Joke Collection Website - Bulletin headlines - Summary of quality month activities

Summary of quality month activities

Summary of Quality Month Activities (6 selected articles)

After an activity, I believe you will gain a lot, so write these records in the activity summary and keep them in mind. Many people have a headache about how to write a wonderful activity summary. The following is a summary (6 selected articles) of the activities of Quality Month organized by me for your reference only. Let's have a look.

Summary of Quality Month Activities 1 In order to improve the product quality of machinery factory, improve the work quality and enthusiasm of employees, enhance the sense of responsibility of department personnel and enhance the cohesion of enterprises, in September of 20xx, our factory launched the "Quality Month" activity with the theme of "All employees act to improve quality". Under the leadership of the company's business division, all workshops attach great importance to it, meticulously organize and strictly demand it, and the quality level of each workshop has achieved remarkable results and the product quality has been improved. These activities are summarized as follows:

1, leaders attach importance to it and organize it carefully.

In order to better carry out quality month activities, the machining department held a general meeting of all staff to mobilize the activities, briefly described the purpose and requirements of carrying out quality month activities, and announced the start of quality month activities. This paper briefly comments on the specific implementation and arrangement of quality month activities. Specific requirements were put forward for the improvement of each workshop, and the quality month activity officially kicked off. It is required to take quality month as an opportunity to create an atmosphere of "everyone cares about quality and everyone values quality".

2. Strengthen training.

In this "quality month" activity, the climax of learning was set off, which enabled employees to establish quality concepts and improve quality awareness. Each workshop carries out quality training for employees through various forms. Machining workshop: set an example to train operators and ask them to strengthen self-inspection and strictly control the quality of parts; The employees in the whole workshop have been trained to use measuring tools. Structural workshop: adhere to regular meetings and improve employees' quality awareness. Every day after the production, the quality inspector summarizes the production and quality of the day and makes it public in the workshop regularly; The overall quality of the workshop has been improved. The mold workshop has strengthened the training of employees' drawing recognition, and gradually developed the training of employees' drawing recognition ability.

3. Strictly control the quality of the production process.

In order to effectively realize process quality control, employees in each workshop improve their self-inspection ability and strengthen self-inspection in the production process. Workshop inspectors increased the intensity and frequency of inspections, and all dimensions were strictly implemented in accordance with the company's internal control standards, and detailed records were made. The directors of each workshop strictly manage the quality of each workshop, which has obviously improved the product quality.

There are still many problems in quality month.

Although the product quality of our workshop has been obviously improved in September, there are still many problems, such as the appearance quality needs to be improved, the product polishing is not detailed enough, and some details need to be improved urgently. The quality has been greatly improved in late September, but there are still some shortcomings.

On August 3 1 day, with the joint efforts of all employees in the factory, Japan's second quality month ended successfully. Through this quality management month, employees' quality awareness, skills and management level have been greatly improved, the expected goals have been achieved, and good social benefits have been achieved. Quality month has greatly improved the quality of our company. It is hoped that all workshops will maintain the current good situation, pay unremitting attention to quality, form a good atmosphere of quality month and improving quality day by day, and make our company's quality continuously rise to a new level, establish our company's quality reputation, build a brand and be invincible in the market.

Summary of Quality Month Activity 2 The one-month "Quality is in my heart, quality is in my hands" quality month activity ended successfully, which is not only a great event in the political career of the company's top management, but also another major measure to improve the quality awareness of all employees, and to raise the moral quality of our three mainstream products to a new level and move towards higher goals from me. Looking back on the development of the movement since January, all our cadres and employees have been firmly entangled in the encouragement and demands of the general manager at the staff meeting above the supervisor level. They carefully organized, arranged fairly, actively participated in, fully implemented, gradually promoted and improved from time to time, successfully realized the detailed contents and requirements of this activity, achieved gratifying results, reached the fantasy goal, found out the key to the problem, put forward reasonable measures, took out rectification plans, and adopted excellent methods to reverse the past existence.

