Joke Collection Website - Bulletin headlines - Garden construction plan

Garden construction plan

1. Project Overview

2. Construction Layout: Based on the preliminary information about the project and the construction site conditions, combined with the company’s previous construction experience and work capabilities, the layout of the project is formulated. Construction layout.

3. Construction preparation

1. Construction site preparation:

1.1. Set up four mobile rooms as the office space of the project department, five mobile rooms and Four brick buildings are used as staff dormitories to write slogans and project overview and other relevant information, and one brick warehouse is set up as a storage place for tools, utensils and scattered materials;

1.2. Use an excavator to dig and drain water on site ditch to ensure that there is no accumulation of water in the construction site and that the water flows to low-lying areas for concentrated discharge;

1.3. Review and test the permanent coordinates and elevation control points provided by the construction party, measure the construction site control network, and layout After checking the control piles, they should be fixed and protected with concrete, and flags should be inserted to avoid damage.

1.4. Calculate the engineering quantities and material analysis according to the construction drawings provided, and organize the arrival of mechanical equipment and materials in a planned manner based on the calculation results and stack them at the designated location;

1.5. Construction For electricity, a main distribution box, buried overhead poles, main distribution box, and secondary distribution box are set up. The branch adopts a three-phase five-wire system, and the lighting power is a single-phase three-wire system. In addition to the working neutral line, additional A duplicate ground wire. All distribution boxes use standard meter boxes.

2. Construction machinery preparation: Implement according to the construction machinery demand plan, detailed appendix: "Main Construction Machinery List"

3. Building material preparation

3.1. Provide samples to the owner according to the drawing design requirements. Procurement can only be carried out after confirmation by the designer;

3.2. Most of the materials used in this project are purchased from our company’s stable suppliers or from the origin specified by the owner. All materials are formulated before entering the site. Detailed material purchasing plan.

4. Preparation of labor organization plan

4.1. Allocate sufficient management personnel according to the established on-site management organization structure, and formulate a management system at the same time.

4.2. Construction personnel entering the site must undergo on-site education, including learning about the management systems of our company and the project department, safety knowledge education, and basic construction procedures.

5. Technical preparation

5.1. Be familiar with and review construction drawings, actively contact the design institute, and strive to solve problems in the drawings before construction;

5.2. Prepare and approve the construction organization design and construction drawing budget to prepare for the start of the project;

5.3. Propose plans for machinery, component processing, materials and outsourced processing, and strive to ensure the progress of the construction period;

5.3. p>

5.4. Draw a large construction drawing according to the design requirements and the needs of the owner;

5.5. Organize and implement the labor plan proposed based on the budget to ensure the construction requirements.

IV. Construction methods of major divisions and projects

V. Technical quality assurance measures

VI. Civilized construction assurance measures

7. Measures to ensure production safety

8. Measures to ensure construction period

9. Protection measures for rainy season construction Construction in the rainy season mainly focuses on prevention, and adopts rainproof measures and strengthened drainage means to ensure Production is carried out normally during the rainy season and is not affected by seasonal climate.

Strengthen rain information feedback, and take preventive measures to eliminate problems that have occurred in recent years.

Site drainage: The construction site and component production base should be dredged according to the terrain and ground drainage system to ensure smooth water flow and no accumulation of water.

10. Maintenance and after-sales service Our company pursues the tenet that quality is the life of an enterprise. Not only do we strictly control quality during the construction process, but we also take corresponding rigorous measures for after-sales service.