Table 3.0.2 Safety Management Inspection Scoring Table

Serial number inspection item deduction standards should be scored Number of deducted points Actual points

1 Guarantee project safety production responsibility system If a safety responsibility system is not established, 10 points will be deducted

Departments at all levels fail to implement the responsibility system, and 4~6 points will be deducted Points

There are no safety production indicators in economic contracting, 10 points will be deducted

Failure to formulate safety technical operating procedures for various types of work, 10 points will be deducted

Failure to equip specialized personnel as required (Part-time) safety officer will be deducted 10 points

If the management personnel responsibility system fails to pass the assessment, 5 points will be deducted 10

2 Objective management has not formulated safety management objectives (casualty control indicators and safety Standards and civilized construction goals), 10 points will be deducted

10 points will be deducted for failure to decompose safety responsibility goals

8 points will be deducted for failure to meet the responsibility goal assessment requirements

If the assessment method is not implemented or implemented poorly, 5 points will be deducted. 10 points will be deducted.

3. Construction organization design. If there are no safety measures in the construction organization design, 10 points will be deducted.

The construction organization design will be deducted if the construction organization design is not approved. 10 points

For highly professional projects, if special safety measures are not prepared and implemented separately, 8 points will be deducted

If the safety measures are not comprehensive, 2~4 points will be deducted

Safety measures are not targeted, and 6~8 points will be deducted

Safety measures are not implemented, and 8 points and 10 points will be deducted

Part 4 (sub-item) engineering safety technical explanation has no written technical explanation 10 points will be deducted if the disclosure is not specific

4~6 points will be deducted if the disclosure is not very targeted

4 points will be deducted if the disclosure is not comprehensive

The signature procedures are not completed. 2~4 points deducted 10

5 Safety inspection No regular safety inspection system, 5 points deducted

No safety inspection record, 5 points deducted

An accident occurred during the inspection If the rectification of hidden dangers fails to appoint people, time and measures, 2~6 points will be deducted

If the items listed in the notice of rectification of major accidents and hidden dangers are not completed as scheduled, 5 points10 will be deducted

6 Safety education There is no safety education system, 10 points will be deducted

New workers who enter the factory do not receive the third-level safety education, 10 points will be deducted

There is no specific safety education content, 6~8 points will be deducted

If safety education is not provided when exchanging work types, 10 points will be deducted

For each person who does not understand the safety technical operating procedures of this type of work, 2 points will be deducted

Construction management personnel 5 points will be deducted for failure to conduct annual training as required

5 points will be deducted for full-time safety officers who fail to conduct annual training assessment as required or fail to pass the assessment

Subtotal 60

7 For general items, if a pre-shift safety activity system is not established, 10 points will be deducted

If there is no record of pre-shift safety activities, 2 points will be deducted 10

8 For special operations, 10 points will be deducted If one person works in special operations without training, 4 points will be deducted

If one person works without an operating certificate, 2 points will be deducted10

9 Work-related injuries Accidents Work-related injuries are not reported as required. 3~5 points will be deducted

10 points will be deducted if the work-related injury accident is not handled according to the regulations on accident investigation and analysis

4 points will be deducted if a work-related injury accident file is not established

10 Safety signs If there is no overall layout plan of safety signs on site, 5 points will be deducted

If safety signs are not set up according to the general layout plan of safety signs on site, 5 points and 10 points will be deducted

Subtotal 40

Total of inspection items 100

Table 3.0.3 Civilized Construction Inspection Score Sheet

Serial number inspection item deduction standard deducted points actual Score

1 Guarantee

Guarantee

The project site fence is not set higher than 2.5m around the construction site in the main urban road section

Deduction of 10 points for the fencing

No fencing higher than 1.8m is set up around the construction site on the general road section

Deduction of 10 points

The fencing material is not strong , unstable, untidy and unsightly, 5~7 points will be deducted

The fence is not connected along the perimeter of the construction site

3~5 points will be deducted for continued installation 10

2 3 points will be deducted for closed management of the entrance and exit of the construction site without gates

3 points will be deducted for no doorman and no doorman system

Deduction of 3 points for entering the construction site without wearing a work card

Deduction of 3 points for entering the construction site without a company logo

Deduction of 3 points for entering the construction site without hardening the ground. 5 points