Summarizing the quality activities since January, we have achieved the following eight results:

1. By carrying out some recreational sports activities, it not only enriches the amateur civilized life of our employees, but also cultivates our law-abiding ability and organizational ability, which not only tempered our bodies, but also honed our will.

2. Through the selection of "group pacesetter" and "individual pacesetter", the enthusiasm of employees is high, forming a gratifying situation of chasing after each other. A large number of outstanding employees have emerged, with Zhongtie Group as the "group pacesetter" and "individual pacesetter" such as Huang Jiaxin of Cold Pressing Group, Chen Kai of Packaging Group and Yang Jun Road of Finished Product Warehouse as the leader. Because of the quota limit, we can't list them one by one. They are role models for us to learn from. I hope they will continue to make progress, make progress more advanced and let the backward catch up with the advanced.

3. By carrying out and strengthening 6s management, the environmental sanitation from the workshop area to the living area has been greatly improved, with a brand-new look and incomparable comfort, and at the same time, a comfortable environment and a good premise have been invented for production.

4. Under the leadership of Manager Pan, the heads of all departments intervened in the evaluation, corrected the on-site test of employees' operation, and evaluated the typical examples of employees' standardized operation such as Mianyou Group and Liu Guiqiang, which greatly inspired their fighting spirit and work morale, and made them learn to observe, strive for perfection and constantly improve.

More importantly, through this activity, the quality awareness of employees has been greatly improved, and the original bad operating habits and the thinking consciousness of "doing bad things has nothing to do with me" have disappeared without a trace. Really in the "everyone quality control, do a good job", in the production line to pay their own hard work, pay their own efforts.

6. Through this activity, the "three inspection cards" that have been idle for a long time have been flexibly put in place, and a series of "work instructions", "technical difficulties, blind spots and tracking schemes for on-site training of operators with outdated skills" and "rectification schemes for backward sections" have been issued one after another. Through the statistical analysis of quality control, inspection, exposure, rewarding the superior and punishing the inferior were adopted, and at the same time, 65438+ was punished according to the company's two items.

7. Through this activity, the small links of each plate have been effectively controlled. In the previous process, the plate should be handled carefully, and the machinery should be maintained and inspected frequently. The process is pointed out to be too fine, and the dimensional deviation of the hole position and the groove position has been effectively mastered; The operation and skills of surface oil and bottom oil in the intermediate process have been greatly improved; After training, the packaging department broke through the key and difficult points, seized the tail goods, and effectively curbed the scene of less packaging and wrong packaging; In view of the quality problems such as scratches on plates, the material supply department put forward and formulated a feasible scheme, and sent people to the factory to follow up, which greatly reduced the ratio of reducing production efficiency due to incoming materials and realized the gratifying situation of synchronization between production and planning.

8. Through this activity, the pride of outsourcing suppliers in quality has been greatly weakened. The quality department checks the product quality of customers every day to solve the problems existing in the products. At the same time, send personnel to the factory to track, lead and test the monitoring equipment, and implement the methods and steps of full inspection first, then packaging, then sampling and then warehousing. According to the established evaluation criteria, the problem is invented in front and solved before it flows to customers.

The above achievements can not be achieved without the accurate guidance of the general manager, the strong support, active cooperation and unique efforts of all the staff headed by manager Lu of the production department, and the up-and-down cooperation and training guidance of all the staff of the quality department of our company. Although the "quality month" has just begun, we should follow the guidance of the general manager: this activity is not an inflow form, it should be profound and implemented, not as an activity, but for a long time.

In short, the success of this activity, all employees of the company devoted a lot of effort and sweat, and paid a lot of hard sweat. Through a series of measures, the quality awareness of all employees has been effectively improved. With the goal of "working hard and winning good grades", Qi Xin ensured the victory of "Quality Month" in an all-round way and promoted the improvement of quality. The defective rate of products dropped from 2.66% last month to 656%. The internal management of the company has risen to a higher level and presented a new situation. What we sow is not only economic benefits, but also a thorough review and sublimation of the concept of dedication, unity and truth-seeking for all employees of the company! This will be an important lesson for us to do a good job in "Quality Month" in Xuan Yue, and it will also be the most precious wealth for our company's sustained and stable development in the future!

