Joke Collection Website - Bulletin headlines - 6 housing construction contract

House construction contract 1

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Through friendly negotiation,

6 housing construction contract

House construction contract 1

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Through friendly negotiation,

6 housing construction contract

House construction contract 1

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Through friendly negotiation, the above two parties have reached the following contract terms for Party A's residential construction:

Article 1 Location of the subject matter of this contract: Changping District, Beijing (the construction area is about square meters, and the contract price is subject to the actual construction area); The construction period of the subject matter is xx years to xx years; The construction cost of the subject matter is RMB/m2; The way of contracting is mode.

Article 2 Party A puts forward the basic layout, overall framework and dimensions of the building, and Party B shall design detailed building structure drawings for Party A in good faith and professional ethics, and be responsible for technical and safety audit. Party B's final design drawings can only be started after Party A agrees.

Article 3 The main structure of the subject matter is structure, and all building materials used by Party B in the construction process shall meet the quality requirements of civil residential buildings, and the use and structure of all materials shall conform to industry practices. At the same time, Party B's construction behavior shall strictly implement the safety, durability and convenience conditions for building civil houses.

Article 4 All the places where tiles are laid on the subject matter shall meet the aesthetic requirements such as flatness. The quality guarantee period of this kind of project is two years, during which the shedding rate and fracture rate shall not exceed 1% of the area. If the area exceeds the agreed area, Party B shall be responsible for repairing all the damaged parts free of charge; If losses are caused to Party A due to shedding or fracture, Party B shall compensate. If Party B fails to rework in time, Party A may deduct Party B's quality deposit.

The fifth theme corridor, the wall flatness must conform to industry standards and positive industry practices; The laying of concealed works such as the subject matter pipeline must meet the requirements of safety and convenience. For example, telephone, network cable and circuit cable should be laid separately, and the circuit cable should keep a certain technical distance from the TV cable.

Sixth projects that need to use concrete should use mechanical mixing concrete; The top floor is paved with insulation layer, cast in place, and waterproof and rainwater drainage works of the house are done at the same time.

Article 7 Payment of the price of the subject matter project: Party A shall pay RMB yuan for completing the basic project of the project (from the subject matter foundation cushion to the first floor); Half of the project construction, Party A pays RMB; After the completion of the project, Party A shall pay RMB (Party B shall ensure that the completed project construction meets the safety requirements and industry standards of residential buildings before payment in each stage). In addition, Party A withheld 65,438+00% of the total project cost as quality guarantee, and when Party B's construction reached the terms of this contract two years later, Party A paid all the balance to Party B.. ..

Article 8 Rights and obligations of Party A:

1. Party A can inspect and supervise Party B's construction at any time, and can stop improper behavior.

2. Party A can change the construction drawings without affecting the construction period of Party B. ..

3. Party A shall pay corresponding expenses to Party B according to Article 7 of this contract.

4. Party A is responsible for coordinating water and electricity for Party B, but relevant expenses shall be borne by Party B. ..

5. After the project is completed, Party A may require Party B to provide complete completion data and completion acceptance report.

Article 9 Rights and obligations of Party B:

1. Party B's construction behavior and materials conform to relevant industry standards and positive industry practices, and guarantee integrity; If the project quality does not meet the requirements of this agreement or relevant industry standards, Party B shall rework it free of charge and bear the losses caused to Party A therefrom.

2. Party B shall complete the construction task on time on the premise of ensuring the quality; In case of overdue, Party B shall bear the penalty of RMB/day and other losses suffered by Party A as a result. Party B shall not subcontract the construction of this project.

3. Party B shall provide its own construction tools and equipment required for relevant housing construction projects that meet the requirements of the industry, and at the same time, Party B shall ensure that all construction personnel are corresponding technicians with construction qualifications.

4. Party B shall be responsible for the safety of its own personnel and corresponding articles, and be responsible for personal injuries and property losses caused by accidents, casualties, etc. Party A shall not be responsible for personal injury of Party B's personnel.

5. If Party B causes personal or property damage to others due to improper construction or failure to fulfill the corresponding duty of care, it shall be liable for damages, and Party A shall not be liable for this.

Article 10 This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature by both parties.

Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Xx,xx,XX,XX

Housing construction contract II

Party A: ID number:

Party B: ID number:

Party B promises to build a private building of Party A in Lupo, diagonally opposite to Sunshine Community in Wangmo County, and both parties sign this contract through equal consultation.

1. construction content: main body of brick-concrete structure house (including stair steps, toilets, columns, etc. ), the materials needed for construction shall be provided by Party A (bricks, sand, steel bars and cement). The construction content is that the contractor does not include materials.

2. Quality requirements: bricks are properly laid, steel bars are firmly bound, concrete is poured and compacted, the elevation is accurate, the lines are straight, the bottom slurry is full, and the board surface is flat without water.

3. The planned construction period is 7 months (July, 20_ year 13 to February, 3, 20_ year1day). If the construction cannot be carried out due to non-human factors, the construction period will be postponed.

Four. Payment method of the project: Party A shall pay the project payment to Party B according to the actual construction area (calculated by adding stairs) at the price of 170 yuan/m2 (including the landing fee). Party A shall pay Party B the construction fee for each floor on the day after pouring.

Verb (abbreviation of verb) Party A's responsibility:

1, to ensure the timely arrival of raw materials and the normal supply of water and electricity for construction.

2. Every time the floor slab is poured, Party A shall bear the workers' working meals or pay Party B the 30 yuan/person meals according to the actual number of participants in the construction.

3. Ensure clean drinking water supply for construction workers.

The intransitive verb Party B's responsibility.

1. Complete this contract on time and with good quality.

2. Self-provided construction machinery and equipment, tools and building materials, such as timber and supports.

3. Carefully organize the construction and take necessary construction safety measures to ensure construction safety. In case of work-related injuries during construction, all responsibilities shall be borne by Party B, and Party A shall not bear any responsibilities.

Seven. responsibility for breach of contract

1. If the construction contents have been marked on the engineering design drawings, Party B shall guarantee the construction according to the drawings; If it is not marked or needs to be changed, both parties shall agree to carry out the construction in advance. If losses are caused by changing the construction content without the prior consent of both parties, the breaching party shall bear the corresponding liability for compensation.

2. If this contract cannot be performed due to unreasonable breach of contract by either party, both parties have the right to terminate this contract, and the breaching party shall compensate the other party for the corresponding economic losses.

Eight. This contract is made in duplicate, one for each party.

Nine. This contract shall come into effect as of the date of signature by both parties.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 3 of the housing construction contract

Party A: (Owner)

Party B: (Contractor)

Through equal consultation between both parties, Party A is willing to contract the apartment building project in Chaoyang District to Party B, and now both parties have reached the following agreement on the specific matters of project closure.

1. Contract content: Post-construction project of apartment building, from existing project to complete, including toilet renovation, old boiler room renovation, courtyard pavement hardening, sewage renovation, wall and floor tile painting of all passages, and power supply line rerouting of east and west buildings, but not limited to this.

2. Contracting method: with or without material contracting, the engineering equipment and facilities shall be undertaken by Party A. ..

3. Construction period: it will be completed within 30 days from the effective date of signing the agreement. If the project quality does not meet the requirements, Party B shall be responsible for free repair or rework. If the project is completed late, Party B shall bear the penalty of RMB yuan for each day overdue, which Party A can directly deduct from Party B's project payment.

4. Contract project cost: 10,000 yuan.

5. Payment method: Party A shall pay RMB on the first day of construction 10, RMB on the 20th day, RMB after the completion of the project, and the remaining RMB as the project quality deposit. If there is no quality problem in the project after three months, Party A will pay the balance to Party B. ..

6. The engineering structure shall be subject to Party A's design (or construction according to drawings). If it does not meet the housing quality construction standards, Party B shall raise it in time.

7. Precautions: During the construction, Party B shall carry out the construction according to the national building codes to ensure the project quality. During the construction period, Party B shall always pay attention to safety. In case of any safety accident that causes personal injury to Party B, all responsibilities shall be borne by Party B, which has nothing to do with Party A.. ..

8. This contract shall come into effect after being signed by both parties or representatives. This contract is made in duplicate, one for each party.

Party A: Party B:

Year, month, year, month, year

Article 4 of the housing construction contract

Party A:

Party B:

Party A contracts the project to Party B.. According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, honesty and credit, both parties reach an agreement on the construction of this project and sign this contract for mutual compliance.

I. Project name:.

Two. Project location:.

Three. Scope of contract: the construction area is mainly square meters.

4. Contracting method: double contracting, with Party B contracting the project, materials and construction machines.

Verb (abbreviation of verb) Contract content:

1. Party B is responsible for the main works in the construction drawing of this project, including indoor plastering, external wall plastering and external wall tiling.

2. Party A shall be responsible for three links and one leveling before voluntary construction, and the water and electricity shall be connected to the construction site by Party A. ..

3. Before Party B enters the site for construction, Party A shall be responsible for coordinating and perfecting the adjacent store boundaries or land to ensure the smooth progress of Party B's construction. ..

6. Construction quality: Party B is responsible for the construction according to the acceptance standard of the national building construction code, and completes the decoration construction of the main body and part of the construction drawing with good quality and quantity. In the process of construction, it must be civilized and safe according to the requirements of Party A. ..

Seven. Unit price of the project: Party A shall pay Party B RMB per square meter according to the actual construction area.

8. The construction area is 1 floor, and the calculation shall be based on the post clamp from the back wall to the front shop, and the second and third floors shall be calculated according to the actual area.

Nine. After both parties sign this contract, Party B shall pay the project security deposit of RMB 10000.00 Yuan to Party A, and Party A shall return the security deposit of RMB 10000.00 Yuan to Party B after the first floor and the main building on the first floor are completed. ..

10. Payment method: After the main building of negative 1 building and positive 1 building is completed, Party A will pay 80% of the project cost to Party B according to the actual construction area, and the second and third floors will be carried out in this way. After the acceptance of relevant departments, Party A shall pay the project cost to Party B in one lump sum.

XI。 Liability for breach of contract:

1. After the contract is signed, neither party shall breach the contract. If one party breaches the contract, it shall pay 30% of the total project cost to the observant party as liquidated damages.

2. If Party A fails to pay the project payment to Party B as agreed in the contract, Party B has the right to stop work, and all losses caused thereby shall be borne by Party A. ..

Twelve. Time limit for a project: completed on year, month and day. In case of force majeure, the construction period will be postponed.

Thirteen. Safety matters: During the construction process, Party B must ensure the safety of construction and carry out standardized construction in strict accordance with the Regulations of Sichuan Province on Work Safety and the Operating Rules for Safe Construction. When Party B's workers enter the construction site and work at height, they must wear safety helmets and tie safety ropes. If any accident happens to Party B during the construction, Party B shall be responsible for it. Party B must purchase migrant workers' insurance from relevant insurance departments before entering the site, otherwise the construction cannot be carried out.

Fourteen Matters not covered in this contract shall be settled by both parties through consultation. This contract shall be signed and sealed by both parties in duplicate, and the accounts shall be settled. This contract will naturally take effect.

Party A:

Party B: Date of signing: year month day.

Article 5 of the housing construction contract

Party A: ID number: (hereinafter referred to as Party A) Party B: ID number: (hereinafter referred to as Party B) In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, the Contract is concluded as follows.

Party A will build a new house in Hejia Formation, Weidong Village, Shanglingqiao Town, Lengshuitan District, with a construction area of about 750 square meters, which will be contracted by Party B ... The construction area shall be subject to the final completion measurement.

First, the contracting method.

Take the way of contracting without contracted materials. Party A shall provide building materials, including: red bricks, river sand, lime, cement, steel, water pipes, sewer pipes and water and electricity.

Party B shall provide labor services, construction technology, scaffolding materials, machinery, sites, templates, supporting trees, nails, tying wires and production and living appliances.

