Joke Collection Website - Bulletin headlines - Who has a winter construction safety plan... It is a safety plan for winter, thank you, for high-altitude operations, steel structures, and metal roofs.
Who has a winter construction safety plan... It is a safety plan for winter, thank you, for high-altitude operations, steel structures, and metal roofs.
Special Plan for Winter Construction Safety
In order to ensure the safety of construction workers in winter and ensure the quality of the project, this measure is specially formulated in accordance with relevant national industry standards.
1. General requirements
1. Plan quality assurance measures for winter construction;
2. Take anti-snow, anti-freeze and other measures for various facilities and materials in advance ;
3. Construction process requirements and safety measures should be specially formulated for prestressed tensioning;
4. The concrete mix ratio should consider winter construction conditions;
5. The laying of waterproof layers should be carried out in accordance with the relevant regulations for winter construction of waterproof layers;
6. Formulate safety measures such as fire prevention, anti-freezing, and anti-gas poisoning for winter construction;
7. Prepare workers in advance Conduct briefings on winter construction technology;
8. Contact the meteorological department to prepare winter temperature forecasts.
2. Other precautions for winter construction
1. When working at heights, strengthen safety management and safety measures, and take reliable wind protection measures;
2 . When welding steel structures during winter construction, corresponding welding processes should be adopted to ensure the welding quality;
3. During winter construction, strengthen the heat preservation and maintenance of mechanical equipment to ensure that the equipment can operate normally;
p>
4. Construction should be stopped in strong winds, heavy snow, and foggy days;
5. If you are continuously hit by cold weather, you can consider suspending surface concrete construction operations such as piers and box beams, etc. Construction will be carried out after the temperature warms up.
6. Clear the snow on the upper and lower stairways of construction in a timely manner, and anti-slip measures should be taken in special locations.
3. Relevant Precautions
1. It is prohibited to use young workers under the age of 18 to engage in any construction production work and other work on the construction site. If they are found to be used during the inspection, they will be required to be cleared immediately. Refund, and a fine of 5,000 yuan per person will be imposed on the user;
2. Construction workers at all levels entering the construction site must receive safety technical training from the personnel and education department of the project department of each work area, and can only be arranged after passing the examination If found to be working without training, the employer will be fined 500 yuan per person;
3. Each work area must set up safety placards at dangerous working locations such as the entrance to the construction site, high altitudes, and water operations. , set warning signs in dangerous places such as power distribution rooms and explosives depots;
4. Anyone who works at a height of more than 2 meters should undergo regular physical examinations in accordance with relevant regulations. Anyone with heart disease, high blood pressure, Persons with epilepsy, severe anemia, disabled hands and feet, impaired vision and hearing, or others who are not suitable for working at heights are not allowed to work at heights, and working under the influence of alcohol is strictly prohibited;
5. All purchased safety belts Must comply with the GB6095-85 "Seat Belt" standard, the safety net must comply with the (GB5725-5726) standard, and the safety helmet must comply with the requirements of the GB2811-89 standard to ensure the quality of safety protection supplies; the safety belt should have a test qualification mark, generally every A load test should be conducted every 6 months. The static load test can be 225 kg and stopped for 5 seconds for observation, or the impact test can be 120 kg at a height of 2 meters above the ground (the tested safety belt should be scrapped on the spot). Safety nets should be tested according to regulations before use and can be used only after passing the test;
6. Safety helmets and corresponding safety protection equipment must be worn when entering the construction site, safety belts must be worn when working at heights, and safety nets must be worn when working on water. Wear a life jacket, and the safety belt should be hung in a secure place above the operator. During mobile operations, it should be taken off and hung up;
7. Before operation, check the scaffolding boards where you walk and stand at the operation point. Use railings or safety nets in empty spaces, go up and down ladders, and ensure that safety regulations are met before proceeding with operations. Those who are unqualified may refuse construction at high places and notify the project department of the work area to order them to make rectifications;
8. Construction areas When the wind force is level 6 or above (including level 6), high-altitude operations and lifting operations should be stopped;
9. Improve scaffolding platforms, water construction operating platforms, and floating crane and floating body operating platforms. The construction platform is required to be fully paved with wooden scaffolding boards, and railings are installed on the floating crane, the water side of the floating body, and the floating ceiling working platform. The height of the railings is not less than 1.2 meters and the spacing is less than 750px.