Deduction of 5 points if the road is not smooth

Deduction of 4 points if there is no drainage facilities or poor drainage

Failure to prevent mud, sewage, wastewater from flowing out or 3 points will be deducted for measures to block sewerage and drainage channels

2 points will be deducted if there is water accumulation on the construction site

2 points will be deducted for those who do not have a smoking area or smoke freely on the construction site. Points

Deduction of 4 points for no greening arrangement in warm season 10

4 Deduction of 4 points for stacking of building materials, components and materials that do not follow the general layout

2 points will be deducted if the material pile is not hung with the name, variety, specification and other signs

3 points will be deducted if the pile is not neatly stacked

3 points will be deducted if the site is not cleared after the work is completed

3 points will be deducted for construction waste that is not neatly piled and the name and type are not marked

4 points will be deducted for flammable and explosive items that are not stored in categories 10

5 Deduction of 8 points if the on-site accommodation project under construction doubles as accommodation

Deduction of 6 points if the construction area cannot be clearly separated from the office and living areas

Deduction of 6 points if the dormitory does not have measures to keep warm and prevent mosquito bites 5 points

Deduct 3 points if the dormitory has no measures to cool down and prevent mosquitoes

Deduct 2 points if there are no beds and the daily necessities are not neatly placed

The surrounding environment of the dormitory is not good 3 points will be deducted for hygienic and unsafe conditions. 10 points will be deducted.

6 10 points will be deducted for on-site fire prevention without fire protection measures and systems or no fire extinguishing equipment.

5 points will be deducted for unreasonable fire extinguishing equipment.

p>

If there is no fire water source (high-rise building) or cannot meet the fire protection requirements, 8 points will be deducted

If there is no fire approval procedure and fire supervision, 5 points will be deducted and 10 points

Small Count 60

Serial number inspection item deduction standard deserved points deducted points actual points

7

One

General

p>

Deduction of 4 points for failure to provide study and entertainment areas for workers in the project's comprehensive public security management living area

Deduction for failure to establish a security and protection system and failure to assign responsibilities to individuals

3~5 points

If security precautions are not good and thefts occur frequently, 3~5 points will be deducted 8

8 The sign at the construction site has five signs and one picture at the gate, and the content is incomplete. , 2 points will be deducted if one item is missing

3 points will be deducted if the signage is not standardized and neat

5 points will be deducted if there is no safety slogan

No publicity board, Reading newspaper columns, blackboard newspapers, etc., 5 points will be deducted 8

9 Living facilities toilets do not meet the hygiene requirements, 4 points will be deducted

No toilet, open defecation, 8 points will be deducted

p>

If the canteen does not meet the hygiene requirements, 8 points will be deducted

There is no hygiene responsibility system, 5 points will be deducted

If the supply of hygienic drinking water cannot be guaranteed, 10 points will be deducted

If there is no shower room or the shower room does not meet the requirements, 5 points will be deducted

If the domestic garbage is not cleaned in time, not packed in containers, and there is no dedicated person to manage it

, 3~5 points will be deducted 8

10 Health first aid: 5 points will be deducted if there is no health care medical kit

8 points will be deducted if there are no first aid measures and first aid equipment

There are no trained first aid personnel, 4 points will be deducted

Failure to carry out health and disease prevention publicity and education will be deducted 4 points 8

11 Community services will be deducted 5 points if there are no measures to prevent dust and noise

8 points will be deducted for construction without permission at night

5 points will be deducted for burning toxic and harmful substances on site

5 points will be deducted for failure to establish construction measures that will not disturb residents

Subtotal 40

The total number of inspection items is 100

Note: 1. The maximum deduction points for each item shall not be greater than the points earned for that item.

2. If one of the guaranteed items is not scored or the subtotal score of the guaranteed items is less than 40 points, zero points will be calculated by checking the tie table.