Summary of Quality Month Activities 3 It is the annual quality month again, and this year's quality month is particularly disturbing. The occurrence of xx event is shocking, and its consequences make people feel psychological fear, and its social impact and impact on enterprises will be terrible. So, how should we treat xx's recent statement that "social development and enterprise benefits cannot be exchanged at the expense of quality"? We should always ensure quality in our work, and turn one quality month every year into 12 quality months. We should always keep a clear head, less grandiose and more concrete actions, so that our quality consciousness can be reflected in every minute of our work at this moment. The first quality month of our company has passed. Quality month is an important measure of our business goal of "intensive cultivation and steady growth" this year, which has improved the quality awareness of all employees and pushed the quality of our products to a new level. Looking back on this month, I have the following profound experiences:

1 and xx knowledge training, let us know more about the legal knowledge and basic production knowledge of cosmetics industry, so as to do better and more correctly in the future work.

2. After participating in the ISO quality system revision and internal auditor training of external training institutions, everyone can fully appreciate the important guiding role of the quality system in production and quality work, and gradually formulate and improve a set of management system documents suitable for our company through continuous learning, and at the same time train a group of excellent internal auditors for our company.

3. The basic training of quality management not only enables us to learn better management methods and means, but also enables every employee to clearly understand the importance of self-work, so that self-inspection and mutual inspection can be done better and better, quality accidents can be reduced, and five major satisfactions can be achieved.

4. After self-examination and self-correction, problems are found and solutions are put forward, so that each of us can be from unclear to clear, from clear to familiar, and further improve the workflow that does not conform to the facts.

5, three exams and competitions, let us enjoy the happiness of learning and exams, let us feel something when we return to school, consolidate what we have learned and apply it to practical work.

Quality is the life of an enterprise, not only for the quality management department, but also for every employee. Don't think that the quality month is only one month, so this activity is not an inflow form, it should be thorough and implemented. Don't regard it as a sport, but insist on it for a long time, regard it as a kind of enterprise management, and control the hidden dangers of defective products in the possible bud. Let our company go up a storey still higher, let us Yachun have a better reputation in the cosmetics industry and become the most influential enterprise.

Although quality month has ended, the atmosphere of quality month has been in our daily work. Quality is the life of an enterprise, and the improvement of product quality level requires the joint efforts of all employees of the company. Let's join hands to create the perfect blueprint of xx! At the same time, the company is also expected to hold more interesting activities to enrich employees' spare time life.

Summary of Quality Month Activities 4 According to the spirit of the document "Notice on Launching National Quality Month Activities in 20xx", the Engineering Bureau launched the "Quality Month" activities with the theme of "Quality and safety are the foundation of social harmony" in September of 20xx. Lin Si Power Plant Project Department responded positively and organized various departments to carry out quality month activities around the theme. Now, the quality month activities of the project department in September 20xx are summarized as follows:

First, around the theme of quality month activities, improve quality awareness.

1, implement leadership responsibilities and publicize them widely.

After the project department of Lin Si set up the leading group of "Quality Month" activities, it immediately convened a mobilization meeting of quality month activities, delivered documents, arranged work, put forward requirements and fulfilled responsibilities. Together with all the staff, we analyzed the quality work of our unit, found out the weak links of quality work, and put forward many valuable suggestions on the quality and safety of the project department itself, such as the reasonable erection of construction bent, the requirements of shotcrete equipment, and the treatment of concrete defects. At the meeting, relevant measures to improve the engineering quality were formulated, such as the quality inspection personnel of the project department should be on duty continuously during the concrete construction to control the appearance quality of concrete. These suggestions and measures formed meeting minutes and distributed them to all departments. According to statistics, in September, Lin Si Project Department distributed more than 200 publicity materials on basic knowledge of engineering quality, hung more than 65,438 banners and posted more than 100 propaganda slogans. The information mainly involves the propaganda slogan of "Quality Month" and the knowledge of engineering quality and safety. , well created the atmosphere of quality month, and received good publicity effect.

