Joke Collection Website - Bulletin headlines - Measures of Jilin Municipality for the Prevention and Control of Environmental Air Pollution
Measures of Jilin Municipality for the Prevention and Control of Environmental Air Pollution
The municipal environmental protection administrative department shall be responsible for delineating the city's urban ambient air functional zone and the high-pollution fuel no-burn zone in the built-up area. County (city) environmental protection administrative department is responsible for the delineation of the environmental air functional areas in this area. Fourth city, county (city) district environmental protection administrative departments to implement unified supervision and management of the prevention and control of environmental air pollution within their respective jurisdictions.
Public security, transportation, construction, municipal utilities, quality and technical supervision, urban management and law enforcement departments shall, in accordance with their respective responsibilities, do a good job in the prevention and control of environmental air pollution. Article 5 All units and individuals have the obligation to protect the ambient air, and have the right to report and complain to units and individuals that cause environmental air pollution. Article 6 The total emission control of environmental air pollutants and the pollutant emission permit system shall be implemented. It is forbidden to discharge without a license. Article 7 Where pollutants are discharged into the ambient air, the concentration and total amount of pollutants discharged shall not exceed the national and local emission standards and pollutant total control indicators, and sewage charges shall be paid according to regulations. Eighth the implementation of environmental air pollution prevention and control facilities inspection system. Testing shall be undertaken by the monitoring institutions of environmental protection administrative departments at all levels.
The intact rate, stable operation rate and pollutant removal rate of environmental air pollution prevention and control facilities must meet the design requirements. Ninth new construction, renovation and expansion of construction projects that discharge pollutants into the ambient air must comply with the environmental management regulations of construction projects.
It is forbidden to build new projects that do not conform to the national industrial policy.
It is forbidden to build new construction projects that seriously pollute the ambient air in the upwind direction of the dominant wind direction in the city. Tenth sewage units that cause serious environmental air pollution should be treated within a time limit.
The decision on the treatment within a time limit shall be made by the competent administrative department of environmental protection at all levels, and the pollutant discharge unit that has been treated within a time limit must complete the treatment task on schedule. Eleventh of the unreasonable layout, causing serious air pollution units, must be relocated in accordance with the requirements of the overall urban construction planning and environmental protection planning.
The technology and equipment listed in the backward production capacity, technology and product catalogue that the state has eliminated within a time limit must be eliminated on schedule. Twelfth the implementation of central heating and combined heating. Promote the use of clean energy such as natural gas, electricity, solar energy and clean coal.
Distributed heating boilers that do not meet the requirements of environmental protection in central heating and combined heating areas must be prohibited from being connected to the grid. Heating boilers that do not have grid-connected conditions must use clean energy. Article 13 New heating boilers and production boilers with raw coal below 10 tons (excluding 10 tons) and raw coal below 6 tons (excluding 6 tons) are prohibited in this Municipality.
Beishan, Longtan Mountain, Songhua Lake and Jiangnan Cultural District prohibit the construction of new boilers using heavy oil and residual oil as fuel, and the boilers that have been built must switch to clean energy.
County (city) people's government is located in the urban areas and towns to prohibit the construction of 2 tons (excluding 2 tons) of coal-fired heating boilers and production boilers. Article 14 It is forbidden to burn raw coal in production boilers and various stoves with a capacity of less than 6 tons (excluding 6 tons) in this city.
County (city) people's government is located in the urban areas and towns 2 tons (excluding 2 tons) of the following production boilers and all kinds of stoves, it is forbidden to burn raw coal. Fifteenth new boilers and industrial furnaces chimneys, must comply with the relevant provisions of the chimney height.
If the chimney height of boilers and industrial kilns does not meet the specified requirements, the maximum allowable emission concentration of pollutants is 50% of the emission standard value.
Catering and entertainment services must be equipped with lampblack purification facilities that meet the requirements of environmental protection, and special lampblack discharge pipelines must be set up, which must meet the requirements of relevant standards. Sixteenth production, sale and use of briquette sulfur fixation rate must reach more than 50%, dust fixation rate must reach more than 70%. Briquette shall not contain toxic and harmful combustion-supporting or sulfur-fixing additives. The flue gas emitted by burning briquette must meet the national standards. Seventeenth all kinds of boiler furnace operators must go through quality and technical supervision, technical training organized by the environmental protection department and obtain qualification certificates before taking up their posts. Eighteenth emissions of gases and aerosols containing radioactive substances must comply with the relevant provisions of the state, and shall not exceed the standard. Article 19 It is forbidden to pile up coal, fly ash, slag and other powders along the Songhua Lake, on both sides of the Songhua River urban section, on main streets and in residential areas.
Measures must be taken to prevent dust pollution when piling coal, fly ash, slag and other powdery materials in other places other than those specified in the preceding paragraph. When carrying out transportation, loading and unloading, batching and other operations that can emit dust, sealing or other protective measures must be taken. Article 20 Building construction must be enclosed, gradually dismantled by water jet, and distributed with commercial concrete in a centralized way. Construction wastes that are easy to generate dust should be closed and removed in time, and the completed site should be cleaned up.
It is forbidden to dump construction waste directly from upstairs.
It is forbidden to engage in construction operations that produce dust pollution in windy weather above level 5.
- Previous article:The slogan of caring for the elderly in Double Ninth Festival
- Next article:20 17 National Day Humorous Greetings to Employees
- Related articles
- The spirit of Beijing Winter Olympics includes
- There are several civilized cities in Hubei Province
- Hospital health poverty alleviation slogans
- Excerpts from team travel promotional slogans
- Introduction to yangko
- The Development Course of Shenzhen Zhouming Technology Co., Ltd.
- A four-word word that begins with the word "beauty".
- Novel slogan design
- What symbols are used to quote the title of promotional information?
- 80 safety production warning slogans and slogans