3. After converting this table to Table 3.0.1, the score = 20*total actual scores for the inspection items in this table/100

Table 3.0.4-1 Inspection of floor-standing external scaffolding Rating table

Serial number inspection item deduction standard deserved points deduction points actual points

1 Guarantee

Project construction

Method 10 points will be deducted if the scaffolding has no construction plan

10 points will be deducted if the height of the scaffolding exceeds the specifications and there is no design calculation sheet or without approval

5~8 points will be deducted if the construction plan cannot guide the construction. Points 10

2 poles

For every 10 meters of foundation extension, 10 points will be deducted if the pole foundation is uneven, unreliable, or does not meet the design requirements of the plan

Every 10 5 points will be deducted if the extended meter pole lacks a base or skids

5 points will be deducted for every 10 extended meters if there is no sweeping pole

Every 10 extended meters of wooden scaffolding poles are not buried in the ground or 5 points will be deducted if there is no sweeping pole

3 points will be deducted10 for every 10 meters of extension without drainage measures

3. The height of the scaffolding connected to the building structure is more than 7m, and the height of the scaffolding is more than 7m. For building structure ties, 2 points will be deducted for each missing point according to regulations

1 point and 10 points will be deducted for each place where the tie is not strong

4. The spacing between the members and the scissor braces will be deducted for each 10. 2 points will be deducted for each place where the spacing between the extended meter poles, large crossbars and small crossbars exceeds the specified requirements

5 points will be deducted for each place where scissor braces are not set up as required

If the scissor supports are not set continuously along the height of the scaffold or the angle does not meet the requirements, 5 points and 10 points will be deducted

5. If the scaffolding boards and the protective railings are not fully paved, 7 to 10 points will be deducted

If the prototype material does not meet the requirements, 7~10 points will be deducted

2 points will be deducted for each probe board

If there is no dense mesh safety net on the outside of the scaffold, or the net is not tight, 7~10 points will be deducted

If there are no 1.2m high protective railings and toe boards on the construction floor, 5 points will be deducted10

6. If there is no communication and acceptance before the scaffolding is erected, 5 points will be deducted

If the scaffolding is erected but does not go through the acceptance procedures, 10 points will be deducted

If there is no quantitative acceptance content, 5 points will be deducted 10

Subtotal 60

7. If the small crossbar is not set according to the intersection of the vertical pole and the large crossbar, 2 points will be deducted for each place.

1 point will be deducted for each place where the small crossbar is only fixed at one end

For each small crossbar of a single row of shelves inserted into the wall less than 24cm, 2 points and 10 points will be deducted

8 poles overlap wooden vertical poles, and each large crossbar overlaps less than 24cm. 1.5 meters, 1 point will be deducted

2 points will be deducted for each place where the steel pipe vertical pole is overlapped 5

No flat net or other materials are used every 10m below the closed construction layer in the 9 frame 5 points will be deducted if the measures are closed

5 points will be deducted if the vertical poles in the construction layer scaffolding and the building are not closed. 5 points

10 The diameter and material of the wooden poles of the scaffolding do not meet the requirements. 4~5 points will be deducted

4~5 points will be deducted if the steel pipe is severely bent and rusted 5

5 points will be deducted if the 11-channel frame does not have upper and lower channels

1~3 points will be deducted if the channel setting does not meet the requirements. 5

12 Unloading platform. 10 points will be deducted if the unloading platform is not designed and calculated.

10 points will be deducted if the unloading platform does not meet the requirements.

8 points will be deducted for the connection between the unloading platform support system and the scaffolding

3 points and 10 points will be deducted for the unloading platform without a limited load sign

Subtotal 40

p>

The total number of inspection items is 100

Note: 1. If the scaffolding is found to be a combination of steel and wood, steel and bamboo, or a single row of bamboo scaffolding, the inspection score will be zero points

2. The maximum points deducted for each item shall not be greater than the points earned for that item.

3. If one of the guaranteed items is not scored or the subtotal score of the guaranteed items is less than 40 points, zero points will be calculated by checking the tie-breaking table.

4. After converting this table to Table 3.0.1, the score = 10*the total actual scores of the inspection items in this table/100

Table 3.0.6 Template Engineering Safety Inspection Score Table

Serial number inspection item deduction standard points deserved points deduction points actual points

1 Guarantee that the project construction plan template project has no construction plan or the construction plan has not been approved

Deduction of 10 points for approval

Deduction of 8 points for failure to formulate targeted safety measures according to the concrete transportation method 10 points

2 Support system Deduction for the support system of the cast-in-place concrete formwork without design calculation 6 points

10 points will be deducted if the support system does not meet the design requirements 10

3. 6 points will be deducted if the column material of the 3-column stable support template does not meet the requirements

Column 6 points will be deducted if there is no backing plate at the bottom or if bricks are used to raise the height

4 points will be deducted if the vertical and horizontal supports are not set up as required