2. Strengthen quality self-inspection and promote management.

During the quality activity month in September, the Lin Si Project Department extensively carried out the special rectification work of the quality activity month, and the on-site investigation was the top priority of the "quality month" activity. On September 8th, 20xx, the Quality Inspection Department, the Security Department and the Engineering Department of the Project Department, led by Li Hongfei, the deputy manager, conducted a strict on-site inspection of the bid section of the Project Department. During the inspection, the parts or processes with potential quality and safety hazards were recorded in detail, and the rectification notice was issued. A comprehensive inspection and discussion were conducted on key parts, so that Qi Xin could work together to prevent delays. The anomaly is the targeted inspection of No.2 tailrace tunnel of tailrace tunnel project under construction. Because of the poor geological conditions of rock strata here, it has always been the focus and difficulty of construction. Deputy manager Li asked that the upper half hole should be poured first, and then the lower half hole should be excavated after the capping section is formed. The construction team is strictly regulated and must be carried out according to the requirements of short footage, weak blasting and timely support. After returning, the leading group of "Quality Month" activities summarized the inspection results and reported them in the form of documents, briefings and meetings. At the same time, by strengthening the coordination, supervision and management of all kinds of subcontracting teams, the quality assurance system of the construction site is strictly operated, and the quality of the construction site is fully controlled. Through the checks at different levels, the quality of the project is ensured to achieve the excellent goal.

Second, organize quality training.

Actively cooperate with china construction news Social Talent Training Center to train senior construction management talents in the project department in newly promulgated laws, regulations, standards, new technologies and new materials. And set up a branch school of skills training for migrant workers in Lin Si Power Station of China No.9 Hydropower Bureau, and trained more than 40 subcontractors and partners every week. The management level of quality management personnel in the project department has been improved theoretically, and the construction skills of frontline construction personnel have also been greatly improved.

Third, play an exemplary role and carry out various quality observation activities.

In order to improve the overall engineering quality of Lin Si Hydropower Station, at the request of the owner and under the organization of the supervision unit, the Sixth Hydropower Bureau, the Eighth Hydropower Bureau and other brothers visited the tailrace tunnel project undertaken by our department. All units praised the quality of tailrace tunnel project and put forward many valuable opinions. The owner and supervisor also praised our department for setting an example for other units to learn from.

Fourth, promote energy-saving and thrifty construction sites

In order to ensure that the energy consumption of the construction output value of the construction industry decreases by 20% and 4.4% year-on-year during the Eleventh Five-Year Plan period, and determine the energy consumption base of the construction output value of enterprises, the project department will carry out statistics on energy saving and consumption reduction, and make detailed statistics on the energy consumption of the construction output value of the tailrace tunnel under construction. Assign special personnel to supervise the implementation, improve the reporting rate and accuracy of energy consumption statistics, and lay a solid foundation for the implementation of energy saving and consumption reduction target management in the construction industry.

Fifth, strengthen scientific and technological innovation and organize quality research.

1, organize research and prevention work, and reduce common quality defects of construction projects.

2. Strengthen the quality management of testing institutions and standardize testing procedures.

3, strengthen the quality management of ready-mixed concrete and precast concrete construction.

Although the "Quality Month" activity has ended, through the efforts of all staff, our department has made great achievements, but there are also some problems that need to be solved urgently. We must take the "Quality Month" as an opportunity, carry out the activities of creating excellence in depth, and strive to upgrade the engineering quality of Lin Si Project Department to a higher level in.

Quality is the foundation of an enterprise. Only by doing a good job of quality together can the roots flourish, the enterprise develop for a long time, and our products can be well received by consumers and have a brand effect. May is the company's quality month. In order to effectively carry out the activities of "Quality Month", the activities of "Quality Month" were comprehensively planned and arranged, which laid a solid foundation for the activities of "Quality Month".

