Construction notice

construction notices (selected 5 articles)

in our ordinary daily life, the situations that need to use notices are increasing, and regulatory documents need to be published in the form of notices after being formulated by relevant departments. So the question is, how should I write an appropriate notice? The following are the construction notices (selected 5 articles) I compiled for you, for reference only. Let's have a look.

construction notice 1

Xie Kean, Li Quan and Ye Fajin digging pile construction team:

After investigation, the pile foundation project constructed by your team has the following hidden dangers:

When using mechanical operation, your team did not install the secondary distribution box, but directly connected the power to the primary distribution box to use mechanical operation, which failed to achieve the three-level distribution and two-level protection, and there were potential safety hazards in electricity consumption, which did not meet the specifications for temporary construction on site.

according to the relevant regulations, our project department now orders your team to:

1. Eliminate the above hidden dangers immediately, and complete the rectification before April 1, 2xx, and submit the Report on Rectification of Quality and Safety Hidden Dangers to the Engineering Department of our company for review.

2. During this period, your project department should take measures to prevent safety and quality accidents. If you fail to apply for re-inspection or make corrections within the time limit, the company will deal with your project department according to relevant regulations. Notice of construction 2

The Spring Festival is approaching. In order to do a good job in safety production in xx Garden site during the Spring Festival and let construction workers have a happy, peaceful and safe Spring Festival, the relevant matters are hereby notified as follows:

1. Do a good job in safety during the holiday season.

all construction enterprises should immediately carry out pre-holiday safety inspection, check temporary facilities and eliminate potential safety hazards. Do a good job in the safety management of the construction site to ensure that machinery, machines and tools, scaffolding, etc. are in an effective and safe state. Cut off the production power supply during the festival, and only keep the lighting power. Prevent fire and make sure that nothing is lost.

second, strictly implement the duty and accident reporting system.

during the festival, it is necessary to implement the management of special personnel on duty at the construction site, strictly implement the guard system at the construction site, and prohibit irrelevant personnel and social idlers from entering and leaving the construction site at will, and it is forbidden to set off fireworks and firecrackers at the construction site, and do a good job in fire prevention, theft prevention and accident prevention. The personnel on duty should make a good record on duty and strictly implement the accident reporting system. Handle and report the situation in time to ensure smooth communication.

third, do a good job in safety inspection and safety education at the construction site after the Spring Festival.

before returning to work after the Spring Festival, all construction enterprises should do a good job in safety inspection before returning to work, and do a good job in education and disclosure of workers before taking up their posts.

all construction enterprises must attach great importance to the safety work during and around the Spring Festival, earnestly implement the responsibility system for production safety, and do this work in a down-to-earth manner. Notice of construction 3

In order to further improve the fire safety and construction safety in construction sites during the Spring Festival, and ensure a happy, peaceful and safe festival according to the document No.5 of the Taiwan Construction Regulation [2xx] and relevant requirements, the relevant requirements are hereby notified as follows:

1. Specific requirements

1. Do a good job in returning home for migrant workers during the Spring Festival

On the premise of ensuring the progress of the project, we should try our best.

2. Do a good job in safety production in construction projects

We should carefully check the implementation of the responsibility system for safety production and the status of safety and fire prevention facilities in the projects under construction, close the gate of the construction site during the Spring Festival, cut off the power supply for construction, and eliminate all kinds of hidden dangers. In the near future, we should especially supervise the sources of major accidents such as tall formwork support system, deep foundation pit engineering and lifting machinery, and implement various measures to prevent falling from high places and major collapse accidents, so as to prevent the occurrence of safety production accidents. We should attach great importance to the fire safety and electricity safety of the construction site, and immediately conduct a comprehensive inspection of the migrant workers' dormitory on the construction site. If there are safety hazards such as insufficient safety passages and the occupation of safety passages, we should immediately rectify them to ensure the safety of construction workers.

3. Do a good job in sanitation, epidemic prevention and civilized construction

The dormitory and canteen of migrant workers on the construction site must be separated, and the canteen on the construction site should be kept clean and tidy, so as to keep the workers' living quarters clean and hygienic. Educate workers not to drink or gamble, in case of diseases or events disturbing social order. The construction site during the Spring Festival should avoid night noise, construction dust, traffic jams, etc., and safeguard the legitimate rights and interests of citizens.

4, strict holiday duty system

During the holiday season, it is necessary to arrange a special person to be on duty and be responsible for the daily management of the site. The person in charge of the site should keep the mobile phone open, and all kinds of emergencies and abnormal situations during the holiday season should be reported in time according to regulations.

5. Create a festive atmosphere

Put up safe and festive slogans, lanterns (lights are required at night) and colorful flags. Do a good job of cleanliness and hygiene around the site;

Second, pay attention to the inspection of fire safety and construction safety of construction sites before and after the festival

Before the festival, all enterprises should do a good job in relevant inspection and rectification according to the above requirements; Before returning to work after the holiday, the corresponding inspection should be carried out, and the resumption of construction on the site can only be implemented after the notice of returning to work (single) is issued by the chief supervision engineer on site. Notice of Construction 4

Dear owners/renovation leaders of Buildings 7 and 8:

Now, as the floor painting project of the underground garage has to be closed (September 2 ~ 3), all renovation units are requested to make good arrangements for the construction progress and carry the decoration materials two days in advance (from September 18 to 19). It is forbidden to carry heavy materials on the floor tile pavement on the first floor of the residential area. Light and small items can enter from the slope of Building 7 and pass through the lobby on the first floor of Buildings 7 and 8 (September 2 ~ 3). Please pile up the decoration garbage in the temporary stacking point designated by the peripheral road.

sorry for the inconvenience! Construction Notice 5

XXX Co., Ltd. and XXX Engineering Co., Ltd.:

The Spring Festival of XX is coming, and the dumper project and the maintenance building project have been temporarily suspended. In order to ensure the safety of the construction site during the Spring Festival suspension, the following safety assurance measures are put forward, please follow them.

1. During the shutdown period, the construction site shall strictly abide by the fire prevention regulations of the power plant and the fire prevention system at the site. Fireworks and firecrackers are prohibited in the factory, and the heating facilities in the duty room should be watched by special personnel. It is forbidden to use open flames and high-power electrical appliances for heating, to pile up flammable materials near the heating facilities, and to pull wires without permission.

2. During shutdown, ensure the safety of electricity consumption, shut off and lock other electricity consumption except domestic electricity consumption in time, and regularly check whether the power distribution facilities are damaged.

3. During the shutdown period, it is necessary to ensure the safety of important facilities, and strengthen the stability inspection of tower cranes, scaffolding and foundation pits. In case of potential safety hazards of facilities, isolation warning measures should be taken in time to prevent harm to others.

3. During the shutdown period, each construction site shall arrange special personnel to implement the 24-hour duty system. The personnel on duty should strengthen the inspection of key areas of the construction site, promptly eliminate potential safety hazards in the construction site and office area, do a good job in anti-theft, fire prevention and safe use of electricity, and do a good job in their own safety protection. In case of emergency, they should report to the person in charge of the unit in time, organize rescue and disposal, and report to the shift supervisor of Houma Thermal Power Branch in time.

4. During the Spring Festival, the personnel on duty of the thermal power company will conduct spot checks on the duty situation at any time, and punish 5 yuan for failing to implement safety measures and being unattended every time. Please report the name list and telephone number of the personnel on duty during the Spring Festival to the Biotechnology Department and the Safety and Environmental Protection Department before February 4th.

this is for your information. ;