5 points will be deducted if the distance between the columns does not meet the requirements

p>

4 Construction load If the construction load on the formwork exceeds the prescribed limit, 10 points will be deducted

If the material stacking on the formwork is uneven, 5 points and 10 points will be deducted

5 Formwork storage Large formwork storage None 5 points will be deducted for anti-tipping measures

Various templates are not stored neatly or are too high and do not meet safety requirements

5 points will be deducted 10 points

6 dismantled templates 8 points will be deducted for working at a height of more than 2m without a reliable footing

5 points will be deducted if there is no warning line in the demolition area and there is no guardian

4 points will be deducted for leaving undemolished suspended formwork. Points 10

Subtotal 60

7 General project formwork acceptance If the formwork application is not approved before removal, 5 points will be deducted

Formwork projects without acceptance procedures 6 points will be deducted

4 points will be deducted if the acceptance form does not have quantitative acceptance content

5 points will be deducted if the formwork is dismantled without safety technical explanation 10

8 Concrete strength 5 points will be deducted if there is no concrete strength report before the formwork is removed

8 points will be deducted if the concrete strength does not meet the requirements and the formwork is removed in advance 10 points

9 Transport roads transport concrete on the formwork without walkway pads 7 points will be deducted

3 points will be deducted if the walkway pad is unstable and 10 points will be deducted

10 Working environment 10 points will be deducted if there are no protective measures on the working surface and adjacent sides

10 points will be deducted for vertical operations without isolation and protection measures 10 points

Subtotal 40

Total inspection items 100

Note: 1. Maximum of each item The points deducted shall not be greater than the points deserved for the item.

2. If one of the guaranteed items is not scored or the subtotal score of the guaranteed items is less than 40 points, zero points will be calculated by checking the tie table.

3. The score after converting this table to table 3.0.1 = 10*total actual scores for inspection items in this table/100

"Three Treasures" and "Four Ports" protection inspection scores Table 3.0.7

Serial No. Inspection Items Deduction Standard Points Scored Points Deducted Points Actual Points

1 Safety helmet If one person does not wear a safety helmet, 5 points will be deducted

One point will be deducted for each helmet found that does not meet the standards

One person who does not wear a helmet as required will be deducted 1 point and 20 points

2 Safety net construction project in progress 25 points will be deducted if the outside is not closed with a dense mesh safety net

25 points will be deducted if the specifications and materials of the safety net do not meet the requirements

The safety net has not been approved by the construction safety supervision and management department. 25 points will be deducted for certificates 25

3.5 points will be deducted for each person who does not wear a seat belt

3 points will be deducted for each person who fails to wear a seat belt

>

Safety belts that do not meet the standards will be deducted 2 points and 10 points for each one found

4. 5 points will be deducted for each stairwell and elevator shaft protection without protective measures

Every 3 points will be deducted if the protective measures do not meet the requirements or are not strict

6 points will be deducted if the protective facilities are not standardized and tooled

Every two floors in the elevator shaft (not larger than 10m ) 6 points will be deducted if there is one less flat net. 12

5. 7 points will be deducted if there is no protective measures for each reserved hole and pit protection.

The protective facilities have not been standardized and tools. Deduction of 6 points

Deduction of 3 points for each protective measure that does not meet the requirements or is not strict13

Deduction of 5 points for protection of 6 passage entrances without protective sheds

2~3 points will be deducted for each place where the protection is not tight

3 points will be deducted for each place where the protective shed is not strong and the material does not meet the requirements. 10

7 5 points will be deducted for each edge without protection on balconies, floors, roofs, etc.

3 points and 10 points will be deducted for each edge with lax protection that does not meet the requirements

The total number of inspection items is 100

Note: 1. The maximum points deducted for each item shall not be greater than the points deserved for that item.

2. If one of the guaranteed items is not scored or the subtotal score of the guaranteed items is less than 40 points, zero points will be calculated by checking the tie-breaking table.

Deduction standard for serial number inspection items: points earned, points deducted, and actual points earned

1 If the external electrical protection of the project is ensured to be less than a safe distance and there are no protective measures, 20 points will be deducted

Protective measures do not meet the requirements, and 5 to 10 points will be deducted if the sealing is not tight

2 Grounding and zero connection protection system working grounding and repeated grounding do not meet the requirements, 7 to 10 points will be deducted

10 points will be deducted if the TN-S system is not adopted

5~8 points will be deducted if the dedicated protection neutral line setting does not meet the requirements

The protection neutral line and the working neutral line are mixed Deduction of 10 points 10

3. Deduction of 10 points for the switch box of the distribution box that does not meet the requirements of "three-level distribution and two-level protection"

The switch box (last stage) has no leakage protection or If the protector fails, 5 points will be deducted for each fault.

