Safe and civilized construction plan template

The safe and civilized construction plan template takes the following plan as an example:

In order to strengthen standardized on-site management, improve the management level of each project department at the company's construction site, and enhance the company's own image, Build the company's brand strength, cater to the needs of the market, and aim to build a standard and standardized safe construction environment. Based on the existing relevant national and local laws, regulations, technical specifications and standards, and combined with the company's standard requirements, a safe and civilized management construction plan is formulated.

1. Production Safety System

Each unit must establish a sound construction site management organization, rules and regulations. It will be inspected by the company's superior departments. Safety construction management team leader: project manager, deputy team leader: deputy project production manager, project chief engineer team members: safety officer, foreman, mechanic, materials officer, team leader;

Clearly divide the projects Responsibility system for all personnel in the department to enable them to fulfill their responsibilities and obligations during the construction process. The project manager is the first person responsible for safety and is directly responsible for safe production. The project department must equip the corresponding number of experienced safety personnel according to the on-site construction environment. And the subordinate departments will regularly assess them;

Strict safety technical operating procedures are formulated, and the safety officers of the project department and experienced construction management personnel provide regular safety technical education and training to each team member ;

The safety leading group of the Xinjiang Branch conducts remote control of each project department at all times, conducts regular inspections of subordinate project departments, and puts forward rectification requirements for construction parts (plans) that do not meet the requirements.

2. Safety management goals: zero work-related fatalities, no serious injuries, injury rate per thousand people ≤ 0.3‰; eliminate major fire and mechanical casualties; zero occupational morbidity; prevent environmental pollution (noise, Dust, poison, and three wastes) compliance rate is 100%; the special operations personnel employment rate with certificates is 100%; the third-level safety education and training for construction workers on newly started projects reaches 100%; the accident injury insurance for newly started construction workers reaches 100% 100%.

3. Construction organization design

The construction organization design shall be formulated by technical personnel who are familiar with the site environment to ensure safe production at the construction site;

For some highly professional For difficult construction projects, a special safety construction organization design must be prepared separately. And submit it to the superior department for approval. Projects without approval will not be allowed to be constructed. Avoid blind construction without any safety measures. 1) Prevent accidents from falling from heights and being hit by objects: Strictly supervise that people entering the site must wear safety helmets, and personnel working at heights must wear safety belts; protection must be installed at the four entrances (stairways, reserved openings, elevator shafts, and passageways) Measures; ensure the firmness and stability of scaffolding, platforms, ramps, springboards and other facilities used for high-altitude operations; it is strictly prohibited for high-altitude workers to throw any materials from high places;

Prevent collapse accidents: prepare slopes or edges properly Slope support work should be carried out, and surrounding drainage should be done well; the support of the scaffolding should be calculated and scientific and reasonable, and the materials used must be strong; large formwork must be equipped with pads and tie rods, and the insertion rack must be tied firmly to maintain stability; Large hoisting components must be in place and welded firmly before hoisting and unhooking;

To prevent mechanical injury accidents: operations must be carried out in strict accordance with operating procedures and labor insurance regulations, and protective equipment must be worn as required; various equipment should be Safety limit devices, lifting weight controllers, interlock switches and other safety devices need to be equipped; crane commanders and drivers should strictly abide by operating procedures and are not allowed to operate in violation of regulations; all mechanical equipment and crane equipment must be regularly inspected, maintained and repaired. Ensure that it is sensitive and reliable;

Prevent electric shock accidents: improve the electricity management system, formulate installation standards, operation management, and regular inspection systems for electrical facilities; 5 or more temporary electrical equipment at the construction site or the total number of equipment For those with a capacity of 50kw and above, a temporary power construction organization design should be prepared. And it must comply with construction electricity specifications. According to the construction organization and construction plan, make a specific power consumption plan and use appropriate transformers; take good electrical equipment and protective measures, and adopt safe voltages; all electrical equipment must comply with the "one machine, one leakage, one gate, one open" box" principle.

Set up professional safety supervisory inspectors in electrical technology to regularly inspect electrical equipment at construction sites and workshops to eliminate hidden dangers in a timely manner; provide planned and organized training for all types of electricians, electrical equipment operators, welders and people who often come into contact with electricity to learn how to use electricity safely Knowledge and electricity management regulations, and unlicensed personnel are strictly prohibited from engaging in electrical work;

Prevention of poisoning, heat stroke accidents and occupational diseases: Toxic materials used by employees must be strictly kept, used in limited quantities, and Take anti-virus measures. Strictly abide by the operating procedures; take cooling, ventilation and other effective measures for those working in the open air during high temperatures and in summer. The canteen handled by the project department must have a health license and meet the inspection standards of the epidemic prevention station. The mixer should take measures such as sealing, dust removal, and dust removal to reduce the concentration of cement powder and make it meet the standards required by the country; improve the precision of the mechanical equipment, and take silencer measures.