Safety nets must be hung around the support and platform of the work platform, and dense protective nets must be set up around construction scaffolding to ensure that personnel, tools, and accessories do not fall, and to prevent objects from falling and injuring people. Materials used in high-altitude operations should be tied securely with ropes. , small materials should be placed in tool bags for lifting and transportation, and throwing is strictly prohibited. When not in use, they should be placed in small tool boxes to prevent falling injuries and injuries;
10. It is prohibited to place items on the formwork or structure When climbing up, it is strictly prohibited to use cranes, tower cranes, lifting buckets, etc. to lift people;
11. When setting up suspended ladders, their suspension points and strapping should be firm and reliable, and there should be personnel when using them. Check regularly and deal with abnormalities in time if found;
12. Workers working at heights and on the water must be flexibly dressed, and must not be shirtless. They must wear soft-soled non-slip shoes under their feet, and must not wear slippers, hard-soled shoes and Studded, easy-to-slip boots. All safety operating procedures and labor disciplines must be strictly observed during operation;
13. Materials used in operations at heights and on water should be stacked smoothly and should not be placed on the edge or near the entrance, nor should they obstruct traffic. and loading and unloading. Walkways, access boards and climbing equipment during operation should be cleaned at all times. Disassembled objects, remaining materials and waste materials must be cleaned and transported away in time, and must not be randomly littered or discarded downwards. Objects cannot be thrown when passing them around. In each construction site, any materials that may fall must be removed or fixed first to prevent them from falling and injuring people;
14. If any materials are found at high places or on water during the construction process, safety precautions must be taken. If there are any defects or hidden dangers in the facilities, they must be reported promptly and resolved immediately. For potential hazards that endanger personal safety, operations should be stopped immediately. No one is allowed to move or dismantle all safety protection facilities and safety signs without authorization. Some items that are indeed temporarily dismantled or moved due to construction needs must be approved by the construction leader before they can be removed and restored immediately after the work is completed;
15. If scaffolding boards need to be erected , should be erected before work. If the work requires temporary dismantling of the scaffolding boards or safety nets that have been erected, they should be restored in time after completion.
16. When tying steel bars and installing steel skeletons, necessary scaffolding and horse trails must be set up, and operating platforms, racks and hanging safety nets must be set up to ensure that operators can operate on scaffolds, scaffolding or operating platforms, and the operators must Safety belts must be worn as required;
17. Avoid double-layer operations or multi-layer operations as much as possible. When unavoidable, use scaffolding boards to isolate different working surfaces. Strengthen the closed management of the construction site, arrange for on-duty personnel under the piers to strengthen the lookout, and non-operators are not allowed to enter the construction site;
18. Special personnel should be assigned to check the bracket connection bolts, pull bolts and diagonal braces, etc. Whether it is loose, tighten and reinforce it at any time to ensure the stability of the bracket and working platform;
19. It is strictly prohibited to walk or work on scaffolding, formwork and unstable structures that have not been firmly fixed. When you must pass, you should use Pass forward on horseback;
20. It is strictly forbidden to pull or overlap wires. All electrical appliances must be equipped with leakage protectors. Electrical switches, sockets and other facilities should be installed and fixed firmly, and equipped with protective covers to protect personnel. Touch and leakage. Non-professionals are prohibited from performing electrical work;
21. Construction operations such as steel bar processing and formwork hoisting must abide by the corresponding mechanical safety operating procedures. Construction operations such as steel bar processing and formwork hoisting must abide by the corresponding mechanical safety regulations. operating procedures.
22. Hoisting tools such as wire ropes, hemp ropes, and snap rings used in hoisting must be matched with each other and replaced in time as required;
23. Strictly follow the issued items The construction of hoisting, steel bars, formwork, etc. must be carried out according to the process and specifications. Problems must be handled according to the requirements of the on-site technical personnel. Without consent, the next step of construction is not allowed;
24. The safety facilities at the construction site are not in place or If there are obvious defects, they will not be allowed to proceed to the next step of construction;
25. The project department of each work area must carefully inspect and implement the safety facilities and safety behaviors of each operation team in accordance with relevant regulations, urge them to rectify as required, and Cooperate to solve problems such as the use of tools and the improvement of safety facilities during the hoisting process, and be responsible for determining whether wire ropes and other hoisting tools should be scrapped and replaced in a timely manner.
26. Operations that violate construction processes, specifications and safety technical regulations If the construction fails and this measure is implemented, the relevant responsible unit will be given a financial penalty of 500-5,000 yuan in accordance with the regulations of the headquarters.
- Related articles
- What is the symbol of Mi Xue Ice City?
- What is the unit of kva?
- A good word for the completion of a new home
- China Consumers Association and other eight departments proposed to stop food waste.
- What watermarks can be seen in the light transmission observation of the new RMB 100 banknote?
- A summary of the jingle sentences that almost all teachers in the country can say in class
- What are the four words for greeting children?
- A journey to purify the soul¡ªLuofu Pure Land Humanities Memorial Park
- The fourth grade math tabloid is simple and beautiful.
- Send a friend if you smoke.