If the parameters of the leakage protection device do not match, 2 points will be deducted for each fault found.

If there is no isolating switch in the electrical box, 2 points will be deducted for each fault.

Five to 7 points will be deducted for each violation of "one machine, one gate, one box"

Deduction for each violation of "one machine, one gate, one box" will be deducted for each inconvenient installation location, excessive debris around, etc. 5 points

5 points will be deducted for each place where the brakes are damaged or do not meet the requirements

2 points will be deducted for each unmarked multi-channel power distribution in the distribution box

20 points will be deducted for each part of the electrical box that has no door, no lock, and no rainproof measures

4. 5 points will be deducted for the special circuit for on-site lighting that has no leakage protection

2 points will be deducted for each point in the metal shell of the lamp that is not protected from zero connection

10 points will be deducted if the installation height of indoor circuits and lamps is lower than 2.4m and no safe voltage power supply is used

10 points will be deducted for failure to use a safe voltage below 36V in wet work

5 points will be deducted for using a 36V safe voltage lighting circuit that is messy and the joints are not wrapped with insulating cloth

hand-held lights are not used 10 points will be deducted for power supply using 36V and below power supply 10

Subtotal 60

5 General items Deduction of 10 points for aging, broken and unwrapped wires of distribution lines

p>

Deduction of 5 points for each unprotected line corridor

Deduction of 5 points for poles and crossbars that do not meet the requirements

Deduction of 7 points for overhead lines that do not meet the requirements ~10 points

Deduction of 10 points for not using a five-core cable (cable)

Deduction of 10 points for using a four-core cable plus one wire instead of a five-core cable

7 to 10 points will be deducted if the cable erection or burial does not meet the requirements. 15

6. 3 points will be deducted for each electrical device where the brakes and fuse parameters do not match the equipment capacity and the installation does not meet the requirements.

p>

10 points will be deducted if other metal wires are used instead of fuses10

7 3 points will be deducted if the power distribution device does not comply with safety regulations

8 No electricity usage file 10 points will be deducted for the organization and design of special electricity construction

4 points will be deducted for no ground resistance shake measurement record

4 points will be deducted if there is no electrician inspection and maintenance record or the filling is untrue

Three points and 10 points will be deducted for files that are messy, incomplete, or not managed by dedicated personnel

Subtotal

Total of inspection items

Note: 1. The maximum points deducted for each item shall not be greater than the points earned for that item.

2. If one of the guaranteed items is not scored or the subtotal score of the guaranteed items is less than 40 points, zero points will be calculated by checking the tie-breaking table.

3. After converting this table to Table 3.0.1, the score = 10*total actual scores for the inspection items in this table/100

Tower Crane Inspection Score Table 3.0.11

Serial number guarantee project points deduction standard deserved

Points deduction

Points actually earned

Points

1 Guaranteed

Certificate

Item

Item torque limit

The controller does not have a torque limiter, 13 points will be deducted

Torque If the limiter is not sensitive, 13 points will be deducted. 13

2.5 points will be deducted for each item if the limiter does not have super height, amplitude, or walking limit.

5 points will be deducted for each item if the limiter is not sensitive. 5 points for the item 13

3. Safety device: 5 points for the hook without a safety device

5 points for the winch drum without a safety device

Supervisor If the ladder does not meet the requirements without a retainer, 5 points will be deducted. 7

4 Wall-attached devices

If the height of the tower crane with rail clamp exceeds the regulations and no wall-attached device is installed, 10 points will be deducted

>

If the wall-mounted device does not meet the requirements of the instruction manual, 3~7 points will be deducted

If there is no rail clamp, 10 points will be deducted

If there is a rail clamp, no need to use it everywhere, 3 points will be deducted Points 10

5 Installation and disassembly

10 points will be deducted if the installation and disassembly plan is not formulated

10 points will be deducted if the operating team does not obtain the qualification certificate10

6 Tower crane command drivers who work without a certificate will be deducted 7 points

The command driver who is working without a certificate will be deducted 7 points

