accordance with the number.
11.6 The specifications of various signboards should comply with the requirements of Appendix I of the "State Grid Corporation of China's Electric Power Safety Work Procedures", and should be complete in variety, stored in order, and in sufficient quantity to meet work needs. 11.7 When working in a substation, outsiders are not allowed to bring any form of grounding wire into the station. If a working grounding wire needs to be added during work, the grounding wire provided in the substation should be used. The operating personnel should record the grounding wire status of the external work team. The on-duty record and the grounding wire installation and disassembly record book shall be included in the duty record, and shall be responsible for the location and correctness of the working grounding wires installed and disassembled in the substation. 12 Traffic safety management 12.1 Motor vehicle passages should be clear and marked within the station. 12.2 Speed ??limits, height limits, parking signs and corresponding site signs must be set up in the station. The specific limit values ??should be comprehensively determined based on the actual site conditions, safety distance and other factors. 12.3 When going out to inspect equipment and operate brakes, you should pay attention to the physical and mental conditions of the driver, remind the driver to pay attention to driving safety, and fatigue driving and drunk driving are strictly prohibited. 12.4 The vehicles configured by the team can at least be operated by two operating groups at the same time and equipped with full-time drivers. Dedicated personnel will manage the vehicle and conduct regular inspections to keep it in good condition. 13 Dangerous Goods Management 13.1 All supplies that may endanger personal safety and health in a substation are collectively called hazardous supplies. All kinds of dangerous goods in the substation should be properly kept by dedicated personnel, regulations for their use should be formulated, and dedicated personnel should be responsible for supervising their use. 13.2 All types of flammable gases and oils should be stored in a unified manner according to the requirements of product storage regulations and must not be stored in the substation for a long time. 13.3 Waste toxic and harmful substances in the substation must be disposed of in accordance with the relevant regulations of the national environmental protection department. 14 Installation and use of low-voltage leakage guards 14.1 The power supply for all maintenance work in the station should be a dedicated power box (box). All low-voltage electrical appliances used in direct contact with the human body should be equipped with leakage guards; each fuse can only Bring out a load. 14.2 Portable low-voltage electrical appliances and leakage detectors should be installed on mobile low-voltage power supply boards. 14.3 Low-voltage leakage detectors in use should be tested regularly, and ineffective leakage detectors should be replaced in time.
For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd
- Previous article:Regional activity plan of kindergarten large class
- Next article:What was the purpose of the May 4th Movement?
- Related articles
- Art students have a very low sense of existence in music major.
- Are there any professional schools in Puning Vocational School?
- Zhang Dayi's launch of "996 liquid foundation" caused controversy. Is Zhang Dayi overturning again?
- Celebrity slogans
- I have been suffering from gout for several years. There was an old military doctor in my village, and he gave me two injections at the place where I had gout. The liquid medicine was red, and the nex
- Seeking interesting learning slogans
- A summary of moral education in kindergartens
- When were you born? Who is born with great fortune depending on their birthday?
- Idioms describing Tiananmen Square
- Mushroom picking slogan