Entering the "Quality Month", the company organized the "Quality Month" quality month activities. With the theme of "improving product quality", we should exercise ourselves and improve ourselves in order to further strengthen the construction of grass-roots management cadres, build a strong executive team, improve refined management skills, and adapt to the new requirements of modern enterprises for the quality and skills of grass-roots managers. Held a series of job skills training, such as backup inspector, backup section chief, backup planner, etc. , improve the job skills of employees, promote the improvement of quality awareness and continuous improvement of quality management, and finally ensure the physical quality of products. After this training, the students all felt that they benefited a lot, and they all said that this training was very helpful to improve their skills. In the future, we must apply what we have learned to work practice and make contributions to the company.

Entering the "Quality Month", the company held a manual welding quality and technology competition in the four-way valve welding workshop. After careful planning, the activity formulated the implementation plan of quality and technology competition, evaluated the parts processing progress, processing quality and operation standardization, and made a comprehensive evaluation according to the physical quality of parts and the difficulty of parts processing, so as to truly achieve the purpose of learning and attaching importance to technology after the competition. After the contest, the winners will be rewarded according to the evaluation results. After technical competition, it not only effectively promoted the operator to improve the technical level and processing efficiency, but also effectively promoted the standardization of the operation process with good quality and quantity.

Entering the "Quality Month", Wang Leehom, director of the quality department, organized new employees to receive quality knowledge training in view of the phenomenon that new employees were unfamiliar with quality knowledge and didn't fully understand quality work. In addition to learning Q-type quality knowledge, training materials are also combined with actual conditions, such as processing in strict accordance with technological requirements; Three-unprincipled in the production process-don't understand, don't produce, don't let go of unqualified products; How to protect parts in the production process; How to maintain tools and equipment; Adhere to environmental protection in the production process. And emphasize to everyone that the basis of quality work is prevention, and we must do things well in the first time; The focus of quality work is continuous improvement. We should boldly put forward new treatment methods and schemes. At the same time, we have learned some cases in the previous production process, summed up experience and learned lessons from the quality problems that occurred in the past.

After learning, we have further mastered the basic knowledge of quality and understood that quality is processed, not tested. Quality work is not the responsibility of any department or individual, but the responsibility of all personnel. Everyone should do their job well, and integration can ensure the quality of the whole product. It will play a strong role in promoting how to do a good job in the future.

Brand yourself, always remember the word quality. For the existing problems, it is necessary to further raise awareness, implement actions, find problems at the first time, solve problems in the process of composition, win the trust of customers and seize market opportunities. Make the quality of Sanhua leap to a new level.

Summary of Quality Month Activities * * * 6 Public places are communities where human beings live intensively, and their air quality directly affects human health. In order to ensure that the indoor air quality of public places in our banner meets the national health standards, it is particularly important to strengthen the health monitoring of public places. According to the Detailed Rules for the Implementation of the Regulations on Hygiene Management in Public Places, our center will start from July 20xx 15, and the work is summarized as follows:

First, the test basis:

Determination of Inhalable Particulate Matter in Public Places (PM 17220- 1998) Detection Method of Hygienic Standard for Public Places (GBT 18204-2000) Public Places.

Second, the evaluation criteria:

Hygienic standard for public places (GB 9663-9673 ~ 1996, GB16153-1996) and indoor air quality standard (GBT18883-296)

Third, the instrument:

Indoor air field ammonia analyzer, formaldehyde monitor, thermometer, anemometer, sound level meter, digital illuminance meter, portable automatic carbon monoxide analyzer, pocket infrared carbon dioxide analyzer, etc.

Four. Monitoring projects carried out:

Carbon dioxide, carbon monoxide, formaldehyde, inhalable particles, ammonia, dynamic noise, temperature, humidity, wind speed, illumination, total number of bacteria in the air.

Verb (abbreviation for verb) monitoring result:

As of March 27th, * * * monitored the air quality in 49 newly opened hotels, barbershops, restaurants, kindergartens and other public places. After testing, the indoor air quality of 49 business premises is within the normal range, and the qualified rate is 100%.

;