The tower crane driver who does not use flags or walkie-talkies will be deducted 7 points7

Subtotal 60

7-7

General

The project subgrade and

the track subgrade are not solid and Level and no drainage measures, 3 points will be deducted

The sleeper laying does not meet the requirements, 3 points will be deducted

The number of road spikes and joint bolts is insufficient, 3 points will be deducted

If the track gauge deviation exceeds the specified limit, 2 points will be deducted

There is no limit position blocker on the track, 5 points will be deducted

The tower foundation does not meet the design requirements, 10 points will be deducted10

8 Electrical safety traveling tower crane has no reel or fails, 6 points will be deducted

The distance between the tower crane and the overhead line is less than a safe distance and there are no protective measures, 10 points will be deducted

Protective measures are not available If the track meets the requirements, 2~5 points will be deducted

If the track is not grounded or connected to zero, 4 points will be deducted

If the grounding or zero connection does not meet the requirements, 2 points and 10 points will be deducted

9 Multi-tower operation with more than two tower cranes and no anti-collision measures, 10 points will be deducted

The measures are unreliable, 3~7 points will be deducted 10

10 Installation acceptance after installation is completed None 10 points will be deducted for acceptance documents or signed by the responsible person

If there is no quantitative acceptance content on the acceptance form, 5 points will be deducted 10

Subtotal 40

Total inspection items 100

Note: 1. The maximum points deducted for each item shall not be greater than the points deserved for that item.

2. If one of the guaranteed items is not scored or the subtotal score of the guaranteed items is less than 40 points, zero points will be calculated by checking the tie table.

3. After converting this table to Table 3.0.1, the score = 5*total actual scores for the inspection items in this table/100

Construction Machinery Inspection Score Table 3.0.13

p>

Serial number inspection item deduction standards deserved

Points deducted

Points actually earned

Points

1 level If there is no acceptance procedure after the planer is installed, 5 points will be deducted

If there is no hand guard safety device, 5 points will be deducted

If there is no protective zero connection and no leakage protector, 5 points will be deducted. Points

Deduction of 3 points for not cutting off the power supply when no one is operating

Deduction of 20 points for using both planing and disc sawing 10 points

2 discs 5 points will be deducted for failure to pass the acceptance procedures after the installation of the electric saw.

5 points will be deducted for each missing item such as saw disc guard, feeder, protective baffle safety device and transmission.

Deduction of 5 points for failure to connect zero and no leakage protector

Deduction of 3 points for failure to cut off the power supply when no one is operating 10 points

3 Hand-held Electrician Tools Category I hand-held electric tools are deducted 10 points for unprotected zero connection

Five points are deducted for using Category I hand-held electric tools without wearing insulating materials as required

Using hand-held electric tools to connect the zero at will 5 points will be deducted if the power cord is long or the plug is replaced. 10

4. 5 points will be deducted if there is no acceptance procedure after the steel bar machinery is installed

There is no protective connection or leakage protector. 5 points will be deducted each

5 points will be deducted for the steel bar cold drawing operation area and the butt welding operation area without protective measures

3 points and 10 points will be deducted for the transmission parts without protection

5 5 points will be deducted if the welding machine fails to pass the acceptance procedures after installation

5 points will be deducted if there is no protective zero connection and no leakage protector

No secondary no-load 5 points will be deducted for the voltage-reducing protector or anti-shock device

5 points will be deducted if the primary wire length exceeds the regulations or no conduit protection is used

The welding wire has more than 3 joints or the insulation is aged. 5 points will be deducted

3 points will be deducted if the power supply does not use an automatic switch

4 points will be deducted if the welding machine does not have a rain cover 10

6 Mixer After installation of the mixer 5 points will be deducted for failure to pass the acceptance procedures

5 points will be deducted for failure to perform protective zero connection and leakage protector

deduction for each failure of clutches, brakes and wire ropes to meet the requirements. 3 points

Deduction of 3 points if the operating handle does not have a safety device

Deduction of 4 points if the mixer does not have a rainproof cover and an unsafe workbench

Deduction of 4 points if the mixer does not have a safety hook 3 points will be deducted if the hook or hook is not used

4 points will be deducted if the transmission part has no protective cover

3 points will be deducted 10 if the working platform is unstable

7 gas cylinders 5 points will be deducted for various gas cylinders without standard color labels

