The construction process of paint is as follows:
1. Base cleaning
It is to clean and smooth the surface so that the following steps can proceed smoothly.
2. Apply interface agent
Before painting, you must first apply a layer of interface agent on the top of the wall, mainly to prevent the paint from falling off.
3. Ceiling joint treatment
The joints between the ceiling board and the board are easy to crack, so kraft paper must be pasted first.
4. Stick the wall protector
The wall protector fixes the putty on the wall. All walls must be scraped except the wall behind the cabinet.
5. Apply corner strips to the yin and yang corners
The corner strips can make the yin and yang corners form straight edges to resist breakage and cracking.
6. Paint scraping
After scraping the rough yellow wall, start painting. After painting it once, you need to use aluminum alloy to level it to ensure the smoothness of the wall.
7. Paint twice more
After the cabinet is installed, you need to paint twice more, but the thick base painted again is thinner than before.
8. Paint repair and polishing
After four coats of paint, the wall needs to be sanded and smoothed with sandpaper. After polishing, the walls and floors need to be cleaned.
9. Spray primer
After the paint is repaired, start spraying primer. The primer needs to be sprayed twice. After spraying the primer, you need to touch up, wait until the paint is dry, sand it again, and clean it again.
10. Spray the topcoat
After two coats of primer, start spraying the topcoat. The topcoat should also be sprayed on both sides. After that, the entire painting project is completed.
This is the paint construction process.
- Previous article:Nutritional value of meatballs
- Next article:Can shops be rent-free during the epidemic?
- Related articles
- Slogan of financial disclosure meeting
- Summary of Water-saving Copywriting in TV Advertisements (50 articles)
- Selected theme slogans of August 1st Army Day in 22
- Contents of hand-copied posters for epidemic prevention and control propaganda slogans
- What is the distance between the two doorposts of the European door?
- The company name is derived from the word Kang. The company name is related to the word Kang.
- There are many daily questions and answers about sun protection.
- Invigilating blackboard slogan
- I am bored to death. Is there anything interesting?
- The slogan of the class flag of the school sports meeting is 8 words