IV. Safety technical briefing of division (sub-item) projects

Full-time safety officers from the project department and engineering professionals with rich work experience will organize personnel from each team to conduct various types of work Security technology briefing. For some special types of work such as (electricians, welders, hoists, gas welders, erectors), in addition to having job certificates, they should also be trained in safety technology;

In the process of safety technology briefing It should be highly targeted and comprehensive, and after the submission is completed, each construction worker should sign it and keep it in written form for the construction site archive.

5. Safety inspection

Insist on holding regular safety meetings. The company conducts a systematic safety inspection once a month and the project department once a week. Safety personnel from the project department inspect the construction site every day, record the construction techniques and unsafe factors of each team, put forward rectification suggestions, and urge the project to make rectifications;

Immediately issue rectification measures if major hidden dangers are discovered Notice. The inspection focuses on high-altitude operations, mechanical power, etc. to prevent accidents such as falling from heights, electric shocks, and mechanical injuries. Problems and hidden dangers found during the inspection must be rectified immediately to ensure safe construction, and written signatures must be perfected on safety issues. Achieve "orders and prohibitions".

6. Safety Education

Establish a safety education system. Before starting work, every worker entering the site should be given "three-level safety education" training, so that workers can fully understand the content of safety education and mentally realize that this is a major matter related to their own life safety. Collect the list of personnel who signed the safety education and keep it on file at the construction site.

7. Handling of Work-related Injury Accidents

The project department will conduct statistics on the injured persons in the project department every day, establish work-related injury accident files, and report the situation to the company's safety department before 25 days;

p>

Investigate and analyze the causes of work-related accidents and hold those responsible responsible accountable. Implement the principle of "four no-misses". (There is no third-level safety education, no preventive measures, the cause of the accident is unclear, and the responsibility investigation is not thorough). Prevent similar situations from happening in the future.

8. Requirements for civilized construction at the construction site

Promote modern management methods, organize construction scientifically, implement the requirements for civilized construction, and formulate a civilized inspection system for safe production in the project department based on the actual situation of the project. , fire management system and civilized construction guarantee measures, and do a good job in various management of the construction site;

Conscientiously implement publicity and implement national safety production and civilized construction laws, regulations and mandatory provisions;

A civilized construction leading group will be established on site, with the project manager in charge of on-site civilized construction. And a set of relevant civilized systems suitable for the characteristics of this project have been formulated, so that project managers must clarify "the principle of safety during pipe construction";

Set up various temporary facilities and stack bulk materials in accordance with the construction master plan layout. , finished products, semi-finished products and machinery and equipment shall not encroach on the roads and safety measures and protection facilities on the site;?

Clear signage should be set up at the construction site to ensure that five signs and one picture are complete. Indicate the name of the project, the name of the construction unit, the construction unit, the project manager and the general representative of the construction site, the start and completion dates, the construction permit approval number, etc. The construction unit is responsible for the protection of signage at the construction site. The main management personnel at the construction site should wear identity cards at the construction site;

The installation and use of power lines and power facilities at the construction site must comply with installation specifications and safe operating procedures, and arbitrary wire connections are strictly prohibited. electricity.

The construction site must be equipped with night lighting to ensure construction safety requirements. Lighting in dangerous and humid places and hand-held lighting fixtures must adopt voltages that meet safety requirements;

Do a good job in safety and security at the construction site and set up full-time case handling personnel On duty 24 hours a day, necessary anti-theft measures are taken, and containment facilities are set up around the site. Non-construction personnel are not allowed to enter without authorization;

Health personnel in the canteen must go to the local government agency to apply for a health license and related physical examination certificates . Incorporate employee dormitories (canteens) and civilized sanitation into the management system of the project department;

Control the environmental pollution and harm caused by various dust, waste gas, waste water, solid waste, noise, and vibration at the construction site, and clean up Construction waste should be packed in closed containers and bags. It is strictly forbidden to scatter it in the air to cause dust. Construction waste must be cleared away in time. When cleaning, appropriate amount of water should be sprinkled to reduce dust;

Concrete pumps and mortar machines are used for mixing on site. A sedimentation tank must be set up in front of the mechanical platform or cleared by the transport vehicle. The discharged wastewater must be discharged into the sedimentation tank. After two sedimentations, it can be discharged into the sewer pipe. Untreated slurry water is strictly prohibited from being discharged directly into the drainage pipe. facility. All on-site personnel must strengthen spiritual civilization, abide by professional ethics, reduce the impact of construction on the surrounding environment, have a dedicated person responsible for public relations coordination, listen to opinions and suggestions from relevant parties, and humbly accept inspections and criticisms. And make corrections where possible to meet the requirements of relevant departments so that the project can proceed smoothly.