5 points will be deducted for gas cylinders that are less than 5m apart, less than 10m away from an open flame and have no isolation measures

When using or storing acetylene bottles 5 points will be deducted for lying flat

5 points will be deducted for gas cylinders that do not meet the requirements

2 points and 10 points will be deducted for each gas cylinder without shockproof ring and protective cap

8 Dump truck A dump truck without a license will be deducted 5 points

A dump truck with an insensitive braking device will be deducted 5 points

A driver without a license will be deducted 5 points

5 points and 10 points will be deducted for each time a vehicle is used for carrying people or driving illegally

9. 5 points will be deducted for each submersible pump without protective zero connection and no leakage protector

5 points will be deducted if the protection device is not sensitive and the use is unreasonable

10 Piling machinery The pile driver does not obtain a license and there is no acceptance procedure after installation. 5 points will be deducted

Pile driver 5 points will be deducted if there is no ultra-high limit device

5 points will be deducted if the endurance of the pile driver's walking route does not meet the requirements of the instruction manual

5 points will be deducted if there is no plan for the piling operation

If the piling operation violates the operating procedures, 5 points will be deducted and 10 points will be deducted

The total number of inspection items is 100 points

Note: 1. The maximum points deducted for each item shall not be greater than the points deserved for that item.

2 After converting this table to Table 3.0.1, the score = 5*total actual scores for the inspection items in this table/100

Safety inspection standards and related "Specifications"

Related "Specifications" and relevant standard regulations for the serial number safety checklist

1 Unified regulations for the preparation of safety technical standards for construction scaffolding for floor-standing external scaffolding

(Revised Draft 1997)

"Safety Technical Specifications for Fastener Steel Pipe Scaffolding in Construction"

JGJ130—2001

2 Door Type Scaffolding "Safety Technical Specifications for Door Type Steel Pipe Scaffolding in Construction" 》

JGJ128-2000

3 Hanging racks and hanging racks "Safety Technical Specifications for Tool Scaffolding" (not issued)

"Hanging racks for working at heights" Safety Rules" JGJ5027-92

4 Interim Provisions on the Management of Attached Lifting Scaffolding in Building Construction

[Jianjian (2000) No. 230]

5 "Three treasures and four mouths" protection "Technical Specifications for Safety in Construction Work at Heights" JGJ80-91

Hard hat (GB2811-81)

Safety belt (GB6095-85)

Safety net (GB5735-85)

Classification of working at heights (GB3608-83)

Dense mesh safety net (GB16909-1997)

6 Foundation Pit Support "Technical Specifications for Construction Foundation Pit Support" JGJ120-99

7 Formwork Engineering "Safety Technical Specifications for Formwork Engineering in Construction" (not issued)

8 Construction Electricity "Technical Specifications for Safety of Temporary Electricity at Construction Sites" JGJ46-88

Construction Organization Design for Temporary Electricity at Construction Sites

Safety Technology for Temporary Electricity at Construction Sites

p>

Installation and operation of leakage protector (GB1395-92)

Leakage current action protector (GB6819-86)

Safety voltage (GB3805-83)

9 Material hoist "Safety Technical Regulations for Gantry and Derrick Material Hoist" JGJ88-92

10 External elevator "Safety Technical Regulations for the Use of Construction Machinery" JGJ33-86

"Construction Machinery Technical Test Regulations" JGJ34-86

Construction Lifts (GB10052-1996)

11 Tower Crane Construction Ministry "Several Provisions on Strengthening the Safe Use and Management of Tower Cranes"

"Safety Regulations for Construction Tower Cranes" GB5144-94

"Technical Regulations for Safety in the Use of Construction Machinery" JGJ33-86

"Technical Test Regulations for Construction Machinery" JGJ34 -86

"Safety Regulations for Hoisting Machinery" GB6067-86

12 Lifting and Hoisting "Safety Technical Regulations for Lifting and Hoisting in Construction" (not issued)

Safety Regulations for Hoisting Machinery (GB6067-86)

13 Construction Machinery "Technical Regulations for Safety in the Use of Construction Machinery" JGJ33-86

"Management, Use and Inspection of Hand-held Power Tools" and Maintenance Safety Technical Regulations" GB3787-83

Extended reading: How to buy insurance, which one is better, and step-by-step instructions to avoid these "pitfalls" of insurance