Second, the construction project

Party B shall carry out the construction according to the design drawings or the requirements put forward by Party A (note: the height of the first floor is 3.5 meters, and the height of the second floor is meters). The buildings of Party A's main building project include: foundation construction, walls, beams, columns, stairs, floor, formwork installation, formwork removal, steel bar binding, precast slab hoisting, cast-in-place concrete, a layer of ground concrete, concrete cushion around the ground, external walls and front steps; The interior of the decoration is painted roughly, and tiles are attached around the exterior wall, downspouts; At the same time, do a good job in various construction procedures of housing construction projects, such as anti-seepage treatment and the completion of glazed tile laying on the roof.

Third, the contract price

According to the construction area per square meter 195 yuan (in words: one million nine hundred and fifty-five yuan), the construction area is calculated according to the calculation rules stipulated by the current national laws and regulations and the actual completed construction area.

Four. mode of payment

70% of the total project cost will be paid for each floor of the main project, and indoor painting will be paid according to the schedule.

Other projects, such as exterior wall bricks, are completed according to the construction requirements, and Party A will pay 20% of the total project cost after passing the acceptance. The remaining 65,438+00% of the total project cost will be used as quality inspection deposit (to deal with natural weather, etc.). ). Since the date of acceptance by Party A, after two heavy rains, the house has no water leakage and other quality problems, 65,438+00% of the total project cost will be paid in one lump sum, and 4,000 yuan will be paid in advance when the foundation is completed.

Verb (abbreviation for verb) The responsibility of both parties.

Party A is responsible for the water and electricity supply and the timely entry of raw materials. Party B must ensure the quality of the project, carry out the construction according to the design drawings and Party A's requirements, save materials, take good care of them and not lose them.

Six, quality requirements

Party B shall organize the construction according to the housing quality standards and requirements stipulated by the state, and Party B shall be responsible for reworking the unqualified ones, and all expenses for rework shall be borne by Party B. ..

Seven, pay attention to safety

For safe and civilized construction, if Party B's construction personnel have accidents such as work-related injuries, all consequences shall be borne by Party B, and Party A shall not bear any responsibilities and expenses. All accidents such as damage and loss to others and property caused by construction shall be borne by Party B, and Party A shall not bear any responsibilities and expenses. Civilized construction, pay attention to professional ethics, pay attention to cleanliness.

Eight, the time limit for a project requirements

The main project duration is 3 months. From the date of signing the contract, Party B must complete the principal part of the project before April of 1, 20__, and the completion time shall not exceed 10 days. Party B shall not delay the completion time of Party A's building for various reasons. Party B shall submit the plan to Party A two days in advance for quick preparation.

9. Other matters not covered shall be settled by both parties through consultation.

This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.

Party A's signature (seal): Party B's signature (seal):

date month year

Article 6 of the housing construction contract

Party A:

Party B:

Through friendly negotiation between Party A and Party B, Party A contracts the homestead housing construction project located in Xiajiawan, He Qiao Village, Jinniu Town, daye city to Party B, and both parties sign this contract on the principle of equality, voluntariness, honesty and credit, and hope that * * * will abide by it together.

First, the contracting method.

The construction project adopts the method of clearing the package, that is, the contractor does not package the materials.

Second, the construction period

This project started on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Demolition of the old: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Start date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Roll-up beam: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Completion time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

If the scheduled construction progress cannot be achieved due to the delay of the project, Party B shall pay a penalty of RMB Yuan to Party A for each day of delay.

Three. Party A's responsibilities

According to the housing construction demand, Party A shall provide the required building materials, such as cement, steel bars, bricks, sand, etc. Ensure Party B's smooth construction within the agreed time limit in time, and Party B can purchase materials by itself.

Put forward guiding suggestions on quality and price.

Four. Party B's responsibilities

Party B shall provide all construction tools, such as templates, mixers, vibrators, scaffolding and concrete mixers. (The freight shall be borne by Party B) and construction personnel such as masters and coolies shall carry out the construction according to the drawings provided by Party A or Party A's requirements, and put forward reasonable suggestions and opinions from a professional perspective.

(1) Contract scope:

1, main building project

Party B is responsible for the construction (including balcony, stairs, windows, septic tanks and other necessary parts) from Party A's pouring of foundation beams to roof capping. Vibrators should be used to water floors, floors and horizontal surfaces as needed.

2. In addition to the main structure of the house, Party B shall also be responsible for the following contents.

(1) Laying of water, electricity and gas pipelines, lines and corresponding supporting facilities (hydropower part)

(2) Exterior walls, kitchens, bathrooms and roofs should be waterproof.

(3) Tile or granite on the ground, porcelain-sticking works such as toilet decoration, etc.

(4) Other ancillary facilities of the house

Install stair railings and balcony plaster strips.

(5) Other equipment to be installed shall be installed by the Seller, otherwise Party B shall be responsible for the installation.

(2) Engineering quality requirements:

1. The wall-building plane should be flat and vertical, with vertical vertex angle, full mortar, smooth and firm watering, smooth and flat white wall, flat and tidy wall tiles, reasonable gaps, and steel bars and binding steel bars should meet the requirements of the drawings. One layer of internal wall cement slurry and two layers of external wall cement slurry.

2. The circuit shall be constructed according to the drawings, with reasonable, standardized and safe layout; Switches and sockets are arranged reasonably and can be used normally.

3. Water pipes and drainage pipes shall be designed according to the drawings or constructed according to the requirements of Party A. ..

Party B shall be responsible for the losses caused by the unqualified quality of the above projects.

V. Engineering Inspection and Acceptance

Without affecting the normal operation of Party B, Party A shall supervise and inspect the progress and quality of the project and accept it within one month after the completion of the project construction.

Six, the project payment calculation method

The main project of the house shall be calculated according to the actual construction area from the time of bricklaying, and calculated according to the 220 yuan contract fee per square meter (the height of half-story cornice shall be negotiated by both parties). The calculation method is as follows: the first floor is measured according to the actual building area, starting from the center line of the external wall; The second floor is calculated according to the measured area of the first floor plus the balcony area.

The working hours for laying the foundation and watering the ground fiber beam and site are calculated at the market price of RMB per day; The porcelain part is calculated at the market price of _ _ _ yuan per day.

Seven, the project payment method

The project payment shall be settled after completion, and 50% of the total project payment shall be paid after the successful completion of the housing construction, 30% after the completion of the project, and 20% of the total project payment shall be paid after three months of completion, with no problem in the quality of the housing.

Eight, quality assurance obligations

Party B shall ensure that the quality of the house built is reliable. If the house has slight quality problems such as water leakage and cracks within one year due to Party B's construction, Party B shall provide it free of charge within one year. Within _ _ _ _ years, if serious quality problems such as foundation sinking are caused by construction, Party B shall rework and rebuild for free.

Nine, safety responsibility

Party B must seriously abide by the construction operation rules, bring safety facilities such as scaffolding, safety belts and helmets, do a good job in safety education for construction personnel, and insist on safety first, quality first and prevention first. In case of any safety accident during construction, Party B shall be responsible, and Party A shall not bear any responsibility.

X. other unfinished business.

1. Party A and Party B shall be responsible for keeping their own materials and tools.

2. On the premise of ensuring the quality, Party B shall take good care of the materials and avoid wasting them.

3. This agreement is made in duplicate, with the same legal effect, and shall come into force after being signed by both parties. If there is any problem in the construction, both parties shall make changes through consultation. Both parties shall earnestly perform this Agreement, and the losses caused by Shang Ruo's breach shall be borne by the breaching party.

4. Matters not covered shall be settled by both parties through negotiation. If negotiation fails, it shall be implemented in accordance with People's Republic of China (PRC) Contract Law and other relevant laws and regulations. Any dispute between Party A and Party B shall be settled through friendly negotiation first. If negotiation fails, either party may bring a lawsuit to the court.

Party A:

Party B:

Date: