Joke Collection Website - Bulletin headlines - Standard version of the model contract for an outer frame

Standard version of the model contract for an outer frame

An outrigger is a variety of scaffolding for construction workers, so how to write the outrigger contract? What should I pay attention to in general? If you don't understand, the following is a model contract for an outer frame, which I compiled for you. Thank you for reading it.

model contract for an outrigger 1

party a:

party b:

in order to ensure that the project is completed on time with good quality and quantity, the policy of "safety first, quality first" is earnestly implemented, the spirit of the project department and the indicators of project quality, construction progress, safe production and civilized construction are further implemented to meet the project requirements, and the principles of sincere cooperation, pragmatism and safeguarding the responsibilities, rights and interests of both parties are adhered to. Party a contracts the single labor cost of the external scaffold to party b, and both parties agree through negotiation to sign this contract:

1. Contracted contents

1. Erection and dismantling of the external scaffold, federated eye network and safety net, and erection and dismantling of building number plates, building number plates, warning signs, slogans and bulletin boards.

2. Laying and dismantling of hard protection of outer frame (including fabrication).

3. Erection and demolition of temporary houses.

4. Construction encirclement (range of fence)

5. Erection and demolition of steel bar and formwork workshop.

6, foundation pit protection.

7. Sticking warning signs for people running ladders and safe passages.

8, basement shear wall and raft reinforced frame.

9. Install the embedded iron parts of the pick-up frame and the embedded wall pipes, and install and dismantle the I-beams.

1. Erection and disassembly of pump pipe rack and cloth rack and erection and disassembly of hard protection (note: vertical pump pipe rack).

11. Maintain the outer frame.

12, four, five limb protection (according to the requirements of the construction unit).

13. Cooperate with the subcontracting team (including the subcontracting team of the construction unit) in the erection and dismantling of shelves.

3. Quality requirements

1. Work in accordance with the documents issued by the state and the requirements of the construction unit.

2. regardless of the construction site, the quantity of shelves, the height of shelves and the type of materials used, the single project contracted must be excellent.

3. The external scaffold, federated eye network and safety net must be clean and in good condition at any time, and the height of the external scaffold protruding from the roof must be uniform.

4. When the shelf is erected, it must be firmly connected with the building.

5. The set-up shelf has good stability and safety, and the scaffold is required not to tilt, bend or shake, and the bars should be horizontal and vertical when the shelf is set up.

III. Safety Responsibility

1. Party B must sign a safety responsibility letter with Party A when entering the site.

2. Party B shall provide qualified safety helmet and safety belt.

3. Party B must carry out the construction in strict accordance with the safety operation regulations (see safety contract), national safety laws and regulations and relevant regulations issued by the Project Construction Committee, the Ministry of Construction and the municipal government.

4. Before entering the site, the team must bring a copy of ID card and valid documents to apply for insurance and tertiary education card. If the insurer fails to apply, the team will bear all the consequences of safety accidents.

5. The minimum age of team members shall not be less than 18 years old and the maximum age shall not be more than 5 years old. Patients with infectious diseases, hypertension and other diseases shall not be employed, and pregnant women and children during lactation shall not enter the construction site. If there is any offender, the accident shall be borne by the team itself.

6. if party b fails to carry out the construction according to the regulations and causes a safety accident, in addition to personal insurance on the site, party b will bear 7% of all expenses, and party a will bear 3% (the 3% only includes the expenses of disability appraisal, and other expenses will be borne by party b).

7. in case of accidental injury of less than 5, yuan (including 5, yuan), Party B shall solve it by itself.

IV. Civilized construction

1. According to the requirements of the project department, the construction of civilized construction issued by the municipal government and the Municipal Construction Committee must be completed, the materials are exhausted and the site is cleared.

2. This project is a standardized construction site.

3. All materials within the contracted scope of this team, including machines and tools, must be stacked and installed according to the requirements of the construction unit and the project department.

4. If it is not cleaned up, Party A will send additional personnel to clean up, and will be fined RMB for each working day.

5. every week, party a will arrange a safety production meeting, and the legal person must attend it. if he fails to attend, he will be fined RMB/time.

V. Time limit requirements

1. Carry out the construction in strict accordance with the progress requirements of the construction unit and Party A..

2. Adequate labor force.

3. according to the actual situation of the sectional works undertaken, the increase and decrease of labor force must be carried out, and the time limit plan of the project department must be implemented.

4. If the single project contracted by Party B fails to meet the above requirements, Party A has the right to deduct the final settlement price of the single project whose quality, progress, civilized construction and safety fail to meet the above requirements as the liquidated damages paid by Party B to Party A, which can be deducted from any payment made by Party A to Party B..

VI. Other responsibilities

1. Party B shall humbly accept the supervision and inspection of the quality inspection department, supervision department and Party A's management personnel during the construction.

2. If the requirements of the project are not met, if Party B's technology is poor, the quality inspection is unqualified, and the labor force is insufficient or stops work for no reason, or breaches the contract halfway, Party A has the right to change the team and terminate the contract, and impose% of the cost of completing the project as compensation for Party A's economic losses.

VII. Unit price

1. Calculated according to the lump-sum construction area of RMB/㎡. (There is no extra charge for demolition, rebuilding and demolition below six floors)

2. There is no management fee for lump sum settlement, including the work contents of the above contract. Documented fees: public security fees, temporary residence fees, and labor protection articles (clothes, sheets, helmets, etc.) are deducted from the unit price.

3. All the above are one-time erection (if the re-erected shelves are not dismantled according to Party A's requirements, it will be regarded as one-time erection).

4. When paying the monthly payment, the team must have the payroll signed by all migrant workers themselves, otherwise, it will be paid after it is perfected.

VIII. Payment settlement method:

IX. This contract is made in duplicate, with each party holding one copy, which shall come into effect from the date of signature, and become invalid after the project is completed and the financial settlement.

1. Matters not covered shall be settled by both parties through consultation.

Party A's representative: Party B's representative:

Tel: Tel:

Model Contract for Outer Scaffolding 2

Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

After negotiation, Party A will contract the scaffolding sub-project of Jufeng and Jiangshanhui A1# Building to Party B for construction in the form of contracting without contracting materials.

1. Project name: old renovation project of the Fifth People's Hospital of Chongqing (Jufeng Development Project)

2. Project location: Renji Road and Tushan Road, Nan 'an District, Chongqing

3. Project scale: the total construction area is about 23, square meters (based on the actual area)

4. Contract scope

1. All external frames of this project. Watering the transportation road, building protection, installation of external frame skirting board, layered belt (including painting), hanging safety net (wire binding shall be purchased by Party B), pre-embedding the embedded parts for the scaffold erection, unloading platform, erection, maintenance, dismantling and external elevator modification (the project department draws a picture in advance), inspection and maintenance of the scaffold body, derusting and painting of the scaffold. As well as the need to build double bent frames for internal protection and pedestrian walkways around it, are all in the contract.

2. All the "four-port and five-edge" safety protection, temporary access, temporary walking stairs, slope railings, main double-row scaffolding, construction elevator platform frame, all kinds of processing and manufacturing rooms and related rooms within the fence are erected and dismantled, and steel pipes are derusted and painted; Manufacture and installation of steel wire rope; Installation of embedded metal ring for channel steel pick-up; Rust removal, painting, installation and removal of channel steel frame; "Submarine" sealing construction of channel steel cantilever layer of outer frame; Cleaning of safety net before and after use; Layout of all publicity slogans on site; Manufacture and installation of the ribbon baffle at the root of the railing near the edge and the mouth of the cave; Safety net bolting and daily maintenance; According to the relevant requirements, re-lay and block protective boards such as bamboo fiber board or bamboo glue board within the safety net of the outer frame; Manufacture and installation of unloading platform. Before scaffolding, the site at the bottom of the steel pipe shall be leveled and the pad shall be made and installed; The embedded parts used for the erection and disassembly of the outer frame shall be embedded, and the outer frame shall meet the requirements of "protective frame and bearing frame" in structural construction and decoration construction. Responsible for the daily maintenance of the "safety net" on the outer frame, and the subcontractor is responsible for repairing the "safety net damage and falling off" caused by whatever reason. The construction waste on the outer frame, the supporting shed and the "seabed" of the scaffold floor shall be removed and transported to the location designated by the Employer on a regular basis (at least once a week). Slope protection around the foundation: if the surface of the slope is covered with colored strips, the protective net structure is erected with steel pipes [including demolition] or the vertical supporting baffle with "steel pipes and bamboo springboard" is erected at the foot of the slope to prevent the slope from falling rocks.

3. All dismantled pipe racks, fasteners are classified and stacked, and they get on and off the floor; The contractor shall provide the safety helmet and safety belt by himself, and the rest labor protection articles (such as raincoats and rain boots) shall be purchased by the contractor at his own expense, and the labor protection articles shall be purchased with intermediate or above products; Party B shall be responsible for purchasing the paint, and Party A shall pay it to Party B at RMB /m2.

4. temporary lighting fixtures and wires for construction lighting shall be provided by party b, and party a is only responsible for three-level power distribution to the operation floor.

v. contracting mode and unit price

this project adopts the mode of contracting without contracting materials (tools): contracting time, quality, safety and civilized construction. The fixed comprehensive unit price calculated according to the construction area per square meter is RMB /m2. If the standard of civilized construction site cannot be reached, the unit price will be lowered by 5%.

VI. Construction progress

1. According to Party A's schedule, reasonably allocate labor to meet the schedule requirements of this project;

2. If the construction progress is affected due to Party B's reasons, a fine of 2_ yuan will be imposed for each affected day, and losses of other teams and groups will be borne;

3. After each pipe rack is dismantled, it must be completely cleaned up within 2 days, otherwise, Party A will send someone to deduct the 3 yuan/day salary at the time of settlement, which will be subject to the builder's acceptance.

VII. Engineering Quality and Acceptance Criteria

1. The quality goal of this project is to create a "civilized model construction site";

2, according to the construction drawings, technical disclosure, design changes, construction scheme and relevant documents and specifications and mandatory standards;

3, according to the current national acceptance specifications and quality inspection evaluation standards for acceptance.

VIII. Safe production and civilized construction

1. Party B must regularly educate the team members on safe production and civilized construction, implement the safety rules and regulations formulated by Party A, and do a good job in safety protection. Party B has the right to refuse illegal instructions and refuse to use materials and equipment that do not meet the safety specifications.

2. strictly abide by the rules and regulations formulated by party a, abide by the law, safeguard the interests and order of the construction site, and do a good job in dormitory hygiene. Cooperate with the responsible person, do not make a fire or cook in the dormitory, and do not use it quickly in the dormitory. iodine tungsten lamp, if found, will be confiscated and fined 1 yuan/time.

3. All operators must bring their ID cards and employment certificates. They are not allowed to take in fugitive criminals, hire child laborers and people who are unable to engage in construction work and are sick. Otherwise, they will be fined and immediately dismissed. Foreigners are not allowed to stay overnight (Party B's operators must hold relevant certificates).

4. When the project is completed, the site will be cleared and materials will be saved. If waste is found, it will be punished at twice the original price.

5. Non-professionals are not allowed to use any mechanical equipment on the construction site, and the resulting safety accidents and losses are their own responsibility.

6. Party B shall bear all the expenses for the accidents caused by violating the operating rules and not paying attention to safety. All mechanical equipment is equipped with dedicated personnel.

7. Party B's personnel must abide by the rules and regulations of the construction site, and strictly implement the National Operating Rules for Safe Production and Mandatory Provisions for Construction Projects. The team leader must coordinate the construction links of each type of work, do not artificially create potential safety hazards and accidents, and earnestly do a good job in safety production. The contractor shall be responsible for the expenses of industrial accidents within 1, yuan each time, and 8% shall be borne by Party A and 2% by Party B if it exceeds 1 million yuan. In case of any safety accident, Party A will find out the reasons and implement the principle that whoever violates the rules shall be responsible. If Party B violates the operating rules and does not listen to the command post, all the expenses of safety accidents shall be borne by Party B.. No matter what the size of the accident, the site builder and safety officer must be notified to be in place.

8, this project must do a good job of safe and civilized construction, and strive for the city's safe and civilized demonstration site.

IX. Responsibilities, obligations and liabilities for breach of contract of both parties

(I) Party A

1. Responsible for providing construction drawings, design changes, construction plans and technical disclosure of drawings to the team;

2. Assign special builders and quality inspectors to supervise and inspect the quality and progress of the project, and participate in the inspection and visa of concealed works, design changes, acceptance and other related matters in time;

3. Coordinate all aspects;

4. due to design changes, the rework expenses caused by Party A's disclosure errors shall be borne by Party A..

(II) Party B

1. Organize the corresponding technicians, labor, mechanical equipment, tools and related materials to enter the site in time according to the blue prints.the design and technical disclosure, and organize the mobilization education and daily safety education of construction personnel;

2. The team leader shall keep in touch with the relevant personnel of Party A at any time, and at the same time do a good job in family planning according to national laws and regulations, and bear corresponding responsibilities;

3. Party B must unconditionally accept the inspection of the project quality by Party A, the project owner and the supervisor, and will be fined 2 yuan for every quarrel;

4. obey the arrangement and scheduling of party a's management personnel. Obey Party A and relevant personnel to supervise, inspect and evaluate the project quality, progress, safe production and civilized construction, and there shall be no resistance, words or actions. Do not strike and make trouble, and offenders will be fined 1~2_ yuan, and bear all the economic losses arising therefrom;

5. If the quality of each single project after Party B's construction is not up to excellent through inspection, Party A will not accept it, and Party B must unconditionally rework it, and Party B will be responsible for the rework expenses and impose corresponding penalties. If the construction period is delayed due to rework, it will directly affect the project progress and be fined 2 yuan/day;

6. If Party A's project schedule cannot be followed, which will affect the construction period, Party A has the right to clear Party B and settle the salary at 8% of the contracted unit price;

7. Pay attention to civilization and hygiene, and don't urinate or urinate outside the toilet, otherwise 2 yuan will be fined every time besides being ordered to clean;

8. Pay attention to comprehensive management: it is strictly forbidden for employees to play cards (including mahjong and poker) or engage in other gambling behaviors at the construction site, and employees are not allowed to fight (hit